Day 1 (Monday) move of a Design Sprint that produces the bundled Monday artifact containing long-term goal, sprint questions (3-7 testable risks), customer or system map (5-15 step flow), expert interview notes, HMW (How Might We) cluster board, and the Decider's chosen target moment. Use Day 1 morning and afternoon after the sprint brief is locked. Sets the design target for Tuesday's sketches and Wednesday's storyboard.

License 许可
Apache-2.0
最近更新
2026-11-14
Stars
★ 805
Forks
102

01 前言 Front Matter

name
tool-design-sprint-map-and-target
license
Apache-2.0
metadata
{ "move": "map-and-target", "tool": "design-sprint", "roles": [ "facilitator", "decider", "pm", "design", "engineering", "researcher", "customer-expert" ], "author": "product-on-purpose", "inputs": [ "sprint brief", "existing research", "analytics", "customer examples", "expert interview transcripts (run during Monday)" ], "outputs": [ "long-term goal", "sprint questions", "customer or system map", "expert interview notes", "HMW cluster board", "target moment" ], "updated": 1783123200000, "version": "1.0.0", "category": "discovery", "frameworks": [ "design-sprint", "sprint", "character-note-and-vote" ], "prerequisites": [ "tool-design-sprint-brief" ], "classification": "tool", "timebox_minutes": 105 }
description
Day 1 (Monday) move of a Design Sprint that produces the bundled Monday artifact containing long-term goal, sprint questions (3-7 testable risks), customer or system map (5-15 step flow), expert interview notes, HMW (How Might We) cluster board, and the Decider's chosen target moment. Use Day 1 morning and afternoon after the sprint brief is locked. Sets the design target for Tuesday's sketches and Wednesday's storyboard.

02 资源文件 3

03 SKILL.md 正文

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

Design Sprint Map and Target (Monday)

Produce Monday's bundled artifact: the long-term goal that names success in 1-5 years; 3-7 sprint questions converting team fears into testable risks; a 5-15 step customer or system map from key player to outcome; expert interview notes from cameo experts run in parallel; HMW (How Might We) clusters synthesized from the team; and the Decider's chosen target moment. Monday's output becomes Tuesday's design target.

Family contract: site/src/content/docs/reference/skill-families/design-sprint-skills-contract.md. This skill is a member of design-sprint-skills.

When to Use

  • It is Day 1 of the Design Sprint and the brief is locked (via tool-design-sprint-brief).
  • The team is together (in-person, remote, or hybrid) for the full Monday workshop.
  • Expert interviews are scheduled for Monday afternoon (cameo role; 15-30 minutes each).
  • The team needs to converge from "five days of work ahead" to "this specific target moment is what we're prototyping."

When NOT to Use

  • The brief is not locked. Return to tool-design-sprint-brief; without sprint questions, this skill has nothing to converge toward.
  • The challenge is so broad that "long-term goal" would be longer than 5 years. Return to problem framing.
  • The team is missing the Decider. The target-moment selection at the end of Monday is the Decider's call; without that call the team disperses Tuesday with no agreed direction.
  • The team has already pre-decided the target moment. Monday's value is in the convergence; if it's been pre-decided, Monday becomes ratification theater.

What This Skill Produces

A single bundled artifact with six sections:

  1. Long-term goal: one sentence naming success in 1-5 years. Aspirational; cannot be hit in this sprint, but should be visible from the target moment.
  2. Sprint questions: 3-7 questions converting team fears into testable risks. Phrased as "Can we... ?" or "Will... ?" or "How... ?"; NOT phrased as solutions.
  3. Customer or system map: 5-15 step flow from key player(s) at the left to outcome (long-term goal) at the right. Includes major actors, decision points, and current alternatives.
  4. Expert interview notes: synthesized observations from 2-4 cameo experts interviewed Monday afternoon. Surfaced as HMW candidates for the cluster board.
  5. HMW cluster board: 30-100+ How Might We notes from the team, clustered into 4-8 themes; voted with tool-note-and-vote heat-map mechanic to surface top clusters.
  6. Target moment: the single point on the map (or a tight cluster of points) the Decider picks as the prototyping target. Wednesday's storyboard begins from here.

See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for the Brainshelf book-catalog Monday artifact.

