Pre-sprint diagnostic that determines whether a team should run a Design Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, customer recruiting plan, and pre-sprint activities. Use when a team is considering starting a Design Sprint and wants a fast yes/no diagnosis before committing five days of team time and customer recruiting cost.

License 许可
Apache-2.0
最近更新
2026-11-14
Stars
★ 805
Forks
102

01 前言 Front Matter

name
tool-design-sprint-readiness
license
Apache-2.0
metadata
{ "move": "readiness", "tool": "design-sprint", "roles": [ "facilitator", "pm", "decider" ], "author": "product-on-purpose", "inputs": [ "challenge description", "existing hypothesis (from Foundation Sprint or other source)", "customer access status", "decider availability", "team composition draft" ], "outputs": [ "readiness verdict", "diagnosis", "recommended preconditions", "recommended attendee list", "customer recruiting plan", "pre-sprint activities" ], "updated": 1783123200000, "version": "1.0.0", "category": "coordination", "frameworks": [ "design-sprint", "sprint", "character-note-and-vote" ], "prerequisites": [], "classification": "tool", "timebox_minutes": 45 }
description
Pre-sprint diagnostic that determines whether a team should run a Design Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, customer recruiting plan, and pre-sprint activities. Use when a team is considering starting a Design Sprint and wants a fast yes/no diagnosis before committing five days of team time and customer recruiting cost.

02 资源文件 3

03 SKILL.md 正文

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

Design Sprint Readiness

Assess whether a Design Sprint fits the team's current situation. Design Sprint failure modes are expensive: five consecutive days of a 4-7 person team, plus customer recruiting cost (typically 5 strangers paid honoraria), plus the prototype build. A 30-45 minute readiness diagnostic catches the failure modes before that commitment is made.

Family contract: site/src/content/docs/reference/skill-families/design-sprint-skills-contract.md. This skill is a member of design-sprint-skills and conforms to the family frontmatter and Decider Checkpoint requirements.

When to Use

  • A team is considering starting a Design Sprint and needs a fast diagnosis before committing five days plus customer recruiting effort.
  • A team has just completed a Foundation Sprint and is deciding whether the next test should be a Design Sprint, a smaller experiment, or direct build. The Founding Hypothesis is consumed as optional input context (no separate bridge skill artifact is required).
  • An existing sprint commitment is on the calendar and the team wants to validate that prerequisites (Decider, customers, prototype medium) are in place.
  • Re-running a Design Sprint after an inconclusive first sprint: use to confirm the new challenge framing and customer access are ready.

When NOT to Use

  • The team has already decided to run the sprint and just needs the brief. Use tool-design-sprint-brief instead.
  • The team has no clear challenge and is still in discovery. Run problem framing or a Foundation Sprint first; a Design Sprint depends on a sprint-worthy challenge.
  • Low-stakes tweaks where five days of team time would be disproportionate. Use a lighter experiment design instead.
  • No customer access for Friday testing and no realistic recruiting plan. A Design Sprint that cannot test on Friday is just a four-day workshop with no learning event.
  • No Decider available and one cannot be appointed. Design Sprint requires fast decisions Wednesday and pre-test Thursday; without authority the sprint produces options without commitment.

What This Skill Produces

A single bundled artifact with six sections:

  1. Readiness verdict: Go / Conditional Go / Wait
  2. Diagnosis: what is in place, what is missing, what is uncertain
  3. Recommended preconditions (when verdict is Wait or Conditional Go): the prerequisite work the team should do before the sprint
  4. Recommended attendee list (when verdict is Go or Conditional Go): the 4-7 people who should be in the room, with role expectations
  5. Customer recruiting plan (when verdict is Go or Conditional Go): target profile, source, count, incentive, recruiter owner, recruiting deadline (typically 7-10 days before Friday)
  6. Pre-sprint activities (when verdict is Go): the prep work to complete in the days before Monday

See references/TEMPLATE.md for the canonical structure and references/EXAMPLE.md for a worked example using the Brainshelf book-catalog thread.

