[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M6MD7JMGYBVANXP41P9S5Y5M":3,"skill-same:01M6MD7JMGYBVANXP41P9S5Y5M":100},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":28,"publishedAt":53,"linkOnly":54,"markdownContent":55,"markdownBody":56,"frontMatter":57,"refName":70,"commitSha":71,"skillDirectory":72,"forksCount":73,"repositoryHtmlUrl":74,"repositoryHomepageUrl":75,"ownerHtmlUrl":76,"ownerBlogUrl":77,"ownerDescription":78,"updatedAt":79,"install":80,"resources":93},"01M6MD7JMGYBVANXP41P9S5Y5M","spc-control-charts",null,"Statistical Process Control (SPC) — select the correct control chart, interpret out-of-control signals using Western Electric rules, calculate and interpret Cp, Cpk, Pp, Ppk. Use when setting up SPC for a new characteristic, interpreting control chart signals, responding to special cause variation, or auditing SPC implementation. Covers AIAG SPC 2nd edition and IATF 16949 §8.3.3.","hashgraph-online\u002Fawesome-codex-plugins","hashgraph-online","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F160371962?v=4","01M6CNB6NRJVNNGN14TR01Q6D3","HOL (Hashgraph Online)","01M6JT1HSKKG9V68KQAQGBA7XP",1575,"MIT","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fmeasurement\u002Fspc-control-charts\u002FSKILL.md",[18,23],{"categoryNo":19,"categoryName":20,"taxonomyType":21,"taxonomyTypeDesc":22},"01JBSEEDCAT000000000000013","分析与可视化","SCENARIO","使用场景",{"categoryNo":24,"categoryName":25,"taxonomyType":26,"taxonomyTypeDesc":27},"01JBSEEDCAT000000000000033","数据分析师","PROFESSION","适用职业",[29,30,31,32,33,34,35,36,37,38,39,40,41,42,43,44,45,46,47,48,49,50,51,52],"spc control charts","control","Charts","chart","new","2026","automotive","when","for","spc implementation","measurement","pp","electronics","cp","medical","signals","general","up","use","process","Rules","calculate","select","correct","2026-11-10 10:12:30",false,"---\nname: spc-control-charts\ndescription: >-\n  Statistical Process Control (SPC) — select the correct control chart, interpret out-of-control\n  signals using Western Electric rules, calculate and interpret Cp, Cpk, Pp, Ppk. Use when setting\n  up SPC for a new characteristic, interpreting control chart signals, responding to special cause\n  variation, or auditing SPC implementation. Covers AIAG SPC 2nd edition and IATF 16949 §8.3.3.\nlicense: MIT\nmetadata:\n  author: RBraga01\n  version: \"1.1\"\n  iso-9001: \"9.1\"\n  iatf-16949: \"8.3.3, 9.1.1\"\n  aiag-reference: \"AIAG SPC 2nd Edition\"\n  domain: quality-engineering\n  subdomain: measurement\n  industries: automotive,electronics,aerospace,medical,general\n  status: approved\n  created: \"2026-06-06\"\n  last_updated: \"2026-06-06\"\n  updated_by: migmcc\n  reviewed_by: RBraga01\n  standard_edition: \"AIAG SPC 2nd Edition (2005)\"\n---\n\n# Statistical Process Control (SPC)\n\n## When to use\n\nUse this skill when:\n- Selecting the correct control chart type for a process characteristic\n- Interpreting control chart signals — is this special cause or common cause?\n- Calculating Cp, Cpk, Pp, Ppk and determining if the process is capable\n- Responding to an out-of-control signal on a production line\n- Setting up SPC for a new special characteristic (PPAP\u002FAPQP requirement)\n- Auditing an SPC system for correctness and adequacy\n- Explaining SPC results to a customer or during an audit\n\n## Prerequisites\n\n- The characteristic to monitor (variable or attribute data)\n- Production data (minimum 25 subgroups for control limits, 100+ pieces for capability)\n- MSA study completed and %GRR \u003C 30% for variable charts\n- Process specification (nominal + tolerance) for capability calculations\n- Subgroup size decided based on rational subgrouping principle\n\n## Workflow\n\n### Step 1 — Select the correct control chart\n\n#### Variable data (measured values — length, weight, pressure, temperature)\n\n| Chart | When to use |\n|-------|------------|\n| **X̄-R (X-bar\u002FRange)** | Subgroup size 2–9; most common in manufacturing |\n| **X̄-S (X-bar\u002FSigma)** | Subgroup size ≥ 10; better sensitivity to spread |\n| **I-MR (Individuals\u002FMoving Range)** | Subgroup size = 1; one measurement per inspection (slow processes, destructive tests) |\n\n#### Attribute data (counts, pass\u002Ffail, defect rates)\n\n| Chart | When to use |\n|-------|------------|\n| **p-chart** | Proportion defective; variable subgroup size |\n| **np-chart** | Number defective; constant subgroup size |\n| **c-chart** | Count of defects per unit; constant inspection area |\n| **u-chart** | Defects per unit; variable inspection area |\n\n**Decision rule:** If you can measure it with a number, use a variable chart. Variable charts are more sensitive and require smaller samples to detect process shifts.\n\n---\n\n### Step 2 — Calculate control limits\n\n#### X̄-R chart\n\nFrom at least 25 subgroups of size n:\n\n- **Centre line (X̄̄):** Grand average of all subgroup means\n- **UCL_X̄ = X̄̄ + A₂ × R̄**\n- **LCL_X̄ = X̄̄ − A₂ × R̄**\n- **Centre line (R̄):** Average of all subgroup ranges\n- **UCL_R = D₄ × R̄**\n- **LCL_R = D₃ × R̄** (= 0 for n ≤ 6)\n\nConstants for common subgroup sizes:\n\n| n | A₂ | D₃ | D₄ |\n|---|----|----|-----|\n| 2 | 1.880 | 0 | 3.267 |\n| 3 | 1.023 | 0 | 2.574 |\n| 4 | 0.729 | 0 | 2.282 |\n| 5 | 0.577 | 0 | 2.114 |\n\n**Important:** Control limits are calculated FROM THE DATA — never set them to match the specification limits. Specification limits and control limits are completely separate concepts.\n\n---\n\n### Step 3 — Apply Western Electric Rules (out-of-control signals)\n\nDivide the control chart into zones: Zone A (2–3σ from centre), Zone B (1–2σ), Zone C (0–1σ).\n\n| Rule | Signal | Interpretation |\n|------|--------|----------------|\n| **Rule 1** | 1 point beyond 3σ (outside control limits) | Large, immediate shift |\n| **Rule 2** | 9 consecutive points on same side of centre line | Process mean has shifted |\n| **Rule 3** | 6 consecutive points steadily increasing or decreasing | Trend — tool wear, drift |\n| **Rule 4** | 14 consecutive points alternating up and down | Systematic variation — two alternating distributions |\n| **Rule 5** | 2 of 3 consecutive points in Zone A or beyond (same side) | Large shift signal |\n| **Rule 6** | 4 of 5 consecutive points in Zone B or beyond (same side) | Moderate shift |\n| **Rule 7** | 15 consecutive points in Zone C (either side of centre line) | Stratification — data from two separate distributions |\n| **Rule 8** | 8 consecutive points beyond Zone C (either side) | Mixture — sampling from two processes |\n\n**Action required for ANY rule violation:** Stop and investigate immediately. Do not reset control limits. Do not restart until root cause is identified.\n\nMost commonly applied in automotive: Rules 1, 2, 3 minimum. Rules 1–8 for safety-critical characteristics.\n\n---\n\n### Step 4 — Calculate and interpret process capability\n\n**Capability data requirements:** Process capability is only valid when calculated on a process that is in statistical control (no out-of-control signals) and with a minimum of **100 consecutive parts** from that stable process. Fewer parts produce unreliable Cpk estimates — a Cpk calculated on 30 parts can vary by ±0.3 from the true value. Do not report Cpk based on fewer than 100 parts as a production capability figure; label it \"preliminary\" and state the sample size.