[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M6MD7YA30ZWRX2N1N9FGB25E":3,"skill-same:01M6MD7YA30ZWRX2N1N9FGB25E":89},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":43,"linkOnly":44,"markdownContent":45,"markdownBody":46,"frontMatter":47,"refName":59,"commitSha":60,"skillDirectory":61,"forksCount":62,"repositoryHtmlUrl":63,"repositoryHomepageUrl":64,"ownerHtmlUrl":65,"ownerBlogUrl":66,"ownerDescription":67,"updatedAt":68,"install":69,"resources":82},"01M6MD7YA30ZWRX2N1N9FGB25E","control-plan",null,"Control Plan — build, review, or audit a Prototype, Pre-launch, or Production Control Plan linked to PFMEA failure modes and controls. Use when creating a new control plan, updating after a process change or corrective action, or auditing an existing CP for completeness and PFMEA alignment. Covers AIAG Control Plan reference manual and IATF 16949 §8.5.1.","hashgraph-online\u002Fawesome-codex-plugins","hashgraph-online","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F160371962?v=4","01M6CNB6NRJVNNGN14TR01Q6D3","HOL (Hashgraph Online)","01M6JT1HSKKG9V68KQAQGBA7XP",1575,"MIT","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fplanning\u002Fcontrol-plan\u002FSKILL.md",[],[19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40,41,42],"plan","control plan","control","pre-launch","new","2026","automotive","when","modes","Existing","for","action","corrective action","manual","review","electronics","controls","medical","general","alignment","use","audit","planning","change","2026-11-10 10:12:30",false,"---\nname: control-plan\ndescription: >-\n  Control Plan — build, review, or audit a Prototype, Pre-launch, or Production Control Plan linked\n  to PFMEA failure modes and controls. Use when creating a new control plan, updating after a process\n  change or corrective action, or auditing an existing CP for completeness and PFMEA alignment.\n  Covers AIAG Control Plan reference manual and IATF 16949 §8.5.1.\nlicense: MIT\nmetadata:\n  author: RBraga01\n  version: \"1.1\"\n  iso-9001: \"8.5.1\"\n  iatf-16949: \"8.5.1\"\n  aiag-reference: \"AIAG Control Plan Reference Manual\"\n  domain: quality-engineering\n  subdomain: planning\n  industries: automotive,electronics,aerospace,medical,general\n  status: approved\n  created: \"2026-06-06\"\n  last_updated: \"2026-06-06\"\n  updated_by: migmcc\n  reviewed_by: RBraga01\n  standard_edition: \"AIAG Control Plan Reference Manual (1995) \u002F IATF 16949:2016 §8.5.1\"\n---\n\n# Control Plan\n\n## When to use\n\nUse this skill when:\n- Creating a new Control Plan for prototype, pre-launch, or production\n- Reviewing an existing Control Plan for completeness and accuracy\n- Updating the CP after a process change, corrective action (D7), or PFMEA update\n- Auditing a supplier's Control Plan during qualification or an IATF audit\n- Linking PFMEA controls to the Control Plan after FMEA review\n\n## Prerequisites\n\n- Process Flow Diagram (required — CP must mirror the process flow sequence)\n- PFMEA (required — CP controls derive from PFMEA recommended actions)\n- Drawing with ballooned characteristics and tolerance data\n- List of special and significant characteristics (SC, CC, KPC, KCC)\n- MSA results for measurement systems referenced in the CP (for production CP)\n\n## Workflow\n\n### Step 1 — Determine the CP type\n\n| Type | When | Purpose |\n|------|------|---------|\n| **Prototype** | During prototype builds | Describes dimensional, material, and functional tests in prototype phase |\n| **Pre-launch** | After prototype, before PPAP | Describes controls in place during pilot\u002Fpre-production runs |\n| **Production** | After PPAP approval, at SOP | The living document — updated throughout product life |\n\nAll three types may coexist during APQP phases. The Production CP is the one submitted as PPAP Element 7.