[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M6MD9CM8RAB1FGRCV9ERPWJA":3,"skill-same:01M6MD9CM8RAB1FGRCV9ERPWJA":96},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":40,"linkOnly":41,"markdownContent":42,"markdownBody":43,"frontMatter":44,"refName":56,"commitSha":57,"skillDirectory":58,"forksCount":59,"repositoryHtmlUrl":60,"repositoryHomepageUrl":61,"ownerHtmlUrl":62,"ownerBlogUrl":63,"ownerDescription":64,"updatedAt":65,"install":66,"resources":79},"01M6MD9CM8RAB1FGRCV9ERPWJA","quality-problem-zeroing",null,"Run quality problem zeroing, perform 双归零 (double-five zeroing), write a technical zeroing report, write a management zeroing report, or close an aerospace quality problem under GB\u002FT 29076—2021. Covers problem reporting, emergency response, team formation, technical zeroing (定位准确、机理清楚、问题复现、 措施有效、举一反三), management zeroing (过程清楚、责任明确、措施落实、严肃处理、 完善规章), evidence gates, review, and closure. Use for aerospace or complex equipment failures, defects, accidents, repeated problems, human-responsibility problems, and issues requiring a formal closed-loop investigation.","hashgraph-online\u002Fawesome-codex-plugins","hashgraph-online","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F160371962?v=4","01M6CNB6NRJVNNGN14TR01Q6D3","HOL (Hashgraph Online)","01M6JT1HSKKG9V68KQAQGBA7XP",1575,"MIT","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fproblem-solving\u002Fquality-problem-zeroing\u002FSKILL.md",[],[19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39],"quality problem zeroing","quality","problem","evidence","2026","closure","defects","for","manufacturing","close","human","problem-solving","review","write","technical","loop","team","defense","reporting","issues","run","2026-11-10 10:12:30",false,"---\nname: quality-problem-zeroing\ndescription: >-\n  Run quality problem zeroing, perform 双归零 (double-five zeroing), write a\n  technical zeroing report, write a management zeroing report, or close an\n  aerospace quality problem under GB\u002FT 29076—2021. Covers problem reporting,\n  emergency response, team formation, technical zeroing (定位准确、机理清楚、问题复现、\n  措施有效、举一反三), management zeroing (过程清楚、责任明确、措施落实、严肃处理、\n  完善规章), evidence gates, review, and closure. Use for aerospace or complex\n  equipment failures, defects, accidents, repeated problems, human-responsibility\n  problems, and issues requiring a formal closed-loop investigation.\nlicense: MIT\nmetadata:\n  author: Crow12138\n  version: \"1.0\"\n  iso-9001: \"10.2 (supporting)\"\n  gbt-29076: \"2021\"\n  domain: quality-engineering\n  subdomain: problem-solving\n  industries: aerospace,defense,aviation,complex-equipment,manufacturing\n  status: approved\n  created: \"2026-07-04\"\n  last_updated: \"2026-07-04\"\n  updated_by: Crow12138\n  reviewed_by: RBraga01\n  standard_edition: \"GB\u002FT 29076—2021\"\n---\n\n# Quality Problem Zeroing\n\n## Goal\n\nClose a quality problem with objective evidence that:\n\n1. Locates and explains the technical failure;\n2. Removes every confirmed root cause and verifies the result;\n3. Identifies and repairs management weaknesses where required;\n4. Extends the learning to other exposed products, processes, and organizations; and\n5. Leaves no action, evidence, approval, or known residual risk hidden at closure.\n\nGB\u002FT 29076—2021 is the controlling source for scope, sequence, terminology, and closure.\nTreat other methods and publications as supporting guidance only. Read the\n[standard method guide](references\u002Fgbt-29076-2021-method-guide.md) whenever a\nformal scope decision, report, or closure review is required.\n\n## When to Use\n\nUse this skill for an aerospace or complex-equipment quality problem that requires formal\ntechnical zeroing, management zeroing, double-five zeroing, an Annex A-aligned report, or a\nclosure review. It is especially relevant to failures, defects, accidents, batch problems,\nrepeated problems, field or delivered-product issues, human-responsibility problems, and\nproblems caused by missing or inadequate rules.\n\nUse a narrower root-cause skill when the user only needs one analysis tool. Use 8D instead\nwhen the customer or sector mandates an 8D response, then cross-check whether the same event\nalso requires GB\u002FT 29076—2021 zeroing.\n\n## Required Execution Checklist\n\n- [ ] Record the product, problem phenomenon, operating state, time, location, environment, detector, and affected parties.\n- [ ] Protect the scene, product state, records, data, and physical evidence when safe to do so.\n- [ ] Assess safety, property, mission, delivered-product, and escalation risk immediately.\n- [ ] Identify, segregate, stop, recall, or inspect suspect product as required.\n- [ ] Form a cross-functional team with a named leader, authority, resources, and stakeholder representation.\n- [ ] Decide and document whether technical zeroing, management zeroing, or both apply.\n- [ ] Start technical zeroing first when both apply; never substitute it for management zeroing.\n- [ ] Build an evidence-backed technical causal chain from the lowest failed unit to the observed effect.\n- [ ] Identify all root causes; keep unproven explanations labelled as hypotheses.\n- [ ] Reproduce or otherwise verify the problem mechanism using an approved method.\n- [ ] Implement correction and root-cause corrective actions with owners and dates.\n- [ ] Verify effectiveness, sufficiency, and adverse effects before ending emergency controls.\n- [ ] Complete horizontal deployment across relevant products, processes, and organizations.\n- [ ] Reconstruct the management process and assign responsibility from duties and evidence.\n- [ ] Implement management actions and embed them in controlled rules, standards, or procedures.