01 前言 Front Matter

args
Phase number
name
plan-phase
description
Plan a phase — decompose scope into a reviewed issue set, propose wave structure with configured tech-debt intake, create issues only after user approval

02 资源文件 43

03 SKILL.md 正文

Plan a phase of work: decompose the phase scope into a reviewed, dependency-ordered issue set, propose a wave structure, and — only after explicit user approval — create the issues.

Config-driven: board settings, labels, and the tech-debt intake percentage come from .claude/framework.config.json (fail-open to the documented defaults). Never hard-code a project choice here.

Instructions

0. Resolve config

REPO_ROOT="$(git rev-parse --show-toplevel 2>/dev/null || pwd)"
CFG="$REPO_ROOT/.claude/framework.config.json"
get() { jq -r "$1 // empty" "$CFG" 2>/dev/null; }   # fail-open dotted read

TEAM_DIR="$REPO_ROOT/$(get '.paths.team')"; [ -d "$TEAM_DIR" ] || TEAM_DIR="$REPO_ROOT/.claude/team"
TD_LABEL="$(get '.labels.tech_debt')";      TD_LABEL="${TD_LABEL:-tech-debt}"
BOARD_ENABLED="$(get '.board.enabled')"
BOARD_NUM="$(get '.board.project_number')"
OWNER="$(get '.scm.owner')"

# Tech-debt intake percentage — CONFIG KEY `policy.tech_debt_intake_pct` (default 20).
TD_INTAKE_PCT="$(get '.policy.tech_debt_intake_pct')"; TD_INTAKE_PCT="${TD_INTAKE_PCT:-20}"

1. Gather phase scope

Use the full backlog as the candidate pool. Never plan from a narrower view (a single label query, or a meta-issue body alone) — that systematically excludes work that never got a label.

If a planning board is configured (board.enabled true + board.project_number set), the board is the authoritative backlog — audit for drift first:

if [ "$BOARD_ENABLED" = "true" ] && [ -n "$BOARD_NUM" ]; then
  # Every open issue should be on the board; any output below = drift — add the
  # missing issues to the board before continuing.
  gh issue list --state open --limit 500 --json url --jq '.[].url' | sort -u > /tmp/open_issues.txt
  gh project item-list "$BOARD_NUM" --owner "$OWNER" --format json --limit 1000 \
    --jq '.items[] | select(.content.url) | .content.url' | sort -u > /tmp/board_urls.txt
  comm -23 /tmp/open_issues.txt /tmp/board_urls.txt
else
  gh issue list --state open --limit 500 --json number,title,labels,body
fi

For a meta-and-children project, repeat the open-issue sweep per repo in project.repos and aggregate.

Additional context sources:

  • Project memory / docs for stated goals
  • The previous phase's retro entries in $TEAM_DIR/feedback_log.md for carry-over items
  • The previous phase doc under $TEAM_DIR/phases/ (if present) for unmet exit criteria

2. Draft the issue set (do NOT create anything yet)

For each work item, draft (in the plan, not on the issue tracker):

  • Title: verb-first, specific (e.g., "Add branch-pattern matching to stale-issue audit")
  • Body: Summary, acceptance criteria (checkbox list), origin/rationale
  • Labels: phase label (phase-{N}), category (feature, bug, tech-debt, security, infra), and repo label for meta-and-children projects
  • Proposed assignee: best fit from the roster (identity.roster_source) by expertise match, current load, and repo familiarity

Issue creation happens in Step 7, after the Step-6 approval gate.