Inference Inputs

The skill runs an inference pass over these inputs to produce the verdict:

Input What the skill does with it
Challenge description Determines whether the challenge is sprint-worthy (specific enough to prototype in 4 days; big enough to justify 5 team-days)
Existing hypothesis (from Foundation Sprint or elsewhere) Confirms there is a testable bet, not exploratory discovery. Highest-risk assumption from the FS scorecard becomes a candidate sprint question
Customer access status Critical. Without realistic Friday customer access, the sprint cannot test
Decider name and full-week availability Confirms Decider can attend at least Monday morning, Wednesday morning (heat map + supervote), and Friday afternoon (Decider review); ideally all 5 days
Team composition draft Checks roster against the 4-7 person band; flags missing roles (engineering for prototype build, design for sketching, researcher or PM for customer interviews)
Prototype medium feasibility Confirms a 1-day prototype is achievable in the chosen medium (clickable, slideware, service role-play, paper, physical mock)
(Optional) Logistics constraints Confirms five consecutive days can actually be cleared by all attendees

If a load-bearing input is missing or low-confidence, the skill flags it explicitly and proposes how to close the gap before Monday.

Readiness Criteria (8 Canonical Checks)

The skill evaluates the team against these eight criteria, drawn from Sprint (Knapp, Zeratsky, Kowitz), GV "Is Your Idea Sprint-Worthy?", and Character Capital's Design Sprint guide:

  1. Challenge is named and sprint-worthy. Specific enough to prototype in 4 days; big enough that a wrong direction would be costly.
  2. Stakes are meaningful. The team would otherwise hesitate, debate, or default to building blindly. The sprint is justified by what it replaces.
  3. Decider is available for the load-bearing moments. Minimum: Monday morning (framing), Wednesday morning (heat map + supervote), Friday afternoon (Decider review). Ideally all 5 days.
  4. Team size is appropriate (4-7). Smaller than 4 weakens skill coverage; larger than 7 slows decision-making.
  5. Team can clear 5 consecutive days. No partial attendance for core participants; cameo experts may attend specific sessions.
  6. Customer access for Friday testing is secured (or recruitable in 7-10 days). 5 target-profile customers, paid honoraria, scheduled for Friday morning to early afternoon.
  7. Prototype medium is feasible in 1 day. Clickable (Figma), slideware (Keynote), service role-play, paper, physical mock, or other medium that can be built Thursday by 2 people.
  8. Sprint output has a path forward. The team is ready to act on validation (build, iterate, pivot to backup, or stop) when Friday's scorecard lands. Sprints without a downstream commitment become orphaned learnings.
Pattern Verdict
All 8 criteria met cleanly Go
1-2 criteria are "yellow flags" but addressable in the 1-2 weeks before Monday Conditional Go with documented prep
3 or more criteria fail, or any of 1, 3, or 6 is a hard fail Wait with recommended prerequisite work

Treat the criteria as load-bearing, not a checklist to game. A team that papers over no-customer-access with "we'll figure it out by Thursday" should get a Wait, not a Conditional Go.

Common Pitfalls

  • Sprint theater. Leadership has already decided what to build; the sprint is being run for political cover. The Friday scorecard cannot change the decision. If this is the situation, the honest verdict is Wait, and the team should escalate the misalignment rather than burn 5 days.
  • No Decider, or Decider-by-committee. A "Decider for the week" who lacks real authority cannot make the Wednesday supervote stick. If the genuine Decider cannot attend the load-bearing moments, postpone.
  • No customer access for Friday. This is the most common cause of failed sprints. Recruiting 5 strangers takes 7-10 days; recruiting starts as soon as readiness is Go, not Monday. If access is uncertain, the verdict is Wait until a recruiter and source are confirmed.
  • Challenge too broad to fit one week. "Redesign onboarding" is too broad; "design and test the first-time signup flow for B2B trial customers" is sprint-sized. If the challenge cannot be bounded, do problem framing first.
  • Conflating Design Sprint with Foundation Sprint. Foundation Sprint chooses strategic direction (2 days, no prototype, no customers). Design Sprint validates a chosen direction (5 days, prototype, customers). If the team has not chosen a direction, they need Foundation Sprint first, not Design Sprint.
  • Skipping the diagnostic because "we're going to run it anyway." Same failure mode as FS readiness: the cost of the diagnostic is 45 minutes; the cost of a failed sprint is 35-40 person-days plus customer honoraria plus opportunity cost.

