[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M6EQSDN41MWQH52QA40WRQT4":3,"skill-same:01M6EQSDN41MWQH52QA40WRQT4":62},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":35,"linkOnly":36,"markdownContent":37,"markdownBody":38,"frontMatter":39,"refName":40,"commitSha":41,"skillDirectory":42,"forksCount":43,"repositoryHtmlUrl":44,"repositoryHomepageUrl":45,"ownerHtmlUrl":46,"ownerBlogUrl":6,"ownerDescription":6,"updatedAt":47,"install":48,"resources":61},"01M6EQSDN41MWQH52QA40WRQT4","qm",null,"Use when working with SAP Quality Management — quality planning (inspection plans, material specs), quality inspection (inspection lots, results recording, usage decisions), quality control (SPC, control charts), quality certificates, quality notifications, or QM integration with MM\u002FPP\u002FSD.","vigneshbarani24\u002Fsap-superpowers","vigneshbarani24","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F20842962?v=4","01M6EQKRW2KZ2M0H75J985XGDX","Vignesh Barani Sivakumar","01M6EQKS0E6EWFSXP4XWK6Y760",11,"MIT","https:\u002F\u002Fgithub.com\u002Fvigneshbarani24\u002Fsap-superpowers\u002Fblob\u002Fmain\u002Fskills\u002Fmodules\u002Fqm\u002FSKILL.md",[],[5,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34],"management","pp","mm","material","plans","control","sap","use","planning","results","decisions","quality","certificates","Charts","notifications","integration","2026-11-10 10:12:30",false,"---\nname: qm\ndescription: Use when working with SAP Quality Management — quality planning (inspection plans, material specs), quality inspection (inspection lots, results recording, usage decisions), quality control (SPC, control charts), quality certificates, quality notifications, or QM integration with MM\u002FPP\u002FSD.\n---\n\n# SAP Quality Management (QM)\n\nThis skill enforces correct QM implementation practices, ensuring that inspection plans are maintained before procurement and production go-live, usage decisions are never skipped for inspection lots, and quality notifications are always linked to root cause analysis — because a quality notification without a root cause is a complaint, not a corrective action.\n\n## Content Routing\n\n| Topic | Section |\n|-------|---------|\n| Quality planning | Quality Planning |\n| Inspection plans and characteristics | Inspection Plans |\n| Quality inspection process | Quality Inspection |\n| Usage decisions | Usage Decisions |\n| Quality notifications | Quality Notifications |\n| Quality certificates | Quality Certificates |\n| SPC and control charts | Statistical Process Control |\n| Key tables and transactions | Key Tables \u002F Key Transactions |\n| Integration with MM, PP, SD | Integration Points |\n| S\u002F4HANA quality management | S\u002F4HANA Quality Management |\n\n## Iron Laws\n\n1. **ALWAYS MAINTAIN INSPECTION PLANS BEFORE PROCUREMENT\u002FPRODUCTION GO-LIVE.** Inspection lots are created automatically during goods receipt (MM) and production completion (PP). Without active inspection plans assigned to materials, these inspection lots have no inspection characteristics — making them meaningless checkboxes. Plans first, transactions second.\n2. **NEVER SKIP USAGE DECISION FOR INSPECTION LOTS.** The usage decision (QA11) is the formal quality verdict — accept, reject, or conditionally accept. An inspection lot without a usage decision is an open quality item. Open lots block stock (if configured for quality stock), distort inventory figures, and create audit findings.\n3. **ALWAYS LINK QUALITY NOTIFICATIONS TO ROOT CAUSE ANALYSIS.** A quality notification (QM01) that records a defect without analyzing its cause (using catalog codes for defect type, cause, and corrective action) is incident logging, not quality management. Every notification must have: defect description, cause code, corrective action, and responsible person.\n4. **NEVER CONFIGURE SAMPLING WITHOUT STATISTICAL BASIS.** Sampling procedures define how many units to inspect from a lot. Random sampling without statistical basis (AQL — Acceptable Quality Level, sampling scheme per ISO 2859) produces inspection results that cannot be defended in an audit.\n5. **ALWAYS ACTIVATE QM IN MATERIAL MASTER BEFORE EXPECTING INSPECTION LOT CREATION.** Inspection lot creation is triggered by the QM procurement\u002Fproduction view in the material master (inspection type activation). If the QM view is not maintained, no inspection lots are created — regardless of how many inspection plans exist.