AGENT SKILL

qm

Use when working with SAP Quality Management — quality planning (inspection plans, material specs), quality inspection (inspection lots, results recording, usage decisions), quality control (SPC, control charts), quality certificates, quality notifications, or QM integration with MM/PP/SD.

License 许可
MIT
最近更新
2026-08-23
Stars
★ 11
Forks
3

01 前言 Front Matter

name
qm
description
Use when working with SAP Quality Management — quality planning (inspection plans, material specs), quality inspection (inspection lots, results recording, usage decisions), quality control (SPC, control charts), quality certificates, quality notifications, or QM integration with MM/PP/SD.

03 SKILL.md 正文

SAP Quality Management (QM)

This skill enforces correct QM implementation practices, ensuring that inspection plans are maintained before procurement and production go-live, usage decisions are never skipped for inspection lots, and quality notifications are always linked to root cause analysis — because a quality notification without a root cause is a complaint, not a corrective action.

Content Routing

Topic Section
Quality planning Quality Planning
Inspection plans and characteristics Inspection Plans
Quality inspection process Quality Inspection
Usage decisions Usage Decisions
Quality notifications Quality Notifications
Quality certificates Quality Certificates
SPC and control charts Statistical Process Control
Key tables and transactions Key Tables / Key Transactions
Integration with MM, PP, SD Integration Points
S/4HANA quality management S/4HANA Quality Management

Iron Laws

  1. ALWAYS MAINTAIN INSPECTION PLANS BEFORE PROCUREMENT/PRODUCTION GO-LIVE. Inspection lots are created automatically during goods receipt (MM) and production completion (PP). Without active inspection plans assigned to materials, these inspection lots have no inspection characteristics — making them meaningless checkboxes. Plans first, transactions second.
  2. NEVER SKIP USAGE DECISION FOR INSPECTION LOTS. The usage decision (QA11) is the formal quality verdict — accept, reject, or conditionally accept. An inspection lot without a usage decision is an open quality item. Open lots block stock (if configured for quality stock), distort inventory figures, and create audit findings.
  3. ALWAYS LINK QUALITY NOTIFICATIONS TO ROOT CAUSE ANALYSIS. A quality notification (QM01) that records a defect without analyzing its cause (using catalog codes for defect type, cause, and corrective action) is incident logging, not quality management. Every notification must have: defect description, cause code, corrective action, and responsible person.
  4. NEVER CONFIGURE SAMPLING WITHOUT STATISTICAL BASIS. Sampling procedures define how many units to inspect from a lot. Random sampling without statistical basis (AQL — Acceptable Quality Level, sampling scheme per ISO 2859) produces inspection results that cannot be defended in an audit.
  5. ALWAYS ACTIVATE QM IN MATERIAL MASTER BEFORE EXPECTING INSPECTION LOT CREATION. Inspection lot creation is triggered by the QM procurement/production view in the material master (inspection type activation). If the QM view is not maintained, no inspection lots are created — regardless of how many inspection plans exist.

Quality Planning

Material Specification

Define quality requirements at the material level:

  • Material master QM view: Activate inspection types (01-goods receipt, 03-in-process, 04-delivery, 08-stock transfer)
  • Material specification (QS21): Define required characteristic values for a material
  • Inspection setup (QDV1): Link inspection type to plant/material with detailed control parameters

Catalog Management

Quality catalogs define standardized code groups for:

Catalog Type Purpose Transaction
1 — Defect types What is wrong (scratch, crack, dimension deviation) QS41
3 — Defect locations Where on the item (surface, edge, interior) QS41
5 — Causes Why it happened (tool wear, operator error, material defect) QS41
9 — Activities What corrective action was taken (rework, scrap, sort) QS41
E — Usage decisions Possible quality verdicts (accept, reject, conditional) QS51

Catalog Profiles

Group catalogs into profiles (QS41) and assign to notification types. Ensures consistent coding across plants and quality teams.

Inspection Plans

Plan Structure (QP01/QP02/QP03)

Inspection Plan Header (material, plant, plan group/counter)
  └── Operation (sequence step — e.g., visual inspection, dimensional check)
      └── Inspection Characteristic (specific measurement — e.g., length, weight, color)
          └── Specification (target value, tolerances, sampling)

Characteristic Types

Type Description Example
Quantitative Measured value with tolerances Length: 100mm +/- 0.5mm
Qualitative Attribute check (pass/fail, code) Surface: OK / Defective
Formula-based Calculated from other characteristics Ratio = Length / Width

Master Inspection Characteristics (QS21)

Reusable characteristic definitions maintained centrally. Referenced in inspection plans. Changes to master characteristic propagate to all referencing plans.