Inference Inputs

Input What the skill does with it
Sprint brief (from tool-design-sprint-brief) Pulls the locked sprint questions as seed for refinement; pulls the challenge statement as the long-term goal seed; pulls the team roster for role assignments in note-and-vote
Existing research Used to draft the customer or system map; researcher walks the team through key findings during the map step
Analytics Quantitative grounding for the map's decision-point branch points and abandonment moments
Customer examples Concrete stories used to validate the map's key player and surface map-step gaps
Expert interview transcripts (run during Monday) Synthesized into HMW candidates by the moderator (typically PM or researcher) during the afternoon

Monday Time Structure

The full Monday workshop is approximately 7 hours (09:00-12:30 + 13:30-17:00). The skill's bundled artifact emerges across the day:

  • 09:00-09:30: Welcome + brief recap + introductions (does not produce artifact content)
  • 09:30-10:30: Long-term goal (one sentence) + draft sprint questions (3-7)
  • 10:30-12:30: Customer or system map draft (continuous-flow whiteboard work; team builds together)
  • 12:30-13:30: Lunch + first expert interview slot (cameo)
  • 13:30-15:30: Remaining expert interviews (3 slots; 25 min each); team captures HMWs continuously during interviews
  • 15:30-16:30: HMW cluster board synthesis; team adds final HMWs; Facilitator clusters; team heat-map votes via tool-note-and-vote
  • 16:30-17:00: Decider picks target moment; signs off; team disperses for Tuesday sketches

This skill's 105-minute timebox covers the facilitated synthesis sections (long-term goal + sprint questions + map draft + HMW clustering + target selection). Expert interviews and silent map-extension work happen in parallel and are not counted in the timebox.

Common Pitfalls

  • Long-term goal too short. "Ship Brainshelf MVP by Q3" is a roadmap goal, not a long-term goal. The long-term goal is 1-5 years out and aspirational ("Become the default way 25+/year readers remember and recall books").
  • Sprint questions phrased as solutions. "Build the camera-capture flow" is a solution; "Can we get sub-3-second capture without abandonment?" is a sprint question. The team must convert fears into questions, not predetermined answers.
  • Map too detailed. 5-15 steps, not 50. The map is for Decider orientation, not engineering documentation. If the map balloons, the Facilitator forces compression.
  • Skipping HMW because "we already know the opportunities." HMW's value is divergent surfacing followed by convergent voting. Pre-deciding the opportunities skips both halves.
  • Decider absent at target-moment selection. The whole point of Monday is the Decider's target choice. If the Decider must leave early, target selection must happen before they leave, even if HMW clustering compresses.
  • Expert interviews skipped or run by the wrong person. Experts bring outside context the team can't generate internally. Skipping them produces an inward-looking Monday. Running them as group calls (instead of small cameo conversations) wastes expert time and produces less useful HMW input.

Cross-Skill Usage

Prerequisites: tool-design-sprint-brief. Map-and-Target consumes the locked sprint brief and refines the sprint questions during the morning. Without a brief, this skill has no convergence target.

This skill invokes tool-note-and-vote twice during the day: once for HMW cluster heat-map voting (anonymous dot-voting to surface top 4-8 clusters) and optionally once for target-moment supervote when the Decider wants team input before deciding. The Decider's call is final regardless of team vote distribution.

Next invocation in the sprint: tool-design-sprint-sketch Tuesday morning.

Canonical Sources

Decider Checkpoint

This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider's call at the end of Monday is target-moment selection: a single point (or tight cluster of points) on the customer or system map that becomes Tuesday's design target. Without that selection, Tuesday's sketches diverge with no shared direction. The Decider also confirms the long-term goal, the sprint questions, and the top HMW clusters; these become Wednesday's heat-map orientation.

04 同仓库更多 Skills

product-on-purpose
product-on-purpose/pm-skills

utility-update-pm-skills

Checks for newer pm-skills releases, compares local vs. latest version, previews what would change, and updates local files after user confirmation. Generates a structured update report documenting changed files, new capabilities, and the value delta between versions. Use when you want to bring a local pm-skills installation up to date.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-slideshow-creator

Generates professional presentations from a JSON deck specification using 18 slide types with dark/light variants, content-to-layout decision logic, and calibrated character limits. Ships with a default professional theme.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-pm-workflow-orchestrator

Run an ordered sequence of pm-skills against one input, pausing for go/no-go and stopping on a failed or empty step. Accepts a saved prioritized action plan (Mode A) or an ad-hoc named chain (Mode B; the chain command routes here). Explicit invocation only; run --dry-run first while the native path is EXPERIMENTAL. To author a durable workflow instead, use utility-pm-workflow-builder.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-pm-workflow-builder

Guides a contributor from a workflow idea to a complete Workflow Implementation Packet (draft workflow file, draft workflow command, cross-cutting update checklist) in a staging area for review. Runs overlap analysis against the existing workflows with a Why Gate, then helps select and sequence skills with authored handoffs. Use when creating a new multi-skill workflow or promoting a repeated ad-hoc chain into a durable one. To build a single skill instead, use utility-pm-skill-builder; to run a sequence without authoring anything, use the chain command or utility-pm-workflow-orchestrator.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-pm-skill-validate

Audits an existing pm-skills skill against structural conventions and quality criteria. Produces a structured validation report with pass/fail checks, severity-graded findings, and actionable recommendations. Use when checking whether a skill meets repo standards before shipping or after making changes.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-pm-skill-iterate

Applies targeted improvements to an existing pm-skills skill based on feedback, validation reports, or convention changes. Reads current files, previews proposed changes, writes on confirmation, and suggests a version bump. Use when improving a skill after validation or feedback.

★ 805