\n\n## Quality Planning\n\n### Material Specification\nDefine quality requirements at the material level:\n- **Material master QM view:** Activate inspection types (01-goods receipt, 03-in-process, 04-delivery, 08-stock transfer)\n- **Material specification (QS21):** Define required characteristic values for a material\n- **Inspection setup (QDV1):** Link inspection type to plant\u002Fmaterial with detailed control parameters\n\n### Catalog Management\nQuality catalogs define standardized code groups for:\n| Catalog Type | Purpose | Transaction |\n|-------------|---------|-------------|\n| 1 — Defect types | What is wrong (scratch, crack, dimension deviation) | QS41 |\n| 3 — Defect locations | Where on the item (surface, edge, interior) | QS41 |\n| 5 — Causes | Why it happened (tool wear, operator error, material defect) | QS41 |\n| 9 — Activities | What corrective action was taken (rework, scrap, sort) | QS41 |\n| E — Usage decisions | Possible quality verdicts (accept, reject, conditional) | QS51 |\n\n### Catalog Profiles\nGroup catalogs into profiles (QS41) and assign to notification types. Ensures consistent coding across plants and quality teams.\n\n## Inspection Plans\n\n### Plan Structure (QP01\u002FQP02\u002FQP03)\n```\nInspection Plan Header (material, plant, plan group\u002Fcounter)\n  └── Operation (sequence step — e.g., visual inspection, dimensional check)\n      └── Inspection Characteristic (specific measurement — e.g., length, weight, color)\n          └── Specification (target value, tolerances, sampling)\n```\n\n### Characteristic Types\n| Type | Description | Example |\n|------|-------------|---------|\n| Quantitative | Measured value with tolerances | Length: 100mm +\u002F- 0.5mm |\n| Qualitative | Attribute check (pass\u002Ffail, code) | Surface: OK \u002F Defective |\n| Formula-based | Calculated from other characteristics | Ratio = Length \u002F Width |\n\n### Master Inspection Characteristics (QS21)\nReusable characteristic definitions maintained centrally. Referenced in inspection plans. Changes to master characteristic propagate to all referencing plans.\n\n### Sampling Procedures (QDV2)\n| Sampling Type | Description |\n|---------------|-------------|\n| Fixed sample | Always inspect N units |\n| Percentage-based | Inspect X% of lot quantity |\n| Sampling scheme | AQL-based per ISO 2859 (single, double, sequential) |\n| 100% inspection | Inspect every unit (for critical characteristics) |\n| Skip lot | Skip inspection for qualified suppliers (dynamic modification) |\n\n### Dynamic Modification (QDP1\u002FQDP2)\nAutomatically adjust inspection scope based on quality history:\n- Good results -> reduce inspection (tighten skip lot)\n- Bad results -> increase inspection (from sampling to 100%)\n- Supplier quality score drives inspection level\n\n## Quality Inspection\n\n### Inspection Lot Creation\nInspection lots are created automatically based on triggers:\n\n| Inspection Type | Trigger | Source |\n|-----------------|---------|--------|\n| 01 — Goods receipt | MIGO goods receipt for purchase order | MM |\n| 03 — In-process | Production order confirmation at operation | PP |\n| 04 — Goods issue for delivery | Delivery creation for customer | SD |\n| 05 — Goods receipt from production | Production order goods receipt | PP |\n| 08 — Stock transfer | Stock transfer posting | MM |\n| 09 — Recurring inspection | Time-based for stored materials | QM |\n| 89 — Physical sample | Laboratory sample inspection | QM |\n\n### Results Recording (QA32\u002FQE01)\n| Transaction | Purpose |\n|-------------|---------|\n| QA32 | Change inspection lot — results recording |\n| QE01 | Results recording for inspection point |\n| QE51N | Results recording worklist |\n| QA33 | Display inspection lot |\n\nRecord measured values for each characteristic. System evaluates against specification (target, upper\u002Flower limits). Automatic valuation: characteristic accepted or rejected based on results.