\n- [ ] Complete the required report, evidence list, signatures, and independent review.\n- [ ] Close only after all actions are complete, effectiveness is verified, and residual issues are explicit.\n\n## Workflow\n\n### 1. Report and preserve the problem\n\nCreate the initial problem record before analysis changes the evidence. Capture:\n\n- Product name, identifier, batch, configuration, development or service stage, and responsible organizations;\n- Exact phenomenon, expected requirement, actual result, operating state, sequence, time, location, and environment;\n- Who detected the problem and how it was detected;\n- Available logs, measurements, photographs, samples, remains, test equipment state, and operator records;\n- Actual and potential effect on safety, mission, customer, schedule, cost, performance, and delivered product.\n\nDo not dismantle, clean, power-cycle, overwrite logs, swap parts, or repeat a destructive\ntest until the evidence impact is assessed and the action is authorized.\n\n### 2. Apply emergency response\n\nWhen harm may continue or worsen:\n\n1. Identify and isolate suspect product;\n2. Stop work, delivery, use, or recall product where justified;\n3. Check related stock and the potentially affected population;\n4. Apply a temporary control against the apparent cause;\n5. Assess downstream and delivered-product risk;\n6. Confirm severity and notify affected internal and external parties.\n\nKeep emergency response separate from permanent corrective action. Remove it only after a\nmore effective root-cause action is implemented and verified.\n\n### 3. Form and govern the team\n\nInclude functions that own or understand the affected design, process, test, production,\nquality, supplier, use, and customer interfaces. Name:\n\n- The team leader and decision authority;\n- Each member's responsibility;\n- Required resources, constraints, milestones, communication cadence, and escalation route;\n- Customer, supplier, or other stakeholder representatives where affected.\n\nThe quality function controls the plan, conformity check, review, action tracking, and\nretention of evidence. The responsible organization performs the investigation.\n\n### 4. Decide the zeroing route\n\nApply **technical zeroing** when technical causes or consequences fall within the standard's\nscope, including significant design, production, test, field, delivered-product, batch,\nrepeat, cost, schedule, performance, effectiveness, or system-application issues.\n\nApply **management zeroing** to:\n\n- Repeated quality problems;\n- Human-responsibility problems such as knowingly disregarding a rule or violating an operation;\n- Problems caused by missing or inadequate rules;\n- Problems designated for management zeroing by the authorized management system.\n\nIf both scopes apply, perform both and begin with technical zeroing. Record the route,\nseverity level, responsible organization, target dates, and rationale. Do not assume every\ntechnical issue automatically requires punishment or management zeroing.\n\n### 5. Perform technical zeroing\n\n#### 5.1 Locate exactly — 定位准确\n\nDetermine the exact process, product, assembly, component, part, electronic component,\nsoftware element, interface, test equipment, or operation where the problem originates.\nReach the lowest failed unit supported by evidence and state its abnormal condition.\n\nCheck whether the source is the product, support equipment, test method, environment, or\noperation. Use controlled substitution only when it preserves evidence and its result is\nnot mistaken for proof of mechanism.\n\n**Gate:** The location and affected boundary are specific, evidence-backed, communicated,\nand accepted by relevant parties. “The system failed” or “the supplier part was bad” does\nnot pass.\n\n#### 5.2 Explain the mechanism — 机理清楚\n\nBuild the causal chain from abnormal factor to final phenomenon. Identify all root causes\nand explain the physical, chemical, electrical, software, human-system, or process mechanism.\nAnalyze the problem from three views:\n\n- **Product:** design, material, component, interface, software, equipment, and environment;\n- **Process:** requirements, design, procurement, production, inspection, test, change,\n  delivery, use, maintenance, and rework;\n- **Organization:** responsibility, competence, communication, resources, oversight, and rules.\n\nUse evidence to eliminate alternatives. Suitable tools include engineering analysis, failure\nanalysis, statistics, FTA, FMEA, Fishbone, 5-Why, process analysis, DOE, and comparison.\n\n**Gate:** Every claimed root cause has objective support, alternative explanations have a\ndocumented disposition, and the causal chain explains all material observations.\n\n#### 5.3 Reproduce or verify — 问题复现\n\nPrepare and approve a verification plan defining:\n\n- Hypothesis and expected phenomenon;\n- Test article and controlled configuration;\n- Variables, realistic conditions, instrumentation, data to collect, and acceptance criteria;\n- Safety limits, stop criteria, responsibilities, and required approvals.\n\nExecute the plan, preserve raw records, analyze results, and obtain stakeholder agreement.\nPrefer a controlled, mechanism-driven reproduction over an uncontrolled repeat.\n\nFor obvious one-off damage, destructive modes, or conditions that cannot be reproduced,\ndocument why a reproduction test is inappropriate and use theory, analysis, simulation,\ninspection, or an equivalent verification method. Do not convert “not reproduced” into\n“no problem.”\n\n**Gate:** The result confirms or rejects the location and mechanism. A failed confirmation\nreturns the investigation to localization or mechanism analysis.