\n\n### Step 2 — Build the Control Plan structure\n\nThe CP is a table with one row per characteristic per process step. Each row contains:\n\n**Header section (document-level):**\n- Control Plan number and revision\n- Part number and revision\n- Part name \u002F description\n- Supplier \u002F plant\n- Supplier code (OEM code)\n- Key contact \u002F phone\n- Core team (multi-functional)\n- Date (original) and date (revised)\n- Customer engineering approval (name\u002Fdate) — if required\n- Customer quality approval (name\u002Fdate) — if required\n- Supplier approval (name\u002Fdate)\n\n**Detail columns (one row per characteristic):**\n\n| Column | What to enter |\n|--------|--------------|\n| Part\u002Fprocess number | Reference number from Process Flow |\n| Process name \u002F operation description | Name of the process step |\n| Machine, device, jig, or tool | Equipment used at this step |\n| Number | Characteristic number (links to balloon drawing) |\n| Product characteristic | Product feature being controlled (dimension, material property, appearance) |\n| Process characteristic | Process parameter being controlled (temperature, pressure, speed, torque) |\n| Special characteristic classification | SC, CC, KPC, KCC, *, ▲ per customer symbology |\n| Product\u002Fprocess specification \u002F tolerance | Nominal value and tolerance band |\n| Evaluation \u002F measurement technique | Gauge type, method, or test used |\n| Sample size | Number of parts per sample |\n| Frequency | How often samples are taken (every hour, every lot, 100%) |\n| Control method | How the process is controlled (SPC chart, go\u002Fno-go gauge, visual, 100% inspection) |\n| Reaction plan | What to do if out-of-control or out-of-specification (who, what action, containment) |\n\n### Step 3 — Populate from PFMEA\n\nFor each high-severity failure mode in the PFMEA:\n1. Identify the current prevention and detection controls from the PFMEA\n2. Transfer these controls into the corresponding CP row\n3. The reaction plan must address what happens if the control detects a non-conformance\n\nEvery special characteristic (SC, CC, ★, ◆) in the PFMEA must appear in the CP.\nEvery recommended action completed in the PFMEA must be reflected in the updated CP controls.\n\n### Step 4 — Special characteristics — mandatory coverage\n\n| Classification | OEM symbol | CP requirement |\n|----------------|-----------|----------------|\n| Safety \u002F Regulatory | ★ SC \u002F ⬟ | 100% inspection OR demonstrated Cpk ≥ 1.67 + statistical monitoring |\n| Critical Characteristic | CC \u002F ◆ | Same as above — automatic stop if out of spec |\n| Significant Characteristic | SC (Ford) \u002F KPC | Process monitoring with defined sample plan and reaction |\n| Key Control Characteristic | KCC | Process parameter monitoring (not product) — SPC or other control |\n\n**OEM symbol conventions vary.** Always use the exact symbol specified in the customer's CSR:\n- Ford: CC (Critical Characteristic) and SC (Significant Characteristic) — do not use ★ or ◆\n- GM: ★ for safety-critical; Δ for significant\n- VW \u002F Audi: D (design feature, = CC), E (significant characteristic), I (functional dimension) per FORMEL Q\n- BMW: G-SC (significant characteristic), G-CC (critical characteristic) per BMW standard\n- Stellantis: CC and SC per MAQMSR — requires AIAG-VDA FMEA format alignment\n\nUsing the wrong symbol for the customer's OEM is an immediate finding at PPAP and IATF audit.\n\nFor all special characteristics: the reaction plan must specify who is notified, containment action, and when the process can restart.\n\n### Step 5 — Reaction plan requirements\n\nEvery row in the CP must have a reaction plan. Minimum requirements:\n\n- **Who** is responsible for taking action\n- **What** immediate containment is applied (tag, sort, hold, stop production)\n- **Who** is notified (supervisor, quality, engineering)\n- **When** production may restart (after what verification)\n- Reference to relevant Work Instruction or SOP for the reaction\n\nA reaction plan that says only \"notify supervisor\" or \"quarantine parts\" is insufficient — it must specify the next step after notification.