\n\n### Defect Recording (QA32\u002FQF01)\nRecord defects found during inspection with catalog codes:\n- Defect type (from catalog 1)\n- Defect location (from catalog 3)\n- Defect severity (critical, major, minor)\n- Quantity defective\n\n## Usage Decisions\n\n### Usage Decision Process (QA11\u002FQA12)\nThe formal quality verdict for an inspection lot:\n\n| Decision Code | Action | Stock Posting |\n|---------------|--------|---------------|\n| Accept (A) | Release to unrestricted stock | Quality -> Unrestricted (321) |\n| Reject (R) | Block stock or return to supplier | Quality -> Blocked (343) or return |\n| Conditional Accept | Accept with deviation documentation | Quality -> Unrestricted with note |\n| Scrap | Write off material | Quality -> Scrap (551) |\n| Rework | Return for reprocessing | Quality -> Rework (internal) |\n| Sample retained | Retain sample, release lot | Quality -> Unrestricted |\n\n### Follow-Up Actions\nUsage decisions can trigger automatic follow-up:\n- Quality notification creation (for rejected lots)\n- Vendor evaluation update (quality score adjustment)\n- Dynamic modification rule update (adjust future inspection level)\n- Stock posting (automatic goods movement)\n- Quality certificate creation\n\n## Quality Notifications\n\n### Notification Types\n| Type | Code | Use Case | Transaction |\n|------|------|----------|-------------|\n| Quality Notification (general) | Q1 | Customer complaint | QM01 |\n| Quality Notification (vendor) | Q2 | Supplier quality issue | QM01 |\n| Quality Notification (internal) | Q3 | Internal defect report | QM01 |\n\n### Notification Structure\n```\nNotification Header (reporter, priority, dates)\n  └── Items (defect descriptions with catalog codes)\n      └── Causes (root cause with catalog codes)\n          └── Activities\u002FTasks (corrective actions with responsible persons and deadlines)\n```\n\n### Key Transactions\n| Transaction | Purpose |\n|-------------|---------|\n| QM01 | Create quality notification |\n| QM02 | Change quality notification |\n| QM03 | Display quality notification |\n| QM10 | List of quality notifications |\n| QM50 | Notification processing deadline monitoring |\n\n### 8D Report Integration\nQuality notifications support the 8D methodology: D1 (Team), D2 (Problem Description), D3 (Containment), D4 (Root Cause), D5 (Corrective Action), D6 (Verification), D7 (Prevention), D8 (Closure). Map notification items, causes, and tasks to 8D steps.\n\n## Quality Certificates\n\n### Certificate Types (QC01\u002FQC02)\n| Type | Description |\n|------|-------------|\n| Inspection certificate | Results from inspection lot |\n| Certificate of analysis (CoA) | Detailed analytical results |\n| Certificate of conformance (CoC) | Declaration of compliance to spec |\n| Mill certificate (3.1) | EN 10204 material test certificate |\n\n### Certificate Processing\n- Automatic certificate creation from usage decision\n- Certificate output via print, email, EDI\n- Certificate profile configuration (QV51) — which characteristics appear\n- Inbound certificate processing from suppliers (QC51)\n\n## Statistical Process Control\n\n### Control Charts (QCC0\u002FQCC1)\n| Chart Type | Use Case |\n|------------|----------|\n| X-bar\u002FR | Mean and range for variable data |\n| X-bar\u002FS | Mean and standard deviation |\n| p-chart | Proportion defective (attribute data) |\n| np-chart | Number defective |\n| c-chart | Count of defects per unit |\n| u-chart | Defects per unit (variable sample size) |\n\n### SPC Configuration\n- Define control chart type per inspection characteristic\n- Configure control limits (calculated or manual)\n- Set rules for out-of-control signals (Western Electric rules)\n- Transaction QCC0: Maintain quality control chart\n\n## Key Tables\n\n| Table | Description |\n|-------|-------------|\n| QALS | Inspection lot header |\n| QASR | Inspection lot sample records |\n| QAVE | Usage decision header |\n| QAMR | Defect items for inspection lot |\n| QMEL | Quality notification header |\n| QMFE | Quality notification items |\n| QMUR | Quality notification causes |\n| QMMA | Quality notification activities |\n| PLKO | Inspection plan header (task list) |\n| PLPO | Inspection plan operations |\n| PLMK | Inspection plan characteristics |\n| QMAT | Material-inspection type assignment |\n\n## Integration Points\n\n| Integration | Description | Key Process |\n|-------------|-------------|-------------|\n| QM-MM | Goods receipt inspection | GR triggers inspection lot (type 01); usage decision moves stock |\n| QM-MM (vendor eval) | Vendor quality score | Usage decision updates vendor evaluation quality sub-criterion |\n| QM-PP | In-process inspection | Production confirmation triggers inspection lot (type 03) |\n| QM-PP (final) | Final inspection | Production GR triggers inspection lot (type 05) |\n| QM-SD | Delivery inspection | Delivery creation triggers inspection