compare
Compare harness evaluation history — shows score trends, per-tier deltas, diminishing returns detection, and next grade projection.
- License 许可
- MIT
- 最近更新
- 2026-09-24
- Stars
- ★ 19
- Forks
- 2
01 前言 Front Matter
- name
- compare
- effort
- low
- description
- Compare harness evaluation history — shows score trends, per-tier deltas, diminishing returns detection, and next grade projection.
03 SKILL.md 正文
You are performing a harness evaluation comparison. This analyzes evaluation history to show trends and improvements.
Steps
-
Get evaluation history: Run:
HARNESS_EVAL_ROOT="${CLAUDE_PLUGIN_ROOT}" bash "${CLAUDE_PLUGIN_ROOT}/scripts/history.sh" "$(pwd)" listThis returns a JSON array of past evaluations, oldest first, each with
id,timestamp,mode,overall, andgrade. -
Check minimum history: If fewer than two evaluations exist, show the latest one's score and grade if there is one, then tell the user: "Not enough evaluation history to compare. Comparison needs at least two saved Standard or Full runs — run
/harness-eval:standardor/harness-eval:full(Quick runs are not saved to history)." Stop there; there is nothing to compare or save. -
Get comparison data: Run:
HARNESS_EVAL_ROOT="${CLAUDE_PLUGIN_ROOT}" bash "${CLAUDE_PLUGIN_ROOT}/scripts/history.sh" "$(pwd)" compareThis compares the latest entry with the one before it. It returns
currentandprevious(each withid,overall,grade,timestamp),delta.overall,delta.grade_changed, andper_tier.<tier>withcurrent,previous, anddeltaas checklist pass-rate ratios (0–1). It does not include each entry's mode; take that from the list output.If
currentandprevioushave different modes, say so before the tables: Standard (checklist) and Full (12-dimension) overall scores are not directly comparable. Full entries carry no checklist, so omit the per-tier table when either side is a Full run. If the list has an earlier entry with the current run's mode, you can also run compare with--eval-id <that entry's id>, which uses it asprevious, and show that like-for-like comparison as well, labeled with the entry it used. -
Present bilingual comparison report (English first, then
---, then Korean):# Harness Evaluation Comparison ## Current vs Previous | Metric | Previous | Current | Delta | |--------|----------|---------|-------| | Score | {prev_score}/10 | {curr_score}/10 | {delta} | | Grade | {prev_grade} | {curr_grade} | {changed?} | ## Per-Tier Changes (checklist pass rate) | Tier | Previous | Current | Delta | |------|----------|---------|-------| | Basic | {previous %} | {current %} | {delta, percentage points} ↑/↓/→ | | Functional | {previous %} | {current %} | {delta, percentage points} ↑/↓/→ | | Robust | {previous %} | {current %} | {delta, percentage points} ↑/↓/→ | | Production | {previous %} | {current %} | {delta, percentage points} ↑/↓/→ | --- # 하네스 평가 비교 ## 현재 vs 이전 | 지표 | 이전 | 현재 | 변화 | |------|------|------|------| | 점수 | {prev_score}/10 | {curr_score}/10 | {delta} | | 등급 | {prev_grade} | {curr_grade} | {changed?} | ## 단계별 변화 (체크리스트 통과율) | 단계 | 이전 | 현재 | 변화 | |------|------|------|------| | 기본 | {이전 %} | {현재 %} | {변화, %p} ↑/↓/→ | | 기능적 | {이전 %} | {현재 %} | {변화, %p} ↑/↓/→ | | 견고 | {이전 %} | {현재 %} | {변화, %p} ↑/↓/→ | | 프로덕션 | {이전 %} | {현재 %} | {변화, %p} ↑/↓/→ |Per-tier values come from
per_tier.<tier>in the compare output: ratios 0–1, shown as percentages, with the delta in percentage points. -
Score history chart: If 3+ evaluations exist, show an ASCII bar chart with one line per entry from the list output (illustrative):
## Score History eval-2026-04-06-001 standard ███████░░░ 7.2 B eval-2026-04-06-002 standard ████████░░ 7.9 B eval-2026-04-07-001 full █████████░ 8.5 A-Use █ for filled, ░ for empty, 10 chars total width; the number of filled chars is the score rounded to the nearest whole number.
-
Trend analysis (when the history mixes Standard and Full runs, compute trends within one mode):
- Diminishing returns: If the last 3+ deltas show shrinking improvements (e.g., +0.7, +0.6, +0.5), warn: "Score improvements are shrinking — further gains will require infrastructure investments (CI/CD, integration tests, performance benchmarks)."
- Grade projection: Based on current score and trend, estimate when the next grade threshold will be reached.
- Stalled areas: Identify tiers that haven't improved across evaluations.
-
Recommendations: Based on the comparison, suggest the highest-impact actions to continue improving.
-
Save reports to files: Save the English and Korean comparison reports as separate files:
mkdir -p .harness-eval/reports- English report:
.harness-eval/reports/{current.id}-compare-en.md - Korean report:
.harness-eval/reports/{current.id}-compare-ko.md
{current.id}iscurrent.idfrom the compare output. Use the Write tool to create each file. If a file of that name already exists (compare run again without a new evaluation in between), Read it first and then overwrite it, because the Write tool refuses to overwrite a file it has not read. Inform the user of the saved file paths. - English report:
Error Handling
- If history.sh exits with code 2 (script error): show the error and suggest checking dependencies (jq installed? correct path?)
- If compare returns an
errorobject: display it clearly
Tone
Be analytical and forward-looking. Focus on trajectory and momentum, not just current state.
Language
Always produce the report in both English and Korean. English section first, then a horizontal rule (---), then the Korean section. Tables, scores, and charts are identical in both sections — only the prose text (analysis, recommendations, warnings) differs.
04 同仓库更多 Skills
summarize
Summarize a document using an alias and the max effort level
standard
Standard harness evaluation — static analysis, dynamic testing, and checklist scoring in 2-3 minutes. Produces a detailed report with findings and improvement roadmap. Dynamic testing runs the target's hooks and tests after the user confirms. Pass --static-only for repositories you do not trust.
quick
Quick harness evaluation — checklist-based scoring in ~30 seconds. Runs deterministic checks against the target project and produces a score, grade, and improvement suggestions.
full
Full harness evaluation — multi-agent deep analysis across 12 dimensions (safety, completeness, design quality) with parallel evaluators and a synthesized report. Takes 5-10 minutes. Produces a scored report in English and Korean with an executive summary and improvement roadmap. Use when the user explicitly asks for a full, deep, or multi-agent harness evaluation. For a quick score use quick; for static plus dynamic checks use standard.
sync-docs
Bring harness-eval's CLAUDE.md files, architecture docs, and manifests back in line with the current code. Use when the user asks to sync or audit docs, or after structural changes.
release
Cut a harness-eval release - bump the version in the three manifest fields and the README version badge, update CHANGELOG (EN+KO), tag. Use only when the user asks to release.