\n\n### Step 6 — Audit an existing Control Plan\n\nWhen reviewing a supplier's or internal CP, check:\n\n**Structure:**\n- [ ] All process steps from the Process Flow are represented\n- [ ] Each special characteristic has its own dedicated row\n- [ ] Revision level matches the current PFMEA and drawing revision\n\n**Characteristics:**\n- [ ] All SC\u002FCC\u002FKPC\u002FKCC are listed with correct classification symbols\n- [ ] Product AND process characteristics are both covered (not just product)\n- [ ] Tolerances match the current released drawing\n\n**Controls:**\n- [ ] Measurement technique is specific (gauge type, not just \"measure\")\n- [ ] Sample size and frequency are defined (not \"as required\" or \"as needed\")\n- [ ] 100% inspection is specified where Cpk \u003C 1.33\n- [ ] SPC control charts are specified for characteristics where they are required\n\n**Reaction plan:**\n- [ ] Every row has a reaction plan\n- [ ] Reaction plans specify concrete actions (not just \"notify supervisor\")\n- [ ] Reaction plans are consistent with PFMEA failure mode severity\n\n**Alignment:**\n- [ ] CP controls match PFMEA current controls column for each failure mode\n- [ ] Completed PFMEA recommended actions are reflected in updated controls\n- [ ] CP revision date is more recent than most recent PFMEA update date\n\n## Validation criteria\n\nA complete Production Control Plan for PPAP submission must:\n- Cover every operation in the Process Flow\n- Include every special and significant characteristic with correct classification\n- Have a MSA-validated measurement system for every variable characteristic on SC\u002FCC\n- Have a reaction plan for every row\n- Be signed by the APQP team (multi-functional) and have customer approval if required\n- Match the PFMEA revision level\n\n## Common mistakes\n\n- Control Plan created without reference to PFMEA — controls are generic, not linked to actual failure modes\n- Reaction plan says \"notify supervisor\" only — not a reaction plan, just escalation\n- Missing process characteristics — CP only controls product dimensions, not process parameters like temperature or torque\n- Sample plan says \"as required\" — must specify a number and frequency\n- SC\u002FCC characteristics not identified with correct customer symbol — auditor will flag this immediately\n- CP not updated after D7 of an 8D — the most common disconnect in corrective action systems\n- Gauge type not specified — \"visual inspection\" or \"measure\" is not sufficient; must name the tool\n\n## Output Format\n\nAt the start of each use, ask the user:\n\n> \"How would you like to receive the output?\n> **A** — Structured Markdown (formatted tables and sections, ready to copy)\n> **B** — Plain tables (simplified structure for Excel or Word)\n> **C** — Narrative report (flowing text for a formal document or email)\n>\n> Default: A.\"\n\nAdapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.\n\n## Changelog\n\n| Version | Date | Author | Change |\n|---------|------|--------|--------|\n| 1.0 | 2026-06-06 | @RBraga01 | Initial release |\n| 1.1 | 2026-06-06 | @migmcc | Added OEM-specific special characteristic symbol conventions (Ford, GM, VW, BMW, Stellantis) in Step 4 |\n","# Control Plan\n\n## When to use\n\nUse this skill when:\n- Creating a new Control Plan for prototype, pre-launch, or production\n- Reviewing an existing Control Plan for completeness and accuracy\n- Updating the CP after a process change, corrective action (D7), or PFMEA update\n- Auditing a supplier's Control Plan during qualification or an IATF audit\n- Linking PFMEA controls to the Control Plan after FMEA review\n\n## Prerequisites\n\n- Process Flow Diagram (required — CP must mirror the process flow sequence)\n- PFMEA (required — CP controls derive from PFMEA recommended actions)\n- Drawing with ballooned characteristics and tolerance data\n- List of special and significant characteristics (SC, CC, KPC, KCC)\n- MSA results for measurement systems referenced in the CP (for production CP)\n\n## Workflow\n\n### Step 1 — Determine the CP type\n\n| Type | When | Purpose |\n|------|------|---------|\n| **Prototype** | During prototype builds | Describes dimensional, material, and functional tests in prototype phase |\n| **Pre-launch** | After prototype, before PPAP | Describes controls in place during pilot\u002Fpre-production runs |\n| **Production** | After PPAP approval, at SOP | The living document — updated throughout product life |\n\nAll three types may coexist during APQP phases. The Production CP is the one submitted as PPAP Element 7.