lot (type 04) |\n| QM-PM | Maintenance quality | Quality notifications from maintenance findings |\n| QM-CO | Quality costs | Inspection and non-conformance costs collected on orders |\n\n## S\u002F4HANA Quality Management\n\n### Key Changes\n- **Fiori Apps:** Manage Inspection Lots, Record Inspection Results, Create Quality Notification\n- **Embedded Analytics:** Real-time quality KPIs — defect rates, inspection lot status, supplier quality scores\n- **Simplified inspection processing:** Streamlined results recording and usage decision UI\n- **Integration with SAP DMC:** Digital Manufacturing Cloud for shop floor quality integration\n- **Quality Intelligence:** AI-assisted defect detection and pattern recognition (roadmap)\n\n### Key Fiori Apps\n| App ID | App Name |\n|--------|----------|\n| F2674 | Manage Inspection Lots |\n| F3859 | Record Inspection Results |\n| F2255 | Create Quality Notification |\n| F2583 | Monitor Quality |\n\n## Best Practices\n\n1. **Define catalogs before inspection plans** — standardized defect\u002Fcause codes are the foundation for quality analytics\n2. **Use dynamic modification** — automated inspection level adjustment reduces inspection cost while maintaining quality\n3. **Link notifications to CAPA** — corrective and preventive actions must be tracked to closure\n4. **Integrate with vendor evaluation** — quality inspection results should automatically influence vendor quality scores\n5. **Activate QM view in material master BEFORE go-live** — this is the most common missed step\n\n## Anti-Patterns\n\n- Creating inspection lots without inspection plans (lots with no characteristics are meaningless)\n- Leaving usage decisions open (blocks stock, distorts inventory reporting)\n- Using free text instead of catalog codes in notifications (prevents trend analysis)\n- Skipping sampling procedure configuration (all inspections default to 100% — costly and unnecessary)\n- Implementing QM without training production\u002Fwarehouse staff on results recording\n\n## Verification\n\nThis skill is complete ONLY when ALL of the following are true:\n- [ ] Correct QM process identified (planning, inspection, notification, certificate)\n- [ ] Material master QM view activation confirmed for relevant materials\n- [ ] Inspection type correctly mapped to business trigger (GR, production, delivery)\n- [ ] Catalog codes defined for defect types, causes, and corrective actions\n- [ ] Integration impacts stated (MM stock posting, PP process order, SD delivery, vendor eval)\n- [ ] Usage decision process and follow-up actions addressed\n\n**Evidence required:** Specific transaction codes, catalog configurations, inspection plan structure, and integration triggers — not generic quality management descriptions.\n\n## Next Skill\n\nAfter completing this skill, invoke:\n- `mm` — When goods receipt inspection or vendor evaluation is the focus\n- `pp` — When in-process or final inspection during production is needed\n- `sd` — When outbound delivery quality checks or customer complaints are the focus\n\n## Cross-References\n\n- `mm` — Goods receipt inspection, vendor evaluation, material master QM view\n- `pp` — In-process inspection, production order integration\n- `sd` — Delivery inspection, customer complaint quality notifications\n- `pm` — Maintenance-triggered quality findings\n- `co` — Quality cost collection and analysis\n","# SAP Quality Management (QM)\n\nThis skill enforces correct QM implementation practices, ensuring that inspection plans are maintained before procurement and production go-live, usage decisions are never skipped for inspection lots, and quality notifications are always linked to root cause analysis — because a quality notification without a root cause is a complaint, not a corrective action.\n\n## Content Routing\n\n| Topic | Section |\n|-------|---------|\n| Quality planning | Quality Planning |\n| Inspection plans and characteristics | Inspection Plans |\n| Quality inspection process | Quality Inspection |\n| Usage decisions | Usage Decisions |\n| Quality notifications | Quality Notifications |\n| Quality certificates | Quality Certificates |\n| SPC and control charts | Statistical Process Control |\n| Key tables and transactions | Key Tables \u002F Key Transactions |\n| Integration with MM, PP, SD | Integration Points |\n| S\u002F4HANA quality management | S\u002F4HANA Quality Management |\n\n## Iron Laws\n\n1. **ALWAYS MAINTAIN INSPECTION PLANS BEFORE PROCUREMENT\u002FPRODUCTION GO-LIVE.