\n\n**Short-term capability (within-subgroup variation):**\n\n- **Cp = (USL − LSL) \u002F (6σ̂)**  — capability — process spread vs. tolerance\n- **Cpk = min[(USL − X̄̄) \u002F (3σ̂), (X̄̄ − LSL) \u002F (3σ̂)]** — centred capability — accounts for process mean location\n\nσ̂ = R̄ \u002F d₂ (for X̄-R chart)\n\n**Long-term performance (total variation including between-subgroup):**\n\n- **Pp = (USL − LSL) \u002F (6s)**  — same formula but uses overall standard deviation s\n- **Ppk = min[(USL − X̄̄) \u002F (3s), (X̄̄ − LSL) \u002F (3s)]**\n\n#### Acceptance criteria\n\n| Index | Minimum | Target |\n|-------|---------|--------|\n| Cpk | 1.33 | 1.67 |\n| Ppk | 1.33 | 1.67 |\n\n| Cpk | Interpretation | PPAP action |\n|-----|---------------|-------------|\n| ≥ 1.67 | Excellent | ✅ Accepted |\n| 1.33 – 1.67 | Acceptable | ✅ Accepted — monitor |\n| 1.00 – 1.33 | Marginal | ⚠️ Customer approval required; add control measures |\n| \u003C 1.00 | Not capable | ❌ 100% inspection required; corrective action mandatory |\n\n#### Cp vs. Cpk relationship\n\n- Cp = Cpk: process is perfectly centred\n- Cp > Cpk: process is off-centre — improve centering before widening control limits\n- Never report only Cp without Cpk — a process can be off-centre and still show a good Cp\n\n---\n\n### Step 5 — Respond to an out-of-control condition\n\n1. **Stop the process** (or place affected output on hold) — do not continue producing to an out-of-control process\n2. **Contain** — identify affected output since last in-control point\n3. **Investigate** — ask: what changed? (material lot, operator, shift, tooling, environment)\n4. **Identify root cause** — use 5-Why or Fishbone (is-is-not to scope the problem first)\n5. **Correct** — implement correction and verify the process returns to control\n6. **Document** — note the signal, investigation, and action taken on the chart (or in the log)\n7. **Update PFMEA and Control Plan** if the root cause reveals a new failure mode\n\nDo NOT simply recalculate control limits after a shift to make the chart \"look in control.\"\n\n---\n\n### Step 6 — Audit an SPC implementation\n\nWhen reviewing SPC in production or at a supplier:\n\n- [ ] Correct chart type selected for data type (variable vs. attribute)\n- [ ] Minimum 25 subgroups used to calculate initial control limits\n- [ ] Control limits calculated from process data — NOT set to specification limits\n- [ ] Western Electric rules applied (minimum Rule 1, 2, 3)\n- [ ] Out-of-control signals are annotated on the chart with the action taken\n- [ ] Process capability calculated on stable (in-control) process only\n- [ ] Cpk ≥ 1.33 minimum; 1.67 for special characteristics\n- [ ] MSA study complete and %GRR \u003C 30% for the gauge being used\n- [ ] Control chart is used for decision-making — not filled in retroactively\n\n---\n\n## Validation criteria\n\nAn SPC implementation is adequate when:\n- Chart type matches data type and subgroup size\n- Control limits calculated from minimum 25 subgroups of production data\n- Process in statistical control before capability is calculated\n- Cpk ≥ 1.33 (minimum) for all monitored characteristics\n- Out-of-control signals trigger documented investigation and corrective action\n\n## Common mistakes\n\n- Setting control limits equal to specification limits (a fundamental SPC error — these are different concepts)\n- Calculating capability on an out-of-control process (meaningless — must be stable first)\n- Reporting Cp but not Cpk — hides off-centre processes\n- Using only n=1 individual charts when subgrouping would reveal more\n- Filling in control charts retroactively at end of shift — defeats the purpose of real-time monitoring\n- Recalculating control limits to eliminate out-of-control points without identifying root cause\n- Reporting Cpk = 1.45 based on 30 parts — too few; minimum 100 pieces for reliable capability\n\n## Output Format\n\nAt the start of each use, ask the user:\n\n> \"How would you like to receive the output?\n> **A** — Structured Markdown (formatted tables and sections, ready to copy)\n> **B** — Plain tables (simplified structure for Excel or Word)\n> **C** — Narrative report (flowing text for a formal document or email)\n>\n> Default: A.\"\n\nAdapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.