\n\n### Step 2 — Build the Control Plan structure\n\nThe CP is a table with one row per characteristic per process step. Each row contains:\n\n**Header section (document-level):**\n- Control Plan number and revision\n- Part number and revision\n- Part name \u002F description\n- Supplier \u002F plant\n- Supplier code (OEM code)\n- Key contact \u002F phone\n- Core team (multi-functional)\n- Date (original) and date (revised)\n- Customer engineering approval (name\u002Fdate) — if required\n- Customer quality approval (name\u002Fdate) — if required\n- Supplier approval (name\u002Fdate)\n\n**Detail columns (one row per characteristic):**\n\n| Column | What to enter |\n|--------|--------------|\n| Part\u002Fprocess number | Reference number from Process Flow |\n| Process name \u002F operation description | Name of the process step |\n| Machine, device, jig, or tool | Equipment used at this step |\n| Number | Characteristic number (links to balloon drawing) |\n| Product characteristic | Product feature being controlled (dimension, material property, appearance) |\n| Process characteristic | Process parameter being controlled (temperature, pressure, speed, torque) |\n| Special characteristic classification | SC, CC, KPC, KCC, *, ▲ per customer symbology |\n| Product\u002Fprocess specification \u002F tolerance | Nominal value and tolerance band |\n| Evaluation \u002F measurement technique | Gauge type, method, or test used |\n| Sample size | Number of parts per sample |\n| Frequency | How often samples are taken (every hour, every lot, 100%) |\n| Control method | How the process is controlled (SPC chart, go\u002Fno-go gauge, visual, 100% inspection) |\n| Reaction plan | What to do if out-of-control or out-of-specification (who, what action, containment) |\n\n### Step 3 — Populate from PFMEA\n\nFor each high-severity failure mode in the PFMEA:\n1. Identify the current prevention and detection controls from the PFMEA\n2. Transfer these controls into the corresponding CP row\n3. The reaction plan must address what happens if the control detects a non-conformance\n\nEvery special characteristic (SC, CC, ★, ◆) in the PFMEA must appear in the CP.\nEvery recommended action completed in the PFMEA must be reflected in the updated CP controls.\n\n### Step 4 — Special characteristics — mandatory coverage\n\n| Classification | OEM symbol | CP requirement |\n|----------------|-----------|----------------|\n| Safety \u002F Regulatory | ★ SC \u002F ⬟ | 100% inspection OR demonstrated Cpk ≥ 1.67 + statistical monitoring |\n| Critical Characteristic | CC \u002F ◆ | Same as above — automatic stop if out of spec |\n| Significant Characteristic | SC (Ford) \u002F KPC | Process monitoring with defined sample plan and reaction |\n| Key Control Characteristic | KCC | Process parameter monitoring (not product) — SPC or other control |\n\n**OEM symbol conventions vary.** Always use the exact symbol specified in the customer's CSR:\n- Ford: CC (Critical Characteristic) and SC (Significant Characteristic) — do not use ★ or ◆\n- GM: ★ for safety-critical; Δ for significant\n- VW \u002F Audi: D (design feature, = CC), E (significant characteristic), I (functional dimension) per FORMEL Q\n- BMW: G-SC (significant characteristic), G-CC (critical characteristic) per BMW standard\n- Stellantis: CC and SC per MAQMSR — requires AIAG-VDA FMEA format alignment\n\nUsing the wrong symbol for the customer's OEM is an immediate finding at PPAP and IATF audit.\n\nFor all special characteristics: the reaction plan must specify who is notified, containment action, and when the process can restart.\n\n### Step 5 — Reaction plan requirements\n\nEvery row in the CP must have a reaction plan. Minimum requirements:\n\n- **Who** is responsible for taking action\n- **What** immediate containment is applied (tag, sort, hold, stop production)\n- **Who** is notified (supervisor, quality, engineering)\n- **When** production may restart (after what verification)\n- Reference to relevant Work Instruction or SOP for the reaction\n\nA reaction plan that says only \"notify supervisor\" or \"quarantine parts\" is insufficient — it must specify the next step after notification.