** Inspection lots are created automatically during goods receipt (MM) and production completion (PP). Without active inspection plans assigned to materials, these inspection lots have no inspection characteristics — making them meaningless checkboxes. Plans first, transactions second.\n2. **NEVER SKIP USAGE DECISION FOR INSPECTION LOTS.** The usage decision (QA11) is the formal quality verdict — accept, reject, or conditionally accept. An inspection lot without a usage decision is an open quality item. Open lots block stock (if configured for quality stock), distort inventory figures, and create audit findings.\n3. **ALWAYS LINK QUALITY NOTIFICATIONS TO ROOT CAUSE ANALYSIS.** A quality notification (QM01) that records a defect without analyzing its cause (using catalog codes for defect type, cause, and corrective action) is incident logging, not quality management. Every notification must have: defect description, cause code, corrective action, and responsible person.\n4. **NEVER CONFIGURE SAMPLING WITHOUT STATISTICAL BASIS.** Sampling procedures define how many units to inspect from a lot. Random sampling without statistical basis (AQL — Acceptable Quality Level, sampling scheme per ISO 2859) produces inspection results that cannot be defended in an audit.\n5. **ALWAYS ACTIVATE QM IN MATERIAL MASTER BEFORE EXPECTING INSPECTION LOT CREATION.** Inspection lot creation is triggered by the QM procurement\u002Fproduction view in the material master (inspection type activation). If the QM view is not maintained, no inspection lots are created — regardless of how many inspection plans exist.\n\n## Quality Planning\n\n### Material Specification\nDefine quality requirements at the material level:\n- **Material master QM view:** Activate inspection types (01-goods receipt, 03-in-process, 04-delivery, 08-stock transfer)\n- **Material specification (QS21):** Define required characteristic values for a material\n- **Inspection setup (QDV1):** Link inspection type to plant\u002Fmaterial with detailed control parameters\n\n### Catalog Management\nQuality catalogs define standardized code groups for:\n| Catalog Type | Purpose | Transaction |\n|-------------|---------|-------------|\n| 1 — Defect types | What is wrong (scratch, crack, dimension deviation) | QS41 |\n| 3 — Defect locations | Where on the item (surface, edge, interior) | QS41 |\n| 5 — Causes | Why it happened (tool wear, operator error, material defect) | QS41 |\n| 9 — Activities | What corrective action was taken (rework, scrap, sort) | QS41 |\n| E — Usage decisions | Possible quality verdicts (accept, reject, conditional) | QS51 |\n\n### Catalog Profiles\nGroup catalogs into profiles (QS41) and assign to notification types. Ensures consistent coding across plants and quality teams.\n\n## Inspection Plans\n\n### Plan Structure (QP01\u002FQP02\u002FQP03)\n```\nInspection Plan Header (material, plant, plan group\u002Fcounter)\n  └── Operation (sequence step — e.g., visual inspection, dimensional check)\n      └── Inspection Characteristic (specific measurement — e.g., length, weight, color)\n          └── Specification (target value, tolerances, sampling)\n```\n\n### Characteristic Types\n| Type | Description | Example |\n|------|-------------|---------|\n| Quantitative | Measured value with tolerances | Length: 100mm +\u002F- 0.5mm |\n| Qualitative | Attribute check (pass\u002Ffail, code) | Surface: OK \u002F Defective |\n| Formula-based | Calculated from other characteristics | Ratio = Length \u002F Width |\n\n### Master Inspection Characteristics (QS21)\nReusable characteristic definitions maintained centrally. Referenced in inspection plans. Changes to master characteristic propagate to all referencing plans.\n\n### Sampling Procedures (QDV2)\n| Sampling Type | Description |\n|---------------|-------------|\n| Fixed sample | Always inspect N units |\n| Percentage-based | Inspect X% of lot quantity |\n| Sampling scheme | AQL-based per ISO 2859 (single, double, sequential) |\n| 100% inspection | Inspect every unit (for critical characteristics) |\n| Skip lot | Skip inspection for qualified suppliers (dynamic modification) |\n\n### Dynamic Modification (QDP1\u002FQDP2)\nAutomatically adjust inspection scope based on quality history:\n- Good results -> reduce inspection (tighten skip lot)\n- Bad results -> increase inspection (from sampling to 100%)\n- Supplier quality score