\n\n## Changelog\n\n| Version | Date | Author | Change |\n|---------|------|--------|--------|\n| 1.0 | 2026-06-06 | @RBraga01 | Initial release |\n| 1.1 | 2026-06-06 | @migmcc | Added 100-part minimum requirement for valid capability study in Step 4; clarified in-control prerequisite before capability calculation |\n","# Statistical Process Control (SPC)\n\n## When to use\n\nUse this skill when:\n- Selecting the correct control chart type for a process characteristic\n- Interpreting control chart signals — is this special cause or common cause?\n- Calculating Cp, Cpk, Pp, Ppk and determining if the process is capable\n- Responding to an out-of-control signal on a production line\n- Setting up SPC for a new special characteristic (PPAP\u002FAPQP requirement)\n- Auditing an SPC system for correctness and adequacy\n- Explaining SPC results to a customer or during an audit\n\n## Prerequisites\n\n- The characteristic to monitor (variable or attribute data)\n- Production data (minimum 25 subgroups for control limits, 100+ pieces for capability)\n- MSA study completed and %GRR \u003C 30% for variable charts\n- Process specification (nominal + tolerance) for capability calculations\n- Subgroup size decided based on rational subgrouping principle\n\n## Workflow\n\n### Step 1 — Select the correct control chart\n\n#### Variable data (measured values — length, weight, pressure, temperature)\n\n| Chart | When to use |\n|-------|------------|\n| **X̄-R (X-bar\u002FRange)** | Subgroup size 2–9; most common in manufacturing |\n| **X̄-S (X-bar\u002FSigma)** | Subgroup size ≥ 10; better sensitivity to spread |\n| **I-MR (Individuals\u002FMoving Range)** | Subgroup size = 1; one measurement per inspection (slow processes, destructive tests) |\n\n#### Attribute data (counts, pass\u002Ffail, defect rates)\n\n| Chart | When to use |\n|-------|------------|\n| **p-chart** | Proportion defective; variable subgroup size |\n| **np-chart** | Number defective; constant subgroup size |\n| **c-chart** | Count of defects per unit; constant inspection area |\n| **u-chart** | Defects per unit; variable inspection area |\n\n**Decision rule:** If you can measure it with a number, use a variable chart. Variable charts are more sensitive and require smaller samples to detect process shifts.\n\n---\n\n### Step 2 — Calculate control limits\n\n#### X̄-R chart\n\nFrom at least 25 subgroups of size n:\n\n- **Centre line (X̄̄):** Grand average of all subgroup means\n- **UCL_X̄ = X̄̄ + A₂ × R̄**\n- **LCL_X̄ = X̄̄ − A₂ × R̄**\n- **Centre line (R̄):** Average of all subgroup ranges\n- **UCL_R = D₄ × R̄**\n- **LCL_R = D₃ × R̄** (= 0 for n ≤ 6)\n\nConstants for common subgroup sizes:\n\n| n | A₂ | D₃ | D₄ |\n|---|----|----|-----|\n| 2 | 1.880 | 0 | 3.267 |\n| 3 | 1.023 | 0 | 2.574 |\n| 4 | 0.729 | 0 | 2.282 |\n| 5 | 0.577 | 0 | 2.114 |\n\n**Important:** Control limits are calculated FROM THE DATA — never set them to match the specification limits. Specification limits and control limits are completely separate concepts.\n\n---\n\n### Step 3 — Apply Western Electric Rules (out-of-control signals)\n\nDivide the control chart into zones: Zone A (2–3σ from centre), Zone B (1–2σ), Zone C (0–1σ).\n\n| Rule | Signal | Interpretation |\n|------|--------|----------------|\n| **Rule 1** | 1 point beyond 3σ (outside control limits) | Large, immediate shift |\n| **Rule 2** | 9 consecutive points on same side of centre line | Process mean has shifted |\n| **Rule 3** | 6 consecutive points steadily increasing or decreasing | Trend — tool wear, drift |\n| **Rule 4** | 14 consecutive points alternating up and down | Systematic variation — two alternating distributions |\n| **Rule 5** | 2 of 3 consecutive points in Zone A or beyond (same side) | Large shift signal |\n| **Rule 6** | 4 of 5 consecutive points in Zone B or beyond (same side) | Moderate shift |\n| **Rule 7** | 15 consecutive points in Zone C (either side of centre line) | Stratification — data from two separate distributions |\n| **Rule 8** | 8 consecutive points beyond Zone C (either side) | Mixture — sampling from two processes |\n\n**Action required for ANY rule violation:** Stop and investigate immediately. Do not reset control limits. Do not restart until root cause is identified.