Sampling Procedures (QDV2)

Sampling Type Description
Fixed sample Always inspect N units
Percentage-based Inspect X% of lot quantity
Sampling scheme AQL-based per ISO 2859 (single, double, sequential)
100% inspection Inspect every unit (for critical characteristics)
Skip lot Skip inspection for qualified suppliers (dynamic modification)

Dynamic Modification (QDP1/QDP2)

Automatically adjust inspection scope based on quality history:

  • Good results -> reduce inspection (tighten skip lot)
  • Bad results -> increase inspection (from sampling to 100%)
  • Supplier quality score drives inspection level

Quality Inspection

Inspection Lot Creation

Inspection lots are created automatically based on triggers:

Inspection Type Trigger Source
01 — Goods receipt MIGO goods receipt for purchase order MM
03 — In-process Production order confirmation at operation PP
04 — Goods issue for delivery Delivery creation for customer SD
05 — Goods receipt from production Production order goods receipt PP
08 — Stock transfer Stock transfer posting MM
09 — Recurring inspection Time-based for stored materials QM
89 — Physical sample Laboratory sample inspection QM

Results Recording (QA32/QE01)

Transaction Purpose
QA32 Change inspection lot — results recording
QE01 Results recording for inspection point
QE51N Results recording worklist
QA33 Display inspection lot

Record measured values for each characteristic. System evaluates against specification (target, upper/lower limits). Automatic valuation: characteristic accepted or rejected based on results.

Defect Recording (QA32/QF01)

Record defects found during inspection with catalog codes:

  • Defect type (from catalog 1)
  • Defect location (from catalog 3)
  • Defect severity (critical, major, minor)
  • Quantity defective

Usage Decisions

Usage Decision Process (QA11/QA12)

The formal quality verdict for an inspection lot:

Decision Code Action Stock Posting
Accept (A) Release to unrestricted stock Quality -> Unrestricted (321)
Reject (R) Block stock or return to supplier Quality -> Blocked (343) or return
Conditional Accept Accept with deviation documentation Quality -> Unrestricted with note
Scrap Write off material Quality -> Scrap (551)
Rework Return for reprocessing Quality -> Rework (internal)
Sample retained Retain sample, release lot Quality -> Unrestricted

Follow-Up Actions

Usage decisions can trigger automatic follow-up:

  • Quality notification creation (for rejected lots)
  • Vendor evaluation update (quality score adjustment)
  • Dynamic modification rule update (adjust future inspection level)
  • Stock posting (automatic goods movement)
  • Quality certificate creation

Quality Notifications

Notification Types

Type Code Use Case Transaction
Quality Notification (general) Q1 Customer complaint QM01
Quality Notification (vendor) Q2 Supplier quality issue QM01
Quality Notification (internal) Q3 Internal defect report QM01

Notification Structure

Notification Header (reporter, priority, dates)
  └── Items (defect descriptions with catalog codes)
      └── Causes (root cause with catalog codes)
          └── Activities/Tasks (corrective actions with responsible persons and deadlines)

Key Transactions

Transaction Purpose
QM01 Create quality notification
QM02 Change quality notification
QM03 Display quality notification
QM10 List of quality notifications
QM50 Notification processing deadline monitoring

8D Report Integration

Quality notifications support the 8D methodology: D1 (Team), D2 (Problem Description), D3 (Containment), D4 (Root Cause), D5 (Corrective Action), D6 (Verification), D7 (Prevention), D8 (Closure). Map notification items, causes, and tasks to 8D steps.