drives inspection level\n\n## Quality Inspection\n\n### Inspection Lot Creation\nInspection lots are created automatically based on triggers:\n\n| Inspection Type | Trigger | Source |\n|-----------------|---------|--------|\n| 01 — Goods receipt | MIGO goods receipt for purchase order | MM |\n| 03 — In-process | Production order confirmation at operation | PP |\n| 04 — Goods issue for delivery | Delivery creation for customer | SD |\n| 05 — Goods receipt from production | Production order goods receipt | PP |\n| 08 — Stock transfer | Stock transfer posting | MM |\n| 09 — Recurring inspection | Time-based for stored materials | QM |\n| 89 — Physical sample | Laboratory sample inspection | QM |\n\n### Results Recording (QA32\u002FQE01)\n| Transaction | Purpose |\n|-------------|---------|\n| QA32 | Change inspection lot — results recording |\n| QE01 | Results recording for inspection point |\n| QE51N | Results recording worklist |\n| QA33 | Display inspection lot |\n\nRecord measured values for each characteristic. System evaluates against specification (target, upper\u002Flower limits). Automatic valuation: characteristic accepted or rejected based on results.\n\n### Defect Recording (QA32\u002FQF01)\nRecord defects found during inspection with catalog codes:\n- Defect type (from catalog 1)\n- Defect location (from catalog 3)\n- Defect severity (critical, major, minor)\n- Quantity defective\n\n## Usage Decisions\n\n### Usage Decision Process (QA11\u002FQA12)\nThe formal quality verdict for an inspection lot:\n\n| Decision Code | Action | Stock Posting |\n|---------------|--------|---------------|\n| Accept (A) | Release to unrestricted stock | Quality -> Unrestricted (321) |\n| Reject (R) | Block stock or return to supplier | Quality -> Blocked (343) or return |\n| Conditional Accept | Accept with deviation documentation | Quality -> Unrestricted with note |\n| Scrap | Write off material | Quality -> Scrap (551) |\n| Rework | Return for reprocessing | Quality -> Rework (internal) |\n| Sample retained | Retain sample, release lot | Quality -> Unrestricted |\n\n### Follow-Up Actions\nUsage decisions can trigger automatic follow-up:\n- Quality notification creation (for rejected lots)\n- Vendor evaluation update (quality score adjustment)\n- Dynamic modification rule update (adjust future inspection level)\n- Stock posting (automatic goods movement)\n- Quality certificate creation\n\n## Quality Notifications\n\n### Notification Types\n| Type | Code | Use Case | Transaction |\n|------|------|----------|-------------|\n| Quality Notification (general) | Q1 | Customer complaint | QM01 |\n| Quality Notification (vendor) | Q2 | Supplier quality issue | QM01 |\n| Quality Notification (internal) | Q3 | Internal defect report | QM01 |\n\n### Notification Structure\n```\nNotification Header (reporter, priority, dates)\n  └── Items (defect descriptions with catalog codes)\n      └── Causes (root cause with catalog codes)\n          └── Activities\u002FTasks (corrective actions with responsible persons and deadlines)\n```\n\n### Key Transactions\n| Transaction | Purpose |\n|-------------|---------|\n| QM01 | Create quality notification |\n| QM02 | Change quality notification |\n| QM03 | Display quality notification |\n| QM10 | List of quality notifications |\n| QM50 | Notification processing deadline monitoring |\n\n### 8D Report Integration\nQuality notifications support the 8D methodology: D1 (Team), D2 (Problem Description), D3 (Containment), D4 (Root Cause), D5 (Corrective Action), D6 (Verification), D7 (Prevention), D8 (Closure). Map notification items, causes, and tasks to 8D steps.\n\n## Quality Certificates\n\n### Certificate Types (QC01\u002FQC02)\n| Type | Description |\n|------|-------------|\n| Inspection certificate | Results from inspection lot |\n| Certificate of analysis (CoA) | Detailed analytical results |\n| Certificate of conformance (CoC) | Declaration of compliance to spec |\n| Mill certificate (3.1) | EN 10204 material test certificate |\n\n### Certificate Processing\n- Automatic certificate creation from usage decision\n- Certificate output via print, email, EDI\n- Certificate profile configuration (QV51) — which characteristics appear\n- Inbound certificate processing from suppliers (QC51)\n\n## Statistical Process Control\n\n### Control Charts (QCC0\u002FQCC1)\n| Chart Type | Use Case |\n|------------|----------|\n| X-bar\u002FR | Mean and range for variable