3. Six-perspective structured review

Review every drafted issue from all six perspectives:

Perspective Focus
Architecture System design, API contracts, data-model impact
DevOps Deployment impact, infrastructure needs, CI changes
Data Data migration, pipeline impact, schema changes
Tech Lead Scope accuracy, effort estimate, risk
QA Testability, edge cases, acceptance-criteria completeness
Security Auth impact, input validation, data exposure

For each concern raised, either fold the resolution into the draft body now, or record a review note to post as an issue comment after creation:

gh issue comment {NUMBER} --body "$(cat <<'EOF'
**{Perspective} Review**

{findings — concerns, suggestions, or "No concerns"}
EOF
)"

4. Dependency analysis

Build a dependency graph across the drafted issues:

  • Which issues must complete before others can start?
  • Which issues touch the same files/systems (serialize to avoid conflicts)?
  • For meta-and-children projects: which cross-repo dependencies exist?

5. Propose wave structure — with the configured tech-debt intake

Group issues into waves by:

  • Priority: live bugs > security > tech debt > features > polish
  • Dependencies: blockers in earlier waves, dependents later
  • Parallelism: maximize concurrent work by grouping independent issues
  • Repo grouping (meta-and-children): minimize context-switching per agent

Tech-debt intake per wave (policy.tech_debt_intake_pct, default 20). For each wave, after the feature/bug/security content is set, allocate tech-debt-only issues equal to TD_INTAKE_PCT% of that content, rounded up — add all available if fewer qualify (a shortfall is healthy; never backfill with invented work). Steady intake replaces ratio-chasing: a cumulative tech-debt-ratio gate whipsaws as the backlog shrinks, so the per-wave intake is the standing policy.

Last-wave-of-phase relaxation. The intake percentage is a per-wave cap on every wave except the last wave of the phase, where it becomes a floor: deliberately pull in a large chunk of tech-debt (well beyond the configured percentage) to clean up before phase exit — clearing debt is the goal there. /phase-review's exit threshold (policy.tech_debt_exit_ratio_pct) is the gate this relaxation exists to satisfy.

Present the proposed structure:

**Phase {N} Plan**

### Wave 1: {theme}
| Issue | Title | Assignee | Priority | Dependencies |
|-------|-------|----------|----------|--------------|
| draft | ...   | Name     | bug      | None         |

### Wave 2: {theme}
| Issue | Title | Assignee | Priority | Dependencies |
|-------|-------|----------|----------|--------------|
| draft | ...   | Name     | feature  | Wave 1: ...  |

**Total issues:** {count}  ·  **Estimated waves:** {count}
**Tech-debt intake:** {TD_INTAKE_PCT}% per wave ({allocated} of {content} items; final wave: floor)
**Cross-repo dependencies:** {list or "None"}

6. APPROVAL GATE — present the plan, then STOP

Display the full plan. Do NOT create issues or start implementation without explicit user approval. The user may:

  • Approve the plan as-is
  • Request changes to scope, assignments, or wave grouping
  • Defer specific items to a later phase

Only the approved plan moves to Step 7.

7. Create the approved issues

For each approved draft:

gh issue create --title "{title}" --body "$(cat <<'EOF'
## Summary
{description}

## Acceptance Criteria
- [ ] {criterion 1}
- [ ] {criterion 2}

## Origin
{why this work exists — user request, retro finding, dependency, phase goal}
EOF
)" --label "phase-{N}" --label "{category}"

Then assign (assignee-label convention) and board-add if a board is configured:

gh issue edit {NUMBER} --add-label "{FIRSTNAME_LASTNAME}"
[ "$BOARD_ENABLED" = "true" ] && gh project item-add "$BOARD_NUM" --owner "$OWNER" --url "{ISSUE_URL}" || true

8. Record the phase doc

Write $TEAM_DIR/phases/phase-{N}.md capturing the approved plan: a created: {date} line, the phase goals / exit criteria, and the tracking table of created issue numbers per wave. /phase-review reads this doc as its source of truth — a phase without it cannot be health-checked.

What remains manual

  • The Step-6 approval gate: the user approves the plan before any issue is created.
  • Cross-team dependency resolution requires coordination outside this repo.
  • Effort estimates are rough — actual complexity may shift items between waves.