\n\n#### 5.4 Prove effective measures — 措施有效\n\nSeparate:\n\n- **Correction:** removes the detected problem from affected product;\n- **Corrective action:** removes each root cause to prevent recurrence;\n- **Preventive or deployment action:** protects similar products not yet affected.\n\nFor every root cause, define a specific, measurable, executable, and verifiable action with\nan owner, due date, required resources, affected configuration, and verification plan.\nEvaluate whether each action may create a new or worse risk.\n\nImplement approved actions in controlled design, process, test, software, training, or\nstandard documents. Compare post-action results with the original problem evidence.\n\n**Gate:** Evidence proves the actions are effective and sufficiently cover the operating\nrange without unacceptable adverse effects. If not, return to mechanism analysis.\n\n#### 5.5 Extend the learning — 举一反三\n\nSearch for the same or similar mechanism across:\n\n- The affected unit, batch, produced items, work in progress, and not-yet-produced items;\n- Related parts, interfaces, software, equipment, processes, suppliers, and product families;\n- Other programs, departments, and organizations exposed to the same cause.\n\nState the search population, method, findings, decisions, actions, owners, and evidence.\nIssue lessons learned or alerts through the quality function. Embed approved learning in\ndesign rules, process instructions, test requirements, training, databases, and tools.\n\n**Gate:** Horizontal deployment is based on mechanism and exposure, not merely on the same\npart number, and every finding has a disposition.\n\n### 6. Perform management zeroing\n\n#### 6.1 Make the process clear — 过程清楚\n\nReconstruct the complete event timeline and the process that created and detected the\nproblem. Compare required versus actual activities, records, decisions, controls, and\nhandoffs. Identify management weaknesses or gaps.\n\n#### 6.2 Make responsibility explicit — 责任明确\n\nAssign organizational and individual responsibility from documented duties, authority,\nactions, omissions, and evidence. Distinguish direct and indirect, primary and secondary,\nleadership and execution responsibility. Do not use responsibility analysis as a substitute\nfor systemic root-cause analysis.\n\n#### 6.3 Implement management measures — 措施落实\n\nAddress every management weakness with specific, checkable actions. Define the responsible\ndepartment and person, completion date, resources, implementation evidence, and effectiveness\ncheck. Plan and fund medium- and long-term actions explicitly.\n\n#### 6.4 Treat the problem seriously — 严肃处理\n\nUse the event to educate personnel and improve management. Apply training, communication,\ncoaching, or other organizational learning as appropriate. Apply administrative or economic\npenalties only under applicable rules for confirmed repeated problems, human-responsibility\nproblems, falsification, or concealment. Recognize proactive discovery and effective\nprevention where organizational policy allows.\n\n#### 6.5 Perfect the rules — 完善规章\n\nConvert management actions into controlled management-system documents, standards,\nprocedures, work instructions, or governance mechanisms. Define revision content, owner,\napproval, effective date, deployment, training, and compliance verification.\n\n**Management gate:** The process, responsibility, actions, treatment, and rules are each\nsupported by evidence and address the identified management causes.\n\n### 7. Report, review, and close\n\nUse the [zeroing report template](assets\u002Fzeroing-report-template.md). For formal work, include\nthe report sections and evidence described in Annex A of GB\u002FT 29076—2021.\n\nBefore closure, an authorized review must verify:\n\n- Route selection and scope were correct;\n- Localization and mechanism are evidence-backed;\n- Reproduction or alternative verification is adequate;\n- Every technical and management cause has an implemented action;\n- Effectiveness and adverse effects were evaluated;\n- Horizontal deployment and document changes are complete;\n- Reports, evidence identifiers, signatures, approvals, residual issues, and recommendations\n  are complete.\n\nClose and disband the team only after all actions are implemented and verified, lessons are\ndeployed, and affected parties are told that zeroing is complete.\n\nIf complete zeroing is not feasible for a flight test or in-orbit issue, document the reason,\nanalyze all plausible root causes, implement comprehensive controls against them, identify\nresidual risk, and obtain the required approval. Never label an unresolved hypothesis as a\nconfirmed cause.\n\n## Supporting Methods and Related Skills\n\nRead [engineering methods](references\u002Fengineering-methods.md) when choosing troubleshooting,\nreproduction, measure-verification, controlled-experimentation, or workflow-control methods.\nThese methods are advisory and cannot weaken a standard gate.\n\n- Use [NCR writing](..\u002F..\u002Fdocumentation\u002Fncr-writing\u002F) to document a detected nonconformance\n  when the organization's quality system requires an NCR before zeroing.\n- Use [Is\u002FIs-Not](..\u002Fis-is-not-scoping\u002F) to define the observed boundary.\n- Use [Fishbone](..\u002Ffishbone-analysis\u002F) to generate candidate causes.\n- Use separate [5-Why](..\u002F5why-root-cause\u002F) chains for distinct causal paths.\n- Use [PFMEA](..\u002F..\u002Frisk-analysis\u002Fpfmea-process\u002F) or\n  [DFMEA](..\u002F..\u002Frisk-analysis\u002Fdfmea-design\u002F) to evaluate action risk and update prevention\n  controls, and update the [Control Plan](..