data |\n| X-bar\u002FS | Mean and standard deviation |\n| p-chart | Proportion defective (attribute data) |\n| np-chart | Number defective |\n| c-chart | Count of defects per unit |\n| u-chart | Defects per unit (variable sample size) |\n\n### SPC Configuration\n- Define control chart type per inspection characteristic\n- Configure control limits (calculated or manual)\n- Set rules for out-of-control signals (Western Electric rules)\n- Transaction QCC0: Maintain quality control chart\n\n## Key Tables\n\n| Table | Description |\n|-------|-------------|\n| QALS | Inspection lot header |\n| QASR | Inspection lot sample records |\n| QAVE | Usage decision header |\n| QAMR | Defect items for inspection lot |\n| QMEL | Quality notification header |\n| QMFE | Quality notification items |\n| QMUR | Quality notification causes |\n| QMMA | Quality notification activities |\n| PLKO | Inspection plan header (task list) |\n| PLPO | Inspection plan operations |\n| PLMK | Inspection plan characteristics |\n| QMAT | Material-inspection type assignment |\n\n## Integration Points\n\n| Integration | Description | Key Process |\n|-------------|-------------|-------------|\n| QM-MM | Goods receipt inspection | GR triggers inspection lot (type 01); usage decision moves stock |\n| QM-MM (vendor eval) | Vendor quality score | Usage decision updates vendor evaluation quality sub-criterion |\n| QM-PP | In-process inspection | Production confirmation triggers inspection lot (type 03) |\n| QM-PP (final) | Final inspection | Production GR triggers inspection lot (type 05) |\n| QM-SD | Delivery inspection | Delivery creation triggers inspection lot (type 04) |\n| QM-PM | Maintenance quality | Quality notifications from maintenance findings |\n| QM-CO | Quality costs | Inspection and non-conformance costs collected on orders |\n\n## S\u002F4HANA Quality Management\n\n### Key Changes\n- **Fiori Apps:** Manage Inspection Lots, Record Inspection Results, Create Quality Notification\n- **Embedded Analytics:** Real-time quality KPIs — defect rates, inspection lot status, supplier quality scores\n- **Simplified inspection processing:** Streamlined results recording and usage decision UI\n- **Integration with SAP DMC:** Digital Manufacturing Cloud for shop floor quality integration\n- **Quality Intelligence:** AI-assisted defect detection and pattern recognition (roadmap)\n\n### Key Fiori Apps\n| App ID | App Name |\n|--------|----------|\n| F2674 | Manage Inspection Lots |\n| F3859 | Record Inspection Results |\n| F2255 | Create Quality Notification |\n| F2583 | Monitor Quality |\n\n## Best Practices\n\n1. **Define catalogs before inspection plans** — standardized defect\u002Fcause codes are the foundation for quality analytics\n2. **Use dynamic modification** — automated inspection level adjustment reduces inspection cost while maintaining quality\n3. **Link notifications to CAPA** — corrective and preventive actions must be tracked to closure\n4. **Integrate with vendor evaluation** — quality inspection results should automatically influence vendor quality scores\n5. **Activate QM view in material master BEFORE go-live** — this is the most common missed step\n\n## Anti-Patterns\n\n- Creating inspection lots without inspection plans (lots with no characteristics are meaningless)\n- Leaving usage decisions open (blocks stock, distorts inventory reporting)\n- Using free text instead of catalog codes in notifications (prevents trend analysis)\n- Skipping sampling procedure configuration (all inspections default to 100% — costly and unnecessary)\n- Implementing QM without training production\u002Fwarehouse staff on results recording\n\n## Verification\n\nThis skill is complete ONLY when ALL of the following are true:\n- [ ] Correct QM process identified (planning, inspection, notification, certificate)\n- [ ] Material master QM view activation confirmed for relevant materials\n- [ ] Inspection type correctly mapped to business trigger (GR, production, delivery)\n- [ ] Catalog codes defined for defect types, causes, and corrective actions\n- [ ] Integration impacts stated (MM stock posting, PP process order, SD delivery, vendor eval)\n- [ ] Usage decision process and follow-up actions addressed\n\n**Evidence required:** Specific transaction codes, catalog configurations, inspection plan structure, and integration triggers — not generic quality management descriptions.