\n\nMost commonly applied in automotive: Rules 1, 2, 3 minimum. Rules 1–8 for safety-critical characteristics.\n\n---\n\n### Step 4 — Calculate and interpret process capability\n\n**Capability data requirements:** Process capability is only valid when calculated on a process that is in statistical control (no out-of-control signals) and with a minimum of **100 consecutive parts** from that stable process. Fewer parts produce unreliable Cpk estimates — a Cpk calculated on 30 parts can vary by ±0.3 from the true value. Do not report Cpk based on fewer than 100 parts as a production capability figure; label it \"preliminary\" and state the sample size.\n\n**Short-term capability (within-subgroup variation):**\n\n- **Cp = (USL − LSL) \u002F (6σ̂)**  — capability — process spread vs. tolerance\n- **Cpk = min[(USL − X̄̄) \u002F (3σ̂), (X̄̄ − LSL) \u002F (3σ̂)]** — centred capability — accounts for process mean location\n\nσ̂ = R̄ \u002F d₂ (for X̄-R chart)\n\n**Long-term performance (total variation including between-subgroup):**\n\n- **Pp = (USL − LSL) \u002F (6s)**  — same formula but uses overall standard deviation s\n- **Ppk = min[(USL − X̄̄) \u002F (3s), (X̄̄ − LSL) \u002F (3s)]**\n\n#### Acceptance criteria\n\n| Index | Minimum | Target |\n|-------|---------|--------|\n| Cpk | 1.33 | 1.67 |\n| Ppk | 1.33 | 1.67 |\n\n| Cpk | Interpretation | PPAP action |\n|-----|---------------|-------------|\n| ≥ 1.67 | Excellent | ✅ Accepted |\n| 1.33 – 1.67 | Acceptable | ✅ Accepted — monitor |\n| 1.00 – 1.33 | Marginal | ⚠️ Customer approval required; add control measures |\n| \u003C 1.00 | Not capable | ❌ 100% inspection required; corrective action mandatory |\n\n#### Cp vs. Cpk relationship\n\n- Cp = Cpk: process is perfectly centred\n- Cp > Cpk: process is off-centre — improve centering before widening control limits\n- Never report only Cp without Cpk — a process can be off-centre and still show a good Cp\n\n---\n\n### Step 5 — Respond to an out-of-control condition\n\n1. **Stop the process** (or place affected output on hold) — do not continue producing to an out-of-control process\n2. **Contain** — identify affected output since last in-control point\n3. **Investigate** — ask: what changed? (material lot, operator, shift, tooling, environment)\n4. **Identify root cause** — use 5-Why or Fishbone (is-is-not to scope the problem first)\n5. **Correct** — implement correction and verify the process returns to control\n6. **Document** — note the signal, investigation, and action taken on the chart (or in the log)\n7. **Update PFMEA and Control Plan** if the root cause reveals a new failure mode\n\nDo NOT simply recalculate control limits after a shift to make the chart \"look in control.\"\n\n---\n\n### Step 6 — Audit an SPC implementation\n\nWhen reviewing SPC in production or at a supplier:\n\n- [ ] Correct chart type selected for data type (variable vs. attribute)\n- [ ] Minimum 25 subgroups used to calculate initial control limits\n- [ ] Control limits calculated from process data — NOT set to specification limits\n- [ ] Western Electric rules applied (minimum Rule 1, 2, 3)\n- [ ] Out-of-control signals are annotated on the chart with the action taken\n- [ ] Process capability calculated on stable (in-control) process only\n- [ ] Cpk ≥ 1.33 minimum; 1.67 for special characteristics\n- [ ] MSA study complete and %GRR \u003C 30% for the gauge being used\n- [ ] Control chart is used for decision-making — not filled in retroactively\n\n---\n\n## Validation criteria\n\nAn SPC implementation is adequate when:\n- Chart type matches data type and subgroup