edificios-esenciales
Screen whether a use may qualify as an essential building (importance category IV, NCh433:2026) and list review implications under DS 61.
- License 许可
- MIT
- 最近更新
- 2026-08-31
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- name
- edificios-esenciales
- description
- Screen whether a use may qualify as an essential building (importance category IV, NCh433:2026) and list review implications under DS 61.
03 SKILL.md 正文
Edificios Esenciales
Use this skill when the user needs a first-pass classification screening for essential buildings or seismically important uses.
Normative framing
- "Edificios esenciales" is not an autonomous figure of D.S. N° 61/2011; it corresponds to the importance categories of NCh433:2026 (typically category IV: uses whose failure can cause major disaster, e.g. hospitals, emergency facilities).
- D.S. N° 61 (V. y U.), 2011, is the regulatory frame for seismic design of buildings and was refunded into NCh433:2026.
Operative steps
- Check
references/normative-registry.ymlandreferences/source-lookup-protocol.mdbefore classifying. - Identify the proposed use and any occupancy-critical context.
- Screen whether the use may fall under an essential/importance category IV treatment.
- Summarize the likely consequences for review and further technical verification.
Output shape
- Executive summary
- Use screening
- Possible classification path
- Consequences for review
- Missing inputs
Guardrails
- Do not claim a final classification without source verification.
- Use cautious language: "may qualify", "requires confirmation", "needs review".
- Do not treat this as a structural design skill; it is a screening and classification aid only.
- If the applicable category is not verified, recover the relevant source from
references/source-of-truth/and keep the result provisional.
04 同仓库更多 Skills
workplace-strategist
Traduce headcount y cultura organizacional en programa de espacios con norma chilena de accesibilidad y evacuación.
units-and-measurements
Unidades oficiales chilenas: m2, m3, cm, kg/m2; distinguir superficie terreno/ocupada/construida/útil.
transparency
Mostrar fuentes de datos, inputs del usuario y limitaciones conocidas en todo análisis.
terminology
Usar términos oficiales chilenos: DOM, PRC, CO/CC, rasante, retiro, NCh433, DS 50/61, CES.
sustainability-specialist
Evaluación de impacto ambiental chileno: EPD, DS 50, calificación energética, huella de carbono, CES/EDGE/LEED.
site-planner
Análisis integral de sitio chileno: Google Earth, IDE Chile, SII, SEREMI, humedales, vialidad, contexto urbano.