GITHUB AGENT SKILLS / 技能收录

给你的 AI 助手
装上专业技能

我们从 GitHub 持续收录、审核并分类优质的 Agent Skills,按职业与使用场景整理,复制一行命令即可安装到 Claude Code、Cursor 等智能体。

01 /

按职业浏览 Agent Skills

为不同岗位挑选的高频技能

全部职业
02 /

按使用场景浏览 Agent Skills

从你要完成的任务出发

全部场景
03 /

按创作者浏览 Agent Skills

按 GitHub Stars 排序的优秀创作者

全部创作者

全部 Skills 482556

product-on-purpose
product-on-purpose/pm-skills

tool-foundation-sprint-readiness

Pre-sprint diagnostic that determines whether a team should run a Foundation Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, and pre-sprint activities. Use when a team is considering starting a Foundation Sprint and wants a fast yes/no diagnosis before committing two days of facilitated work.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-foundation-sprint-magic-lenses

Day 2 afternoon move of a Foundation Sprint. Evaluates the candidate approach set through multiple lenses (4 classic plus at least 1 custom) to surface trade-offs, identify consistent winners and contradictions, and produce a top bet plus a backup plan. Use after Approach Options is signed. Lens scoring is a sense-making tool, not mathematical truth; arbitrary precision is a smell.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-foundation-sprint-founding-hypothesis

Day 2 end capstone move of a Foundation Sprint. Compresses the sprint's full strategic frame into a single canonical sentence (the Founding Hypothesis) plus an assumption scorecard, why-we-believe, what-could-prove-us-wrong, and recommended next validation step. Use after Magic Lenses is signed. Strict canonical template; paraphrase is not accepted in v0.1.0. The Founding Hypothesis is the spine artifact the sprint exists to produce.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-foundation-sprint-differentiation

Day 1 afternoon move of a Foundation Sprint. Converts the morning's Basics frame into a defensible strategic position by scoring differentiator candidates against customer-perceived value, choosing two committed differentiators, plotting alternatives on a 2x2 chart, writing decision principles, and producing a one-page Mini Manifesto. Use after Basics is signed; before Approach Options the next morning.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-foundation-sprint-brief

Pre-sprint brief that locks scope, the decision the sprint must unlock, team and role assignments, logistics, inputs to bring, and success criteria before Day 1 of a Foundation Sprint. Use after the readiness verdict is Go and before the sprint begins. Produces a one-page artifact the team and Decider sign off on as the contract for the next two days.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-foundation-sprint-basics

Day 1 morning move of a Foundation Sprint. Forces explicit team choices on target customer, important problem, team advantage, and competitors and alternatives. Produces a single coherent strategic frame that becomes the input to Day 1 afternoon Differentiation. Use after the sprint brief is signed and Day 1 morning is scheduled. Bundled artifact, not four separate decisions.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-foundation-sprint-approach-options

Day 2 morning move of a Foundation Sprint. Forces generation of 3 to 7 candidate approaches as one-page summaries before the team converges on a top bet. Use after Day 1 is signed and before Magic Lenses on Day 2 afternoon. Enforces a minimum of 3 approaches to prevent first-idea anchoring. Each approach summary names what it is, why it serves the differentiators, and includes a simple visual.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-design-sprint-test-and-score

Day 5 (Friday) sprint-closing move of a Design Sprint that produces the bundled Friday artifact covering per-customer interview observations, best quotes, scorecard grid (sprint questions by customers), observed patterns, hot takes from each team member, and the Decider summary (build, iterate, pivot, or stop, plus highest-confidence learning, most important revision, and next artifact). Use Friday after Thursday's prototype passes trial run and during/after the 5 customer interviews. The sprint's payoff artifact.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-design-sprint-sketch

Day 2 (Tuesday) move of a Design Sprint that structures lightning demos and the four-step independent solution sketch protocol (Notes, Ideas, Crazy 8s, Solution Sketch). Each team member produces one solution sketch individually; the skill orchestrates the day but does not author the sketches themselves. Use Tuesday morning after Monday's target moment is locked. Output is the lightning demo board, sketch assignments, and the cohort of independent sketches that become Wednesday's heat-map material.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-design-sprint-readiness