size\n- Control limits calculated from minimum 25 subgroups of production data\n- Process in statistical control before capability is calculated\n- Cpk ≥ 1.33 (minimum) for all monitored characteristics\n- Out-of-control signals trigger documented investigation and corrective action\n\n## Common mistakes\n\n- Setting control limits equal to specification limits (a fundamental SPC error — these are different concepts)\n- Calculating capability on an out-of-control process (meaningless — must be stable first)\n- Reporting Cp but not Cpk — hides off-centre processes\n- Using only n=1 individual charts when subgrouping would reveal more\n- Filling in control charts retroactively at end of shift — defeats the purpose of real-time monitoring\n- Recalculating control limits to eliminate out-of-control points without identifying root cause\n- Reporting Cpk = 1.45 based on 30 parts — too few; minimum 100 pieces for reliable capability\n\n## Output Format\n\nAt the start of each use, ask the user:\n\n> \"How would you like to receive the output?\n> **A** — Structured Markdown (formatted tables and sections, ready to copy)\n> **B** — Plain tables (simplified structure for Excel or Word)\n> **C** — Narrative report (flowing text for a formal document or email)\n>\n> Default: A.\"\n\nAdapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.\n\n## Changelog\n\n| Version | Date | Author | Change |\n|---------|------|--------|--------|\n| 1.0 | 2026-06-06 | @RBraga01 | Initial release |\n| 1.1 | 2026-06-06 | @migmcc | Added 100-part minimum requirement for valid capability study in Step 4; clarified in-control prerequisite before capability calculation |\n",{"name":5,"license":15,"metadata":58,"description":7},{"author":59,"domain":60,"status":61,"created":62,"version":63,"iso-9001":64,"subdomain":39,"iatf-16949":65,"industries":66,"updated_by":67,"reviewed_by":59,"last_updated":62,"aiag-reference":68,"standard_edition":69},"RBraga01","quality-engineering","approved","2026-06-06","1.1","9.1","8.3.3, 9.1.1","automotive,electronics,aerospace,medical,general","migmcc","AIAG SPC 2nd Edition","AIAG SPC 2nd Edition (2005)","main","2b63f856ce19c2a797929cacabd9e0fc936812fa","plugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fmeasurement\u002Fspc-control-charts",491,"https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins","https:\u002F\u002Fhol.org\u002Fplugins\u002Fbest-codex-plugins","https:\u002F\u002Fgithub.com\u002Fhashgraph-online","https:\u002F\u002Fhol.org","Open-source standards and developer tools for interoperable AI agents: discovery, identity, communication, payments, privacy and security.","2026-11-14 14:06:13",{"source":8,"skillName":5,"commands":81,"prompt":91,"zipAvailable":92},[82,85,88],{"tool":83,"command":84},"npx","npx skills add hashgraph-online\u002Fawesome-codex-plugins --skill spc-control-charts",{"tool":86,"command":87},"bunx","bunx skills add hashgraph-online\u002Fawesome-codex-plugins --skill spc-control-charts",{"tool":89,"command":90},"pnpm","pnpm dlx skills add hashgraph-online\u002Fawesome-codex-plugins --skill spc-control-charts","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fmeasurement\u002Fspc-control-charts\u002FSKILL.md",true,[94],{"path":95,"resourceType":96,"resourceTypeDesc":97,"sizeBytes":98,"sourceHtmlUrl":99},"references\u002Fchart-selection-guide.md","REFERENCE","参考文档",17014,"https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002FRBraga01\u002FQuality-Engineering-Skills\u002Fskills\u002Fmeasurement\u002Fspc-control-charts\u002Freferences\u002Fchart-selection-guide.md",[101,110,118,126,134,142],{"skillNo":102,"name":103,"nameZh":6,"description":104,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":105,"sourceHtmlUrl":106,"categories":107,"keywords":108,"publishedAt":109},"01M7DV332YQMGD8WTRJ9DZQXTB","worktable-review-with-annotations","Create, inspect, reply to, update, or resolve situated Worktable annotations. Use when feedback belongs to a Doc section, block, text range, or HTML Doc, or when the user asks to address existing review feedback and coordinate a requested artifact edit.