\u002F..\u002Fplanning\u002Fcontrol-plan\u002F) when process controls\n  change.\n- Use [CAR](..\u002F..\u002Fdocumentation\u002Fcar-corrective-action\u002F) when the organization requires a\n  separate corrective-action record for implementation and effectiveness follow-up.\n- Use [8D](..\u002F8d-problem-solving\u002F) when a customer or sector requires the 8D format; do not\n  claim that an 8D automatically satisfies GB\u002FT 29076—2021 without checking every zeroing gate.\n\nFramework handoff:\n\n`Detection \u002F NCR → zeroing route decision → technical and\u002For management zeroing → corrective\naction → FMEA \u002F Control Plan \u002F controlled-document updates → evidence review → closure`\n\n## Validation Criteria\n\nReject closure if any answer is “no”:\n\n1. Is the exact failure location proven to the lowest practicable unit?\n2. Does the mechanism explain the observations and all confirmed root causes?\n3. Was the mechanism reproduced or otherwise verified with justified evidence?\n4. Does each action map to a confirmed cause and have implementation evidence?\n5. Was action effectiveness verified over a relevant range and checked for adverse effects?\n6. Was the exposed population searched across product, process, and organization?\n7. Where management zeroing applies, are process, responsibility, actions, treatment, and\n   rules complete?\n8. Are evidence, controlled-document revisions, reviews, approvals, residual risks, and\n   stakeholder communications traceable?\n\n## Common Mistakes\n\n- Treating repair, rework, sorting, inspection, or emergency containment as root-cause action;\n- Confusing failure location with root cause or a plausible cause with a proven mechanism;\n- Repeating a test without new instrumentation, controlled variables, or a stated hypothesis;\n- Choosing only one convenient root cause when evidence supports multiple causes;\n- Using “operator error” or “supplier problem” as the end of analysis;\n- Punishing people by default instead of correcting the management system;\n- Declaring “no similar issue found” without defining the searched population and method;\n- Closing tasks in a workflow system and assuming the quality problem is therefore zeroed;\n- Changing “完善规章” into the weaker phrase “improve the mechanism” without controlled documents;\n- Adding a sixth normative technical-zeroing requirement; knowledge extraction belongs within\n  horizontal deployment and document institutionalization.\n\n## Output Content\n\nProduce, as applicable:\n\n1. Problem and impact statement;\n2. Emergency response and affected-population record;\n3. Team, plan, zeroing-route decision, and milestones;\n4. Technical zeroing report with five evidence gates;\n5. Management zeroing report with five evidence gates;\n6. Cause-to-action-to-evidence traceability matrix;\n7. Horizontal-deployment register;\n8. Residual-risk and unresolved-item register;\n9. Review checklist, approval decision, and closure statement.\n\n## Output Format\n\nAt the start of each use, ask the user:\n\n> \"How would you like to receive the output?\n> **A** — Structured Markdown (formatted tables and sections, ready to copy)\n> **B** — Plain tables (simplified structure for Excel or Word)\n> **C** — Narrative report (flowing text for a formal document or email)\n>\n> Default: A.\"\n\nAdapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.\n\n## Reference Files\n\n- [GB\u002FT 29076—2021 method guide](references\u002Fgbt-29076-2021-method-guide.md)\n- [Engineering methods and research notes](references\u002Fengineering-methods.md)\n- [Technical and management zeroing report template](assets\u002Fzeroing-report-template.md)\n\n## Changelog\n\n| Version | Date | Author | Change |\n|---------|------|--------|--------|\n| 1.0 | 2026-07-04 | @Crow12138 | Initial draft based on GB\u002FT 29076—2021 |\n","# Quality Problem Zeroing\n\n## Goal\n\nClose a quality problem with objective evidence that:\n\n1. Locates and explains the technical failure;\n2. Removes every confirmed root cause and verifies the result;\n3. Identifies and repairs management weaknesses where required;\n4. Extends the learning to other exposed products, processes, and organizations; and\n5. Leaves no action, evidence, approval, or known residual risk hidden at closure.\n\nGB\u002FT 29076—2021 is the controlling source for scope, sequence, terminology, and closure.\nTreat other methods and publications as supporting guidance only. Read the\n[standard method guide](references\u002Fgbt-29076-2021-method-guide.md) whenever a\nformal scope decision, report, or closure review is required.\n\n## When to Use\n\nUse this skill for an aerospace or complex-equipment quality problem that requires formal\ntechnical zeroing, management zeroing, double-five zeroing, an Annex A-aligned report, or a\nclosure review. It is especially relevant to failures, defects, accidents, batch problems,\nrepeated problems, field or delivered-product issues, human-responsibility problems, and\nproblems caused by missing or inadequate rules.\n\nUse a narrower root-cause skill when the user only needs one analysis tool. Use 8D instead\nwhen the customer or sector mandates an 8D response, then cross-check whether the same event\nalso requires GB\u002FT 29076—2021 zeroing.\n\n## Required Execution Checklist\n\n- [ ] Record the product, problem phenomenon, operating state, time, location, environment, detector, and affected parties.\n- [ ] Protect the scene, product state, records, data, and physical evidence when safe to do so.\n- [ ] Assess safety, property, mission, delivered-product, and escalation risk immediately.\n- [ ] Identify, segregate, stop, recall, or inspect suspect product as required.