Canonical Sources

Cross-Skill Usage

This skill is the entry point of the design-sprint-skills family. It has no prerequisites (the metadata.prerequisites field is intentionally empty).

When the verdict is Go, the natural next invocation is tool-design-sprint-brief to lock challenge, team, recruiting plan, prototype medium, and logistics. When the verdict is Wait, the team typically does prerequisite work (problem framing, Foundation Sprint, customer recruiting setup) before re-invoking this skill.

A team coming directly from a Foundation Sprint should bring the Founding Hypothesis as input context. The hypothesis's highest-risk assumption (typically marked in the FS assumption scorecard) becomes the lead candidate sprint question for tool-design-sprint-brief (which locks the sprint questions); tool-design-sprint-map-and-target on Monday then refines the locked questions during the morning. No bridge skill exists or is required; the narrative handoff is described in _workflows/foundation-to-design.md and in both user guides.

tool-note-and-vote may be invoked once during the readiness conversation if the team disagrees on whether a Design Sprint is the right tool (vs. a smaller experiment or direct build). In practice, the diagnostic is usually conclusive.

Decider Checkpoint

This skill ends with a Decider Checkpoint in references/TEMPLATE.md. The Decider signs off on the verdict (Go / Conditional Go / Wait), accepts the diagnosis, and explicitly commits to the load-bearing attendance windows. Without Decider sign-off, the verdict is advisory; with sign-off, it is the commitment that triggers (or postpones) the sprint and the recruiting work.

04 同仓库更多 Skills

product-on-purpose
product-on-purpose/pm-skills

utility-update-pm-skills

Checks for newer pm-skills releases, compares local vs. latest version, previews what would change, and updates local files after user confirmation. Generates a structured update report documenting changed files, new capabilities, and the value delta between versions. Use when you want to bring a local pm-skills installation up to date.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-slideshow-creator

Generates professional presentations from a JSON deck specification using 18 slide types with dark/light variants, content-to-layout decision logic, and calibrated character limits. Ships with a default professional theme.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-pm-workflow-orchestrator

Run an ordered sequence of pm-skills against one input, pausing for go/no-go and stopping on a failed or empty step. Accepts a saved prioritized action plan (Mode A) or an ad-hoc named chain (Mode B; the chain command routes here). Explicit invocation only; run --dry-run first while the native path is EXPERIMENTAL. To author a durable workflow instead, use utility-pm-workflow-builder.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-pm-workflow-builder

Guides a contributor from a workflow idea to a complete Workflow Implementation Packet (draft workflow file, draft workflow command, cross-cutting update checklist) in a staging area for review. Runs overlap analysis against the existing workflows with a Why Gate, then helps select and sequence skills with authored handoffs. Use when creating a new multi-skill workflow or promoting a repeated ad-hoc chain into a durable one. To build a single skill instead, use utility-pm-skill-builder; to run a sequence without authoring anything, use the chain command or utility-pm-workflow-orchestrator.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-pm-skill-validate

Audits an existing pm-skills skill against structural conventions and quality criteria. Produces a structured validation report with pass/fail checks, severity-graded findings, and actionable recommendations. Use when checking whether a skill meets repo standards before shipping or after making changes.

★ 805
product-on-purpose
product-on-purpose/pm-skills

utility-pm-skill-iterate

Applies targeted improvements to an existing pm-skills skill based on feedback, validation reports, or convention changes. Reads current files, previews proposed changes, writes on confirmation, and suggests a version bump. Use when improving a skill after validation or feedback.

★ 805