\n\n### Step 6 — Audit an existing Control Plan\n\nWhen reviewing a supplier's or internal CP, check:\n\n**Structure:**\n- [ ] All process steps from the Process Flow are represented\n- [ ] Each special characteristic has its own dedicated row\n- [ ] Revision level matches the current PFMEA and drawing revision\n\n**Characteristics:**\n- [ ] All SC\u002FCC\u002FKPC\u002FKCC are listed with correct classification symbols\n- [ ] Product AND process characteristics are both covered (not just product)\n- [ ] Tolerances match the current released drawing\n\n**Controls:**\n- [ ] Measurement technique is specific (gauge type, not just \"measure\")\n- [ ] Sample size and frequency are defined (not \"as required\" or \"as needed\")\n- [ ] 100% inspection is specified where Cpk \u003C 1.33\n- [ ] SPC control charts are specified for characteristics where they are required\n\n**Reaction plan:**\n- [ ] Every row has a reaction plan\n- [ ] Reaction plans specify concrete actions (not just \"notify supervisor\")\n- [ ] Reaction plans are consistent with PFMEA failure mode severity\n\n**Alignment:**\n- [ ] CP controls match PFMEA current controls column for each failure mode\n- [ ] Completed PFMEA recommended actions are reflected in updated controls\n- [ ] CP revision date is more recent than most recent PFMEA update date\n\n## Validation criteria\n\nA complete Production Control Plan for PPAP submission must:\n- Cover every operation in the Process Flow\n- Include every special and significant characteristic with correct classification\n- Have a MSA-validated measurement system for every variable characteristic on SC\u002FCC\n- Have a reaction plan for every row\n- Be signed by the APQP team (multi-functional) and have customer approval if required\n- Match the PFMEA revision level\n\n## Common mistakes\n\n- Control Plan created without reference to PFMEA — controls are generic, not linked to actual failure modes\n- Reaction plan says \"notify supervisor\" only — not a reaction plan, just escalation\n- Missing process characteristics — CP only controls product dimensions, not process parameters like temperature or torque\n- Sample plan says \"as required\" — must specify a number and frequency\n- SC\u002FCC characteristics not identified with correct customer symbol — auditor will flag this immediately\n- CP not updated after D7 of an 8D — the most common disconnect in corrective action systems\n- Gauge type not specified — \"visual inspection\" or \"measure\" is not sufficient; must name the tool\n\n## Output Format\n\nAt the start of each use, ask the user:\n\n> \"How would you like to receive the output?\n> **A** — Structured Markdown (formatted tables and sections, ready to copy)\n> **B** — Plain tables (simplified structure for Excel or Word)\n> **C** — Narrative report (flowing text for a formal document or email)\n>\n> Default: A.\"\n\nAdapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.\n\n## Changelog\n\n| Version | Date | Author | Change |\n|---------|------|--------|--------|\n| 1.0 | 2026-06-06 | @RBraga01 | Initial release |\n| 1.1 | 2026-06-06 | @migmcc | Added OEM-specific special characteristic symbol conventions (Ford, GM, VW, BMW, Stellantis) in Step 4 |\n",{"name":5,"license":15,"metadata":48,"description":7},{"author":49,"domain":50,"status":51,"created":52,"version":53,"iso-9001":54,"subdomain":41,"iatf-16949":54,"industries":55,"updated_by":56,"reviewed_by":49,"last_updated":52,"aiag-reference":57,"standard_edition":58},"RBraga01","quality-engineering","approved","2026-06-06","1.1","8.5.1","automotive,electronics,aerospace,medical,general","migmcc","AIAG Control Plan Reference Manual","AIAG Control Plan Reference Manual (1995) \u002F IATF 16949:2016 §8.5.1","main","2b63f856ce19c2a797929cacabd9e0fc936812fa","plugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fplanning\u002Fcontrol-plan",491,"https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins","https:\u002F\u002Fhol.org\u002Fplugins\u002Fbest-codex-plugins","https:\u002F\u002Fgithub.com\u002Fhashgraph-online","https:\u002F\u002Fhol.org","Open-source standards and developer tools for interoperable AI agents: discovery, identity, communication, payments, privacy and security.","2026-11-14 14:06:13",{"source":8,"skillName":5,"commands":70,"prompt":80,"zipAvailable":81},[71,74,77],{"tool":72,"command":73},"npx","npx skills add hashgraph-online\u002Fawesome-codex-plugins --skill control-plan",{"tool":75,"command":76},"bunx","bunx skills add hashgraph-online\u002Fawesome-codex-plugins --skill control-plan",{"tool":78,"command":79},"pnpm","pnpm dlx skills add hashgraph-online\u002Fawesome-codex-plugins --skill