\n- [ ] Form a cross-functional team with a named leader, authority, resources, and stakeholder representation.\n- [ ] Decide and document whether technical zeroing, management zeroing, or both apply.\n- [ ] Start technical zeroing first when both apply; never substitute it for management zeroing.\n- [ ] Build an evidence-backed technical causal chain from the lowest failed unit to the observed effect.\n- [ ] Identify all root causes; keep unproven explanations labelled as hypotheses.\n- [ ] Reproduce or otherwise verify the problem mechanism using an approved method.\n- [ ] Implement correction and root-cause corrective actions with owners and dates.\n- [ ] Verify effectiveness, sufficiency, and adverse effects before ending emergency controls.\n- [ ] Complete horizontal deployment across relevant products, processes, and organizations.\n- [ ] Reconstruct the management process and assign responsibility from duties and evidence.\n- [ ] Implement management actions and embed them in controlled rules, standards, or procedures.\n- [ ] Complete the required report, evidence list, signatures, and independent review.\n- [ ] Close only after all actions are complete, effectiveness is verified, and residual issues are explicit.\n\n## Workflow\n\n### 1. Report and preserve the problem\n\nCreate the initial problem record before analysis changes the evidence. Capture:\n\n- Product name, identifier, batch, configuration, development or service stage, and responsible organizations;\n- Exact phenomenon, expected requirement, actual result, operating state, sequence, time, location, and environment;\n- Who detected the problem and how it was detected;\n- Available logs, measurements, photographs, samples, remains, test equipment state, and operator records;\n- Actual and potential effect on safety, mission, customer, schedule, cost, performance, and delivered product.\n\nDo not dismantle, clean, power-cycle, overwrite logs, swap parts, or repeat a destructive\ntest until the evidence impact is assessed and the action is authorized.\n\n### 2. Apply emergency response\n\nWhen harm may continue or worsen:\n\n1. Identify and isolate suspect product;\n2. Stop work, delivery, use, or recall product where justified;\n3. Check related stock and the potentially affected population;\n4. Apply a temporary control against the apparent cause;\n5. Assess downstream and delivered-product risk;\n6. Confirm severity and notify affected internal and external parties.\n\nKeep emergency response separate from permanent corrective action. Remove it only after a\nmore effective root-cause action is implemented and verified.\n\n### 3. Form and govern the team\n\nInclude functions that own or understand the affected design, process, test, production,\nquality, supplier, use, and customer interfaces. Name:\n\n- The team leader and decision authority;\n- Each member's responsibility;\n- Required resources, constraints, milestones, communication cadence, and escalation route;\n- Customer, supplier, or other stakeholder representatives where affected.\n\nThe quality function controls the plan, conformity check, review, action tracking, and\nretention of evidence. The responsible organization performs the investigation.\n\n### 4. Decide the zeroing route\n\nApply **technical zeroing** when technical causes or consequences fall within the standard's\nscope, including significant design, production, test, field, delivered-product, batch,\nrepeat, cost, schedule, performance, effectiveness, or system-application issues.\n\nApply **management zeroing** to:\n\n- Repeated quality problems;\n- Human-responsibility problems such as knowingly disregarding a rule or violating an operation;\n- Problems caused by missing or inadequate rules;\n- Problems designated for management zeroing by the authorized management system.\n\nIf both scopes apply, perform both and begin with technical zeroing. Record the route,\nseverity level, responsible organization, target dates, and rationale. Do not assume every\ntechnical issue automatically requires punishment or management zeroing.\n\n### 5. Perform technical zeroing\n\n#### 5.1 Locate exactly — 定位准确\n\nDetermine the exact process, product, assembly, component, part, electronic component,\nsoftware element, interface, test equipment, or operation where the problem originates.\nReach the lowest failed unit supported by evidence and state its abnormal condition.\n\nCheck whether the source is the product, support equipment, test method, environment, or\noperation. Use controlled substitution only when it preserves evidence and its result is\nnot mistaken for proof of mechanism.\n\n**Gate:** The location and affected boundary are specific, evidence-backed, communicated,\nand accepted by relevant parties. “The system failed” or “the supplier part was bad” does\nnot pass.\n\n#### 5.2 Explain the mechanism — 机理清楚\n\nBuild the causal chain from abnormal factor to final phenomenon. Identify all root causes\nand explain the physical, chemical, electrical, software, human-system, or process mechanism.\nAnalyze the problem from three views:\n\n- **Product:** design, material, component, interface, software, equipment, and environment;\n- **Process:** requirements, design, procurement, production, inspection, test, change,\n  delivery, use, maintenance, and rework;\n- **Organization:** responsibility, competence, communication, resources, oversight, and rules.\n\nUse evidence to eliminate alternatives. Suitable tools include engineering analysis, failure\nanalysis, statistics, FTA, FMEA, Fishbone, 5-Why, process analysis, DOE, and comparison.