night
Autonomous work until morning — a pre-sleep check, the allowed list, auto-continue with fuses, a watchdog, a morning report. Use for "автономно до утра", "поработай ночью", "work overnight".
- License 许可
- MIT
- 最近更新
- 2026-11-08
- Stars
- ★ 3
- Forks
- 1
01 前言 Front Matter
- name
- night
- description
- Autonomous work until morning — a pre-sleep check, the allowed list, auto-continue with fuses, a watchdog, a morning report. Use for "автономно до утра", "поработай ночью", "work overnight".
03 SKILL.md 正文
Working overnight
The owner goes to sleep. In the morning the work is done or each stop is explained. The session is never idle (D046).
Triggers
- RU: «автономно до утра», «поработай ночью»
- EN: "work overnight", "keep going while I sleep"
1. The start phrase
The owner says what is allowed, in his own words, for example «автономно до утра: можно пушить». That is the night's allowed list (D016), «до утра» meaning until 12:00 local. Nothing outside it happens; no command is needed. Done when: the allowed list and its end are written in the status note and repeated to the owner in one line.
2. The pre-sleep check (one message, before he leaves)
- Sessions that must live until morning (cloud logins, GitHub, VPN) and when each expires: «AWS истекает в 03:00, обнови сейчас».
- Enough work for the night: the plan or the listed tasks, plus the fallback queue (step 4).
- Tasks that need the owner moved to the end or set aside.
- Enough subscription limit for the night. Only «готово к ночи» lets him go. Done when: that line is sent.
3. Set it running
bedrock session set autocontinue.until=<ISO end, UTC>and the first task inautocontinue.next, as in thedayskill.- The owner closes this session and, in his terminal, starts Claude under the watchdog,
which restarts a crash and stops at the end time:
bedrock night watch --until 12:00 -- claude --continue "продолжай ночной план". The prompt makes a restarted session pick the plan up instead of waiting for input. The watchdog also lifts Claude Code's cap on Stop-hook blocks in a row (CLAUDE_CODE_STOP_HOOK_BLOCK_CAP, 8 by default) to 60, so bedrock's own fuses stop first. - One commit per task. Progress lives in files. Done when: the watchdog is running.
4. Never idle
- A blocked task: mark it with the reason and a step-by-step instruction for the owner (D021), then start the next independent task.
- Main list done or blocked: the fallback queue inside the allowed list: refresh stale notes, add tests where coverage is thin, R1 and R2 backlog items marked "ok at night".
- A network or flaky failure is retried with a pause, not treated as a stop.
- Stop only when nothing is left or a limit is reached (D056). At 95% of the 5-hour window auto-continue stops by itself: the session finishes its step, writes a handoff and pauses until the window resets. The watchdog brings it back after the reset. Done when: every stopped task has its reason and the owner's steps in the status note.
5. Waking the owner
A notification only for P0 or a decision that blocks everything. With Remote Control
connected, a phone push through the PushNotification tool. Otherwise a desktop one:
bedrock notify p0 "<title>" "<what is needed>", or blocked in place of p0. Everything
else waits for the morning.
Done when: no other notification was sent.
6. The morning report
Plain text: what got done, what was left and why, the one question for the owner, the limit spent. The first night runs a small list; the morning looks at what misbehaved. Done when: the report is the first thing the owner sees in the session.
04 同仓库更多 Skills
writing
Write or rewrite skills, agent definitions, briefs and rule files by the D013 rules, then check them. Use for "напиши скилл", "поправь агента", "write a skill", "edit this brief".
triage
Bug triage — reproduce each report on the current version, group duplicates, set priority, decide fix, defer or decline. Use for "разбери баги", "что с репортами QA", "triage", "new bug reports".
start
Start a project with bedrock — a new one by interview, or an existing one by onboarding; writes the base, AGENTS.md, workspace settings and verified commands. Use for "новый проект", "подключи проект", "start a project".
review
Review gate for a finished block — deterministic checks, code review, plan-compliance review, silent fixes, rounds until clean. Use for "проверь", "ревью", "review this", before any PR.
retro
Weekly retro — read the week's logs, agents, reviews and failures, find what repeats, tune the system, plan a realistic next week. Use for "ретро", "итоги недели", "retro", "how did the week go".
next
Status navigator — what is done, what is left, who is waited on, can the owner rest. Use for "что дальше", "всё сделал?", "можно чиллить?", "what's next", "where are we".