Quality Certificates

Certificate Types (QC01/QC02)

Type Description
Inspection certificate Results from inspection lot
Certificate of analysis (CoA) Detailed analytical results
Certificate of conformance (CoC) Declaration of compliance to spec
Mill certificate (3.1) EN 10204 material test certificate

Certificate Processing

  • Automatic certificate creation from usage decision
  • Certificate output via print, email, EDI
  • Certificate profile configuration (QV51) — which characteristics appear
  • Inbound certificate processing from suppliers (QC51)

Statistical Process Control

Control Charts (QCC0/QCC1)

Chart Type Use Case
X-bar/R Mean and range for variable data
X-bar/S Mean and standard deviation
p-chart Proportion defective (attribute data)
np-chart Number defective
c-chart Count of defects per unit
u-chart Defects per unit (variable sample size)

SPC Configuration

  • Define control chart type per inspection characteristic
  • Configure control limits (calculated or manual)
  • Set rules for out-of-control signals (Western Electric rules)
  • Transaction QCC0: Maintain quality control chart

Key Tables

Table Description
QALS Inspection lot header
QASR Inspection lot sample records
QAVE Usage decision header
QAMR Defect items for inspection lot
QMEL Quality notification header
QMFE Quality notification items
QMUR Quality notification causes
QMMA Quality notification activities
PLKO Inspection plan header (task list)
PLPO Inspection plan operations
PLMK Inspection plan characteristics
QMAT Material-inspection type assignment

Integration Points

Integration Description Key Process
QM-MM Goods receipt inspection GR triggers inspection lot (type 01); usage decision moves stock
QM-MM (vendor eval) Vendor quality score Usage decision updates vendor evaluation quality sub-criterion
QM-PP In-process inspection Production confirmation triggers inspection lot (type 03)
QM-PP (final) Final inspection Production GR triggers inspection lot (type 05)
QM-SD Delivery inspection Delivery creation triggers inspection lot (type 04)
QM-PM Maintenance quality Quality notifications from maintenance findings
QM-CO Quality costs Inspection and non-conformance costs collected on orders

S/4HANA Quality Management

Key Changes

  • Fiori Apps: Manage Inspection Lots, Record Inspection Results, Create Quality Notification
  • Embedded Analytics: Real-time quality KPIs — defect rates, inspection lot status, supplier quality scores
  • Simplified inspection processing: Streamlined results recording and usage decision UI
  • Integration with SAP DMC: Digital Manufacturing Cloud for shop floor quality integration
  • Quality Intelligence: AI-assisted defect detection and pattern recognition (roadmap)

Key Fiori Apps

App ID App Name
F2674 Manage Inspection Lots
F3859 Record Inspection Results
F2255 Create Quality Notification
F2583 Monitor Quality

Best Practices

  1. Define catalogs before inspection plans — standardized defect/cause codes are the foundation for quality analytics
  2. Use dynamic modification — automated inspection level adjustment reduces inspection cost while maintaining quality
  3. Link notifications to CAPA — corrective and preventive actions must be tracked to closure
  4. Integrate with vendor evaluation — quality inspection results should automatically influence vendor quality scores
  5. Activate QM view in material master BEFORE go-live — this is the most common missed step

Anti-Patterns

  • Creating inspection lots without inspection plans (lots with no characteristics are meaningless)
  • Leaving usage decisions open (blocks stock, distorts inventory reporting)
  • Using free text instead of catalog codes in notifications (prevents trend analysis)
  • Skipping sampling procedure configuration (all inspections default to 100% — costly and unnecessary)
  • Implementing QM without training production/warehouse staff on results recording

Verification

This skill is complete ONLY when ALL of the following are true:

  • [ ] Correct QM process identified (planning, inspection, notification, certificate)
  • [ ] Material master QM view activation confirmed for relevant materials
  • [ ] Inspection type correctly mapped to business trigger (GR, production, delivery)
  • [ ] Catalog codes defined for defect types, causes, and corrective actions
  • [ ] Integration impacts stated (MM stock posting, PP process order, SD delivery, vendor eval)
  • [ ] Usage decision process and follow-up actions addressed

Evidence required: Specific transaction codes, catalog configurations, inspection plan structure, and integration triggers — not generic quality management descriptions.

Next Skill

After completing this skill, invoke:

  • mm — When goods receipt inspection or vendor evaluation is the focus
  • pp — When in-process or final inspection during production is needed
  • sd — When outbound delivery quality checks or customer complaints are the focus

Cross-References

  • mm — Goods receipt inspection, vendor evaluation, material master QM view
  • pp — In-process inspection, production order integration
  • sd — Delivery inspection, customer complaint quality notifications
  • pm — Maintenance-triggered quality findings
  • co — Quality cost collection and analysis

04 同仓库更多 Skills