\n\n**Gate:** Every claimed root cause has objective support, alternative explanations have a\ndocumented disposition, and the causal chain explains all material observations.\n\n#### 5.3 Reproduce or verify — 问题复现\n\nPrepare and approve a verification plan defining:\n\n- Hypothesis and expected phenomenon;\n- Test article and controlled configuration;\n- Variables, realistic conditions, instrumentation, data to collect, and acceptance criteria;\n- Safety limits, stop criteria, responsibilities, and required approvals.\n\nExecute the plan, preserve raw records, analyze results, and obtain stakeholder agreement.\nPrefer a controlled, mechanism-driven reproduction over an uncontrolled repeat.\n\nFor obvious one-off damage, destructive modes, or conditions that cannot be reproduced,\ndocument why a reproduction test is inappropriate and use theory, analysis, simulation,\ninspection, or an equivalent verification method. Do not convert “not reproduced” into\n“no problem.”\n\n**Gate:** The result confirms or rejects the location and mechanism. A failed confirmation\nreturns the investigation to localization or mechanism analysis.\n\n#### 5.4 Prove effective measures — 措施有效\n\nSeparate:\n\n- **Correction:** removes the detected problem from affected product;\n- **Corrective action:** removes each root cause to prevent recurrence;\n- **Preventive or deployment action:** protects similar products not yet affected.\n\nFor every root cause, define a specific, measurable, executable, and verifiable action with\nan owner, due date, required resources, affected configuration, and verification plan.\nEvaluate whether each action may create a new or worse risk.\n\nImplement approved actions in controlled design, process, test, software, training, or\nstandard documents. Compare post-action results with the original problem evidence.\n\n**Gate:** Evidence proves the actions are effective and sufficiently cover the operating\nrange without unacceptable adverse effects. If not, return to mechanism analysis.\n\n#### 5.5 Extend the learning — 举一反三\n\nSearch for the same or similar mechanism across:\n\n- The affected unit, batch, produced items, work in progress, and not-yet-produced items;\n- Related parts, interfaces, software, equipment, processes, suppliers, and product families;\n- Other programs, departments, and organizations exposed to the same cause.\n\nState the search population, method, findings, decisions, actions, owners, and evidence.\nIssue lessons learned or alerts through the quality function. Embed approved learning in\ndesign rules, process instructions, test requirements, training, databases, and tools.\n\n**Gate:** Horizontal deployment is based on mechanism and exposure, not merely on the same\npart number, and every finding has a disposition.\n\n### 6. Perform management zeroing\n\n#### 6.1 Make the process clear — 过程清楚\n\nReconstruct the complete event timeline and the process that created and detected the\nproblem. Compare required versus actual activities, records, decisions, controls, and\nhandoffs. Identify management weaknesses or gaps.\n\n#### 6.2 Make responsibility explicit — 责任明确\n\nAssign organizational and individual responsibility from documented duties, authority,\nactions, omissions, and evidence. Distinguish direct and indirect, primary and secondary,\nleadership and execution responsibility. Do not use responsibility analysis as a substitute\nfor systemic root-cause analysis.\n\n#### 6.3 Implement management measures — 措施落实\n\nAddress every management weakness with specific, checkable actions. Define the responsible\ndepartment and person, completion date, resources, implementation evidence, and effectiveness\ncheck. Plan and fund medium- and long-term actions explicitly.\n\n#### 6.4 Treat the problem seriously — 严肃处理\n\nUse the event to educate personnel and improve management. Apply training, communication,\ncoaching, or other organizational learning as appropriate. Apply administrative or economic\npenalties only under applicable rules for confirmed repeated problems, human-responsibility\nproblems, falsification, or concealment. Recognize proactive discovery and effective\nprevention where organizational policy allows.\n\n#### 6.5 Perfect the rules — 完善规章\n\nConvert management actions into controlled management-system documents, standards,\nprocedures, work instructions, or governance mechanisms. Define revision content, owner,\napproval, effective date, deployment, training, and compliance verification.\n\n**Management gate:** The process, responsibility, actions, treatment, and rules are each\nsupported by evidence and address the identified management causes.\n\n### 7. Report, review, and close\n\nUse the [zeroing report template](assets\u002Fzeroing-report-template.md). For formal work, include\nthe report sections and evidence described in Annex A of GB\u002FT 29076—2021.\n\nBefore closure, an authorized review must verify:\n\n- Route selection and scope were correct;\n- Localization and mechanism are evidence-backed;\n- Reproduction or alternative verification is adequate;\n- Every technical and management cause has an implemented action;\n- Effectiveness and adverse effects were evaluated;\n- Horizontal deployment and document changes are complete;\n- Reports, evidence identifiers, signatures, approvals, residual issues, and recommendations\n  are complete.\n\nClose and disband the team only after all actions are implemented and verified, lessons are\ndeployed, and affected parties are told that zeroing is complete.\n\nIf complete zeroing is not feasible for a flight test or in-orbit issue, document the reason,\nanalyze all plausible root causes, implement comprehensive controls against them, identify\nresidual risk, and obtain the required approval. Never label an unresolved hypothesis as a\nconfirmed cause.