control-plan","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fplanning\u002Fcontrol-plan\u002FSKILL.md",true,[83],{"path":84,"resourceType":85,"resourceTypeDesc":86,"sizeBytes":87,"sourceHtmlUrl":88},"references\u002Fcontrol-plan-template.md","REFERENCE","参考文档",21216,"https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fplanning\u002Fcontrol-plan\u002Freferences\u002Fcontrol-plan-template.md",[90,99,107,115,123,131],{"skillNo":91,"name":92,"nameZh":6,"description":93,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":94,"sourceHtmlUrl":95,"categories":96,"keywords":97,"publishedAt":98},"01M7DV332YQMGD8WTRJ9DZQXTB","worktable-review-with-annotations","Create, inspect, reply to, update, or resolve situated Worktable annotations. Use when feedback belongs to a Doc section, block, text range, or HTML Doc, or when the user asks to address existing review feedback and coordinate a requested artifact edit.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-review-with-annotations\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-review-with-annotations\u002FSKILL.md",[],[],"2026-11-15 14:19:17",{"skillNo":100,"name":101,"nameZh":6,"description":102,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":103,"sourceHtmlUrl":104,"categories":105,"keywords":106,"publishedAt":98},"01M7DV2YGHCZVBEB1AHYB6CGHE","worktable-find-and-synthesize-context","Find, assess, and synthesize context from Worktable Docs and Records. Use when the user asks what a workspace contains, wants workspace-backed research, needs current facts reconciled across artifacts, or requests a cited synthesis without changing workspace state.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-find-and-synthesize-context\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-find-and-synthesize-context\u002FSKILL.md",[],[],{"skillNo":108,"name":109,"nameZh":6,"description":110,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":111,"sourceHtmlUrl":112,"categories":113,"keywords":114,"publishedAt":98},"01M7DV2TQN1H11ME2SAF9MXN7V","worktable-create-or-update-docs","Create, edit, rename, or maintain narrative Worktable Docs. Use for plans, decisions, briefs, notes, research syntheses, and other durable prose when the user requests a new artifact or a safe update to an existing one.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-update-docs\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-update-docs\u002FSKILL.md",[],[],{"skillNo":116,"name":117,"nameZh":6,"description":118,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":119,"sourceHtmlUrl":120,"categories":121,"keywords":122,"publishedAt":98},"01M7DV2NE452NEA8TXATKSNAJH","worktable-create-or-manage-records","Organize repeated structured information as durable Worktable Records. Use for research datasets, inventories, directories, pipelines, trackers, and other collections whose items need identity, fields, filtering, links, validation, or individual updates.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-records\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-records\u002FSKILL.md",[],[],{"skillNo":124,"name":125,"nameZh":6,"description":126,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":127,"sourceHtmlUrl":128,"categories":129,"keywords":130,"publishedAt":98},"01M7DV2HENRBR2KSCVM064WH0Y","worktable-create-or-manage-interactive-html","Create or improve durable visual and interactive artifacts in Worktable. Use for dashboards, trackers, calculators, mini apps, slide presentations, and other requests that benefit from a polished HTML Doc.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-interactive-html\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-interactive-html\u002FSKILL.md",[],[],{"skillNo":132,"name":133,"nameZh":6,"description":134,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":135,"sourceHtmlUrl":136,"categories":137,"keywords":138,"publishedAt":98},"01M7DV2CADR5R7RQFFYPNAGR9Y","worktable-collaborate-threads","Read, answer, and hand off messages through durable Worktable threads with users or other authenticated participants. Use when the user asks to check addressed messages, reply to a participant, continue a thread, request another agent's help, wait briefly for a response, or watch for comments and messages sent to the agent.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-collaborate-threads\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-collaborate-threads\u002FSKILL.md",[],[]]