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-review-with-annotations\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-review-with-annotations\u002FSKILL.md",[],[],"2026-11-15 14:19:17",{"skillNo":111,"name":112,"nameZh":6,"description":113,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":114,"sourceHtmlUrl":115,"categories":116,"keywords":117,"publishedAt":109},"01M7DV2YGHCZVBEB1AHYB6CGHE","worktable-find-and-synthesize-context","Find, assess, and synthesize context from Worktable Docs and Records. Use when the user asks what a workspace contains, wants workspace-backed research, needs current facts reconciled across artifacts, or requests a cited synthesis without changing workspace state.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-find-and-synthesize-context\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-find-and-synthesize-context\u002FSKILL.md",[],[],{"skillNo":119,"name":120,"nameZh":6,"description":121,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":122,"sourceHtmlUrl":123,"categories":124,"keywords":125,"publishedAt":109},"01M7DV2TQN1H11ME2SAF9MXN7V","worktable-create-or-update-docs","Create, edit, rename, or maintain narrative Worktable Docs. Use for plans, decisions, briefs, notes, research syntheses, and other durable prose when the user requests a new artifact or a safe update to an existing one.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-update-docs\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-update-docs\u002FSKILL.md",[],[],{"skillNo":127,"name":128,"nameZh":6,"description":129,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":130,"sourceHtmlUrl":131,"categories":132,"keywords":133,"publishedAt":109},"01M7DV2NE452NEA8TXATKSNAJH","worktable-create-or-manage-records","Organize repeated structured information as durable Worktable Records. Use for research datasets, inventories, directories, pipelines, trackers, and other collections whose items need identity, fields, filtering, links, validation, or individual updates.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-records\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-records\u002FSKILL.md",[],[],{"skillNo":135,"name":136,"nameZh":6,"description":137,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":138,"sourceHtmlUrl":139,"categories":140,"keywords":141,"publishedAt":109},"01M7DV2HENRBR2KSCVM064WH0Y","worktable-create-or-manage-interactive-html","Create or improve durable visual and interactive artifacts in Worktable. Use for dashboards, trackers, calculators, mini apps, slide presentations, and other requests that benefit from a polished HTML Doc.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-interactive-html\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-create-or-manage-interactive-html\u002FSKILL.md",[],[],{"skillNo":143,"name":144,"nameZh":6,"description":145,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":146,"sourceHtmlUrl":147,"categories":148,"keywords":149,"publishedAt":109},"01M7DV2CADR5R7RQFFYPNAGR9Y","worktable-collaborate-threads","Read, answer, and hand off messages through durable Worktable threads with users or other authenticated participants. Use when the user asks to check addressed messages, reply to a participant, continue a thread, request another agent's help, wait briefly for a response, or watch for comments and messages sent to the agent.","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-collaborate-threads\u002FLICENSE","https:\u002F\u002Fgithub.com\u002Fhashgraph-online\u002Fawesome-codex-plugins\u002Fblob\u002Fmain\u002Fplugins\u002Fworktable\u002Fworktable-plugin\u002Fskills\u002Fworktable-collaborate-threads\u002FSKILL.md",[],[]]