\n\n## Supporting Methods and Related Skills\n\nRead [engineering methods](references\u002Fengineering-methods.md) when choosing troubleshooting,\nreproduction, measure-verification, controlled-experimentation, or workflow-control methods.\nThese methods are advisory and cannot weaken a standard gate.\n\n- Use [NCR writing](..\u002F..\u002Fdocumentation\u002Fncr-writing\u002F) to document a detected nonconformance\n  when the organization's quality system requires an NCR before zeroing.\n- Use [Is\u002FIs-Not](..\u002Fis-is-not-scoping\u002F) to define the observed boundary.\n- Use [Fishbone](..\u002Ffishbone-analysis\u002F) to generate candidate causes.\n- Use separate [5-Why](..\u002F5why-root-cause\u002F) chains for distinct causal paths.\n- Use [PFMEA](..\u002F..\u002Frisk-analysis\u002Fpfmea-process\u002F) or\n  [DFMEA](..\u002F..\u002Frisk-analysis\u002Fdfmea-design\u002F) to evaluate action risk and update prevention\n  controls, and update the [Control Plan](..\u002F..\u002Fplanning\u002Fcontrol-plan\u002F) when process controls\n  change.\n- Use [CAR](..\u002F..\u002Fdocumentation\u002Fcar-corrective-action\u002F) when the organization requires a\n  separate corrective-action record for implementation and effectiveness follow-up.\n- Use [8D](..\u002F8d-problem-solving\u002F) when a customer or sector requires the 8D format; do not\n  claim that an 8D automatically satisfies GB\u002FT 29076—2021 without checking every zeroing gate.\n\nFramework handoff:\n\n`Detection \u002F NCR → zeroing route decision → technical and\u002For management zeroing → corrective\naction → FMEA \u002F Control Plan \u002F controlled-document updates → evidence review → closure`\n\n## Validation Criteria\n\nReject closure if any answer is “no”:\n\n1. Is the exact failure location proven to the lowest practicable unit?\n2. Does the mechanism explain the observations and all confirmed root causes?\n3. Was the mechanism reproduced or otherwise verified with justified evidence?\n4. Does each action map to a confirmed cause and have implementation evidence?\n5. Was action effectiveness verified over a relevant range and checked for adverse effects?\n6. Was the exposed population searched across product, process, and organization?\n7. Where management zeroing applies, are process, responsibility, actions, treatment, and\n   rules complete?\n8. Are evidence, controlled-document revisions, reviews, approvals, residual risks, and\n   stakeholder communications traceable?\n\n## Common Mistakes\n\n- Treating repair, rework, sorting, inspection, or emergency containment as root-cause action;\n- Confusing failure location with root cause or a plausible cause with a proven mechanism;\n- Repeating a test without new instrumentation, controlled variables, or a stated hypothesis;\n- Choosing only one convenient root cause when evidence supports multiple causes;\n- Using “operator error” or “supplier problem” as the end of analysis;\n- Punishing people by default instead of correcting the management system;\n- Declaring “no similar issue found” without defining the searched population and method;\n- Closing tasks in a workflow system and assuming the quality problem is therefore zeroed;\n- Changing “完善规章” into the weaker phrase “improve the mechanism” without controlled documents;\n- Adding a sixth normative technical-zeroing requirement; knowledge extraction belongs within\n  horizontal deployment and document institutionalization.\n\n## Output Content\n\nProduce, as applicable:\n\n1. Problem and impact statement;\n2. Emergency response and affected-population record;\n3. Team, plan, zeroing-route decision, and milestones;\n4. Technical zeroing report with five evidence gates;\n5. Management zeroing report with five evidence gates;\n6. Cause-to-action-to-evidence traceability matrix;\n7. Horizontal-deployment register;\n8. Residual-risk and unresolved-item register;\n9. Review checklist, approval decision, and closure statement.\n\n## Output Format\n\nAt the start of each use, ask the user:\n\n> \"How would you like to receive the output?\n> **A** — Structured Markdown (formatted tables and sections, ready to copy)\n> **B** — Plain tables (simplified structure for Excel or Word)\n> **C** — Narrative report (flowing text for a formal document or email)\n>\n> Default: A.\"\n\nAdapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.\n\n## Reference Files\n\n- [GB\u002FT 29076—2021 method guide](references\u002Fgbt-29076-2021-method-guide.md)\n- [Engineering methods and research notes](references\u002Fengineering-methods.md)\n- [Technical and management zeroing report template](assets\u002Fzeroing-report-template.md)\n\n## Changelog\n\n| Version | Date | Author | Change |\n|---------|------|--------|--------|\n| 1.0 | 2026-07-04 | @Crow12138 | Initial draft based on GB\u002FT 29076—2021 |\n",{"name":5,"license":15,"metadata":45,"description":7},{"author":46,"domain":47,"status":48,"created":49,"version":50,"iso-9001":51,"gbt-29076":52,"subdomain":30,"industries":53,"updated_by":46,"reviewed_by":54,"last_updated":49,"standard_edition":55},"Crow12138","quality-engineering","approved","2026-07-04","1.0","10.2 (supporting)","2021","aerospace,defense,aviation,complex-equipment,manufacturing","RBraga01","GB\u002FT 29076—2021","main","2b63f856ce19c2a797929cacabd9e0fc936812fa","plugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fproblem-solving\u002Fquality-problem-zeroing",491,"https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins","https:\u002F\u002Fhol.org\u002Fplugins\u002Fbest-codex-plugins","https:\u002F\u002Fgithub.com\u002Fhashgraph-online","https:\u002F\u002Fhol.org","Open-source