AGENT SKILL

pmstudio-nfr

Detailed completeness audit of all project documents. Use when someone asks "are we ready for production", "audit our docs", "readiness check", "nfr tracker", or "what's missing". Do NOT use for a quick command listing — use /pmstudio instead. Scans every document for section-level completeness, reports staleness, and gives prioritized gap-closure recommendations.

License 许可
Apache-2.0
所属仓库
coco-research/coco
最近更新
2026-11-11
Stars
★ 631
Forks
15

01 前言 Front Matter

name
pmstudio-nfr
domain
ops
description
Detailed completeness audit of all project documents. Use when someone asks "are we ready for production", "audit our docs", "readiness check", "nfr tracker", or "what's missing". Do NOT use for a quick command listing — use /pmstudio instead. Scans every document for section-level completeness, reports staleness, and gives prioritized gap-closure recommendations.

02 资源文件 6

03 SKILL.md 正文

NFR Tracker — Operational Readiness Auditor

Purpose

Meta-command that discovers all project documents, checks existence and freshness, and produces a readiness dashboard with prioritized recommendations for what to create or update next.

Process

Step 1: Detect Project Context

Read these files to understand the project:

  1. CLAUDE.local.md — project name, type, architecture, folder structure
  2. .sync-watch.json — registered documents and watch directories
  3. Run ls -R on the project root to discover all files

Determine the product lifecycle stage from context:

  • Ideate/Build — pre-production (DR/IRP not yet required)
  • Production — live product (DR/IRP required)
  • Mixed — some components live, some building (e.g., ProductA production + ProductB ideate)

Step 2: Scan Document Registry

Check for each document type. For each, record: exists (Y/N), path, last modified date, stale (Y/N based on threshold).

Document registry:

Document Type Source Skill File Pattern Required When Staleness
PRD /prd-generator PRD/*.html, PRD/*.md Always 30 days
Project Memory (auto) CLAUDE.local.md Always 7 days
Presentation /project-docs Presentations/*.html Recommended 30 days
Architecture Map /project-docs Architecture/*.html, *Architecture*.html If PRD has architecture section 60 days
Stakeholder Directory /project-docs Data/Stakeholder*.xlsx, Data/Stakeholder*.md If >5 stakeholders 30 days
Change Log /change-log Data/Change-Log*.md Recommended 14 days
ARB Presentation /arb-review Presentations/ARB-*.html Before architecture review 90 days
DR Plan /dr-plan Operational/DR-Plan*.html Production 180 days
Incident Response Plan /irp Operational/IRP-*.html Production 180 days
Recovery Procedures /recovery-plan Operational/Recovery-*.html If DR Plan exists 180 days
Verification Report /project-docs Verification/*.md Before milestones 60 days

Staleness calculation: Compare file modification date to today. If (today - last_modified) > threshold, mark as STALE.

Search strategy: Use glob patterns first. If the project uses non-standard paths (from CLAUDE.local.md folder structure), adapt the search. Example: Some projects store PRDs in non-default paths like ProductB-Control-Framework/PRD/ not PRD/.

Step 3: Assess Completeness (Optional Deep Check)

If --deep flag or user requests "thorough check":

For each FOUND document, open it and check for key sections:

  • PRD: Has executive summary, requirements, timeline, risks? Missing sections = partial.
  • DR Plan: Has RTO/RPO targets, scenarios, procedures? Missing = partial.
  • IRP: Has severity matrix, escalation contacts, playbooks? Missing = partial.

Without --deep, existence + freshness is sufficient.

Step 4: Generate Recommendations

Prioritize missing/stale documents:

Priority logic:

  1. CRITICAL — Production product missing DR or IRP
  2. HIGH — Any required document missing or stale >2x threshold
  3. MEDIUM — Recommended document missing or stale >1x threshold
  4. LOW — Optional document missing

Each recommendation includes:

  • What to create/update
  • Why it matters
  • The slash command to run

Step 5: Output Report

Console output (default):

━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
 NFR TRACKER ► READINESS REPORT — {Project Name}
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

Lifecycle: {Production / Ideate / Mixed}
Scanned: {timestamp}

| Document              | Status  | Path              | Updated    | Stale? |
|-----------------------|---------|-------------------|------------|--------|
| ...                   | FOUND   | ...               | YYYY-MM-DD | No     |
| ...                   | MISSING | —                 | —          | —      |
| ...                   | FOUND   | ...               | YYYY-MM-DD | STALE  |

Coverage: N/M ({pct}%)    Stale: N    Missing: N

Recommendations:
1. [{priority}] {description}
   → Run: /{command}
...
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

Markdown file output (with --format md):

Write to Operational/Readiness-Report-{YYYY-MM-DD}.md with the same content plus a header with project metadata.

Modes

  • /nfr-tracker — Full audit, console output
  • /nfr-tracker --format md — Write report to file
  • /nfr-tracker --deep — Check document completeness, not just existence
  • /nfr-tracker --scope {name} — Filter to a specific product/instance within the project

Critical Rules

  1. Read-only. This skill never creates or modifies documents. It only reports.
  2. Adapt paths. Don't assume standard folder structure. Read CLAUDE.local.md for actual paths.
  3. No false positives. Only mark FOUND if the file has real content (>100 bytes). Empty scaffolds don't count.
  4. Date accuracy. Use file system modification date, not content parsing, for freshness checks.

04 同仓库更多 Skills

coco-research
coco-research/coco

trading-super-intelligence

Trading Super Intelligence Team. Named real-world personas across 8 cells. Built local-first (LM Studio) and validator-gated. Illustrative composites; see DISCLAIMER.md.

Skill与智能体开发
★ 631
coco-research
coco-research/coco

strategy-super-intelligence

Strategy Super Intelligence Team. Named real-world personas across 7 cells. Built local-first (LM Studio) and validator-gated. Illustrative composites; see DISCLAIMER.md.

Skill与智能体开发
★ 631
coco-research
coco-research/coco

risk-compliance-super-intelligence

Risk & Compliance (GRC) Super Intelligence Team. Named real-world personas across 7 cells. Built local-first (LM Studio) and validator-gated. Illustrative composites; see DISCLAIMER.md.

律师与法务Skill与智能体开发
★ 631
coco-research
coco-research/coco

product-design-super-intelligence

Your product + design brain trust and decision partner. Named personas across 8 cells spanning product strategy, discovery/research, growth/metrics, design foundations/usability, design leadership/craft, UX/content, design systems, and a…

产品经理设计师视觉设计资料检索与研究
★ 631
coco-research
coco-research/coco

legal-ip-super-intelligence

Your legal, IP, and regulatory brain trust. 31 named personas across 7 cells covering patent strategy, tech licensing, regulatory litigation, AI governance, open-source compliance, privacy law, and antitrust.

律师与法务Skill与智能体开发
★ 631
coco-research
coco-research/coco

healthcare-life-sciences-super-intelligence

Your healthcare and life sciences brain trust. 25 named personas across 7 cells covering drug discovery, medtech, biotech strategy, health policy, genomics, clinical trials, and healthcare economics.

Skill与智能体开发
★ 631