\n\n## Next Skill\n\nAfter completing this skill, invoke:\n- `mm` — When goods receipt inspection or vendor evaluation is the focus\n- `pp` — When in-process or final inspection during production is needed\n- `sd` — When outbound delivery quality checks or customer complaints are the focus\n\n## Cross-References\n\n- `mm` — Goods receipt inspection, vendor evaluation, material master QM view\n- `pp` — In-process inspection, production order integration\n- `sd` — Delivery inspection, customer complaint quality notifications\n- `pm` — Maintenance-triggered quality findings\n- `co` — Quality cost collection and analysis\n",{"name":5,"description":7},"main","cf5d032baea1657808fa74369439ea7e9c7e0a20","skills\u002Fmodules\u002Fqm",3,"https:\u002F\u002Fgithub.com\u002Fvigneshbarani24\u002Fsap-superpowers","https:\u002F\u002Fsap-superpowers.vercel.app\u002F","https:\u002F\u002Fgithub.com\u002Fvigneshbarani24","2026-08-23 17:03:43",{"source":8,"skillName":5,"commands":49,"prompt":59,"zipAvailable":60},[50,53,56],{"tool":51,"command":52},"npx","npx skills add vigneshbarani24\u002Fsap-superpowers --skill qm",{"tool":54,"command":55},"bunx","bunx skills add vigneshbarani24\u002Fsap-superpowers --skill qm",{"tool":57,"command":58},"pnpm","pnpm dlx skills add vigneshbarani24\u002Fsap-superpowers --skill qm","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Fvigneshbarani24\u002Fsap-superpowers\u002Fblob\u002Fmain\u002Fskills\u002Fmodules\u002Fqm\u002FSKILL.md",true,[],[63,89,96,105,114,123],{"skillNo":64,"name":65,"nameZh":6,"description":66,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":67,"categories":68,"keywords":69,"publishedAt":35},"01M6EQTMCBV605ETS5WWEQX209","s4hana-migration","Use when advising on S\u002F4HANA migration approach, assessing greenfield vs brownfield vs selective data transition options, analyzing custom code impact, reviewing simplification items, or building a migration business case or timeline.","https:\u002F\u002Fgithub.com\u002Fvigneshbarani24\u002Fsap-superpowers\u002Fblob\u002Fmain\u002Fskills\u002Fstrategic\u002Fs4hana-migration\u002FSKILL.md",[],[70,71,72,73,74,75,76,77,78,79,80,81,26,82,83,84,85,86,87,88],"migration","s4hana migration","data","case","impact","discover","simplification","project","brownfield","options","business case","project manager","business","technical","architect","timeline","analyzing","code","prepare",{"skillNo":90,"name":91,"nameZh":6,"description":6,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":92,"categories":93,"keywords":94,"publishedAt":35},"01M6EQTGJHSYYQDMBJY0APE19X","rise-licensing","https:\u002F\u002Fgithub.com\u002Fvigneshbarani24\u002Fsap-superpowers\u002Fblob\u002Fmain\u002Fskills\u002Fstrategic\u002Frise-licensing\u002FSKILL.md",[],[95],"rise licensing",{"skillNo":97,"name":98,"nameZh":6,"description":6,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":99,"categories":100,"keywords":101,"publishedAt":35},"01M6EQTCVAJPYQ7A8SA49A1Y72","joule-strategy","https:\u002F\u002Fgithub.com\u002Fvigneshbarani24\u002Fsap-superpowers\u002Fblob\u002Fmain\u002Fskills\u002Fstrategic\u002Fjoule-strategy\u002FSKILL.md",[],[102,103,104],"joule strategy","joule","strategy",{"skillNo":106,"name":107,"nameZh":6,"description":6,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":108,"categories":109,"keywords":110,"publishedAt":35},"01M6EQTA7RMJ6RNFDTK1E2E9YY","clean-core-strategy","https:\u002F\u002Fgithub.com\u002Fvigneshbarani24\u002Fsap-superpowers\u002Fblob\u002Fmain\u002Fskills\u002Fstrategic\u002Fclean-core-strategy\u002FSKILL.md",[],[111,112,113,104],"clean core strategy","clean","core",{"skillNo":115,"name":116,"nameZh":6,"description":6,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":117,"categories":118,"keywords":119,"publishedAt":35},"01M6EQT6QCR8MJ7J62ZP8WZ578","activate-methodology","https:\u002F\u002Fgithub.com\u002Fvigneshbarani24\u002Fsap-superpowers\u002Fblob\u002Fmain\u002Fskills\u002Fstrategic\u002Factivate-methodology\u002FSKILL.md",[],[120,121,122],"methodology","activate","activate methodology",{"skillNo":124,"name":125,"nameZh":6,"description":126,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":127,"categories":128,"keywords":129,"publishedAt":35},"01M6EQT3XFHC6Y2F0EWQ62PHSR","strategic","strategic skills category for SAP Superpowers. Contains 5 sub-skills.","https:\u002F\u002Fgithub.com\u002Fvigneshbarani24\u002Fsap-superpowers\u002Fblob\u002Fmain\u002Fskills\u002Fstrategic\u002FSKILL.md",[],[125,130,25],"superpowers"]