standards and developer tools for interoperable AI agents: discovery, identity, communication, payments, privacy and security.","2026-11-14 14:06:13",{"source":8,"skillName":5,"commands":67,"prompt":77,"zipAvailable":78},[68,71,74],{"tool":69,"command":70},"npx","npx skills add hashgraph-online\u002Fawesome-codex-plugins --skill quality-problem-zeroing",{"tool":72,"command":73},"bunx","bunx skills add hashgraph-online\u002Fawesome-codex-plugins --skill quality-problem-zeroing",{"tool":75,"command":76},"pnpm","pnpm dlx skills add hashgraph-online\u002Fawesome-codex-plugins --skill quality-problem-zeroing","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fproblem-solving\u002Fquality-problem-zeroing\u002FSKILL.md",true,[80,86,92],{"path":81,"resourceType":82,"resourceTypeDesc":83,"sizeBytes":84,"sourceHtmlUrl":85},"assets\u002Fzeroing-report-template.md","ASSET","资产文件",11472,"https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fproblem-solving\u002Fquality-problem-zeroing\u002Fassets\u002Fzeroing-report-template.md",{"path":87,"resourceType":88,"resourceTypeDesc":89,"sizeBytes":90,"sourceHtmlUrl":91},"references\u002Fengineering-methods.md","REFERENCE","参考文档",10724,"https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fproblem-solving\u002Fquality-problem-zeroing\u002Freferences\u002Fengineering-methods.md",{"path":93,"resourceType":88,"resourceTypeDesc":89,"sizeBytes":94,"sourceHtmlUrl":95},"references\u002Fgbt-29076-2021-method-guide.md",14233,"https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fproblem-solving\u002Fquality-problem-zeroing\u002Freferences\u002Fgbt-29076-2021-method-guide.md",[97,106,114,122,130,138],{"skillNo":98,"name":99,"nameZh":6,"description":100,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":101,"sourceHtmlUrl":102,"categories":103,"keywords":104,"publishedAt":105},"01M7DV332YQMGD8WTRJ9DZQXTB","worktable-review-with-annotations","Create, inspect, reply to, update, or resolve situated Worktable annotations. Use when feedback belongs to a Doc section, block, text range, or HTML Doc, or when the user asks to address existing review feedback and coordinate a requested artifact edit.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-review-with-annotations\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-review-with-annotations\u002FSKILL.md",[],[],"2026-11-15 14:19:17",{"skillNo":107,"name":108,"nameZh":6,"description":109,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":110,"sourceHtmlUrl":111,"categories":112,"keywords":113,"publishedAt":105},"01M7DV2YGHCZVBEB1AHYB6CGHE","worktable-find-and-synthesize-context","Find, assess, and synthesize context from Worktable Docs and Records. Use when the user asks what a workspace contains, wants workspace-backed research, needs current facts reconciled across artifacts, or requests a cited synthesis without changing workspace state.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-find-and-synthesize-context\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-find-and-synthesize-context\u002FSKILL.md",[],[],{"skillNo":115,"name":116,"nameZh":6,"description":117,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":118,"sourceHtmlUrl":119,"categories":120,"keywords":121,"publishedAt":105},"01M7DV2TQN1H11ME2SAF9MXN7V","worktable-create-or-update-docs","Create, edit, rename, or maintain narrative Worktable Docs. Use for plans, decisions, briefs, notes, research syntheses, and other durable prose when the user requests a new artifact or a safe update to an existing one.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-update-docs\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-update-docs\u002FSKILL.md",[],[],{"skillNo":123,"name":124,"nameZh":6,"description":125,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":126,"sourceHtmlUrl":127,"categories":128,"keywords":129,"publishedAt":105},"01M7DV2NE452NEA8TXATKSNAJH","worktable-create-or-manage-records","Organize repeated structured information as durable Worktable Records. Use for research datasets, inventories, directories, pipelines, trackers, and other collections whose items need identity, fields, filtering, links, validation, or individual updates.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-records\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-records\u002FSKILL.md",[],[],{"skillNo":131,"name":132,"nameZh":6,"description":133,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":134,"sourceHtmlUrl":135,"categories":136,"keywords":137,"publishedAt":105},"01M7DV2HENRBR2KSCVM064WH0Y","worktable-create-or-manage-interactive-html","Create or improve durable visual and interactive artifacts in Worktable. Use for dashboards, trackers, calculators, mini apps, slide presentations, and other requests that benefit from a polished HTML Doc.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-interactive-html\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-interactive-html\u002FSKILL.md",[],[],{"skillNo":139,"name":140,"nameZh":6,"description":141,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":142,"sourceHtmlUrl":143,"categories":144,"keywords":145,"publishedAt":105},"01M7DV2CADR5R7RQFFYPNAGR9Y","worktable-collaborate-threads","Read, answer, and hand off messages through durable Worktable threads with users or other authenticated participants. Use when the user asks to check addressed messages, reply to a participant, continue a thread, request another agent's help, wait briefly for a response, or watch for comments and messages sent to the agent.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-collaborate-threads\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-collaborate-threads\u002FSKILL.md",[],[]]