Pre-sprint diagnostic that determines whether a team should run a Design Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, customer recruiting plan, and pre-sprint activities. Use when a team is considering starting a Design Sprint and wants a fast yes/no diagnosis before committing five days of team time and customer recruiting cost.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-design-sprint-prototype-plan

Day 4 (Thursday) move of a Design Sprint that produces the planning artifact for the day. Output covers the prototype role plan (Maker, Stitcher, Writer, Asset Collector, Interviewer), prototype brief (what to build, fidelity bar, time allocation per role), canonical Five-Act Interview script (Welcome, Context, Intro, Tasks, Debrief), trial-run checklist, and Friday participant confirmation tracker. The actual prototype build is craft work outside the skill's AI invocation surface. Use Thursday morning after Wednesday's storyboard is signed off.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-design-sprint-map-and-target

Day 1 (Monday) move of a Design Sprint that produces the bundled Monday artifact containing long-term goal, sprint questions (3-7 testable risks), customer or system map (5-15 step flow), expert interview notes, HMW (How Might We) cluster board, and the Decider's chosen target moment. Use Day 1 morning and afternoon after the sprint brief is locked. Sets the design target for Tuesday's sketches and Wednesday's storyboard.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-design-sprint-decide-and-storyboard

Day 3 (Wednesday) move of a Design Sprint that runs the art museum layout, heat map, speed critique, straw poll, Decider supervote, rumble-vs-all-in-one decision, and the storyboard that drives Thursday's prototype build. The most decision-heavy day of the sprint. Use Wednesday morning and afternoon after Tuesday's sketches are collected and attribution-stripped. Produces the canonical 5-15 step storyboard that becomes the build spec.

★ 805
product-on-purpose
product-on-purpose/pm-skills

tool-design-sprint-brief

Pre-sprint brief that locks challenge, sprint questions, team and role assignments, customer recruiting plan, prototype medium, interview format, logistics, and success criteria before Monday of a Design Sprint. Use after the readiness verdict is Go and before Monday begins. Produces a two-page artifact the team and Decider sign off on as the contract for the next five days.

★ 805
product-on-purpose
product-on-purpose/pm-skills

measure-survey-analysis

Analyze survey results into actionable PM insights. Produces persona segmentation, hypothesis validation status, thematic clustering of open-text responses, statistical confidence labels, prioritized recommendations, and what-NOT-to-conclude warnings. Refuses to overstate statistical significance from weak samples or biased instruments.

★ 805
product-on-purpose
product-on-purpose/pm-skills

measure-okr-grader

Scores completed OKR sets at cycle close with KR-level scoring per the canonical OKR type enum (committed | aspirational | learning | operational_health | compliance_or_safety), committed-vs-aspirational interpretation, evidence quality assessment, learning synthesis, and next-cycle recommendations. Refuses to retroactively change targets or shrink committed scope, average away guardrail KRs, treat 0.7 as success for committed or compliance_or_safety KRs, equate effort with impact, or use scores for individual performance. Hands off to iterate-lessons-log, iterate-retrospective, define-hypothesis, measure-dashboard-requirements, measure-instrumentation-spec, and foundation-okr-writer.

★ 805
product-on-purpose
product-on-purpose/pm-skills

measure-instrumentation-spec

Specifies what analytics events to track, when they fire, and what properties to include, as a contract between product and engineering that prevents undertracked features. Use before engineering builds a feature or when auditing existing tracking for gaps. For the dashboard built on top of these events, use measure-dashboard-requirements instead.

★ 805
product-on-purpose
product-on-purpose/pm-skills

measure-experiment-results

Documents the results of a completed experiment or A/B test with statistical analysis, learnings, and recommendations. Use after experiments conclude to communicate findings, inform decisions, and build organizational knowledge.

★ 805