plan-phase
Plan a phase — decompose scope into a reviewed issue set, propose wave structure with configured tech-debt intake, create issues only after user approval
- License 许可
- Apache-2.0
- 最近更新
- 2026-09-21
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- args
- Phase number
- name
- plan-phase
- description
- Plan a phase — decompose scope into a reviewed issue set, propose wave structure with configured tech-debt intake, create issues only after user approval
02 资源文件 43
- 参考文档agents/openai.yaml249 B
- 资产文件assets/logo-small.png29.0 KB
- 资产文件assets/logo.png389.5 KB
- 资产文件assets/logo.svg2.0 KB
- 参考文档references/accessibility-patterns.md5.9 KB
- 参考文档references/animation-advanced.md11.1 KB
- 参考文档references/animation-basics.md6.7 KB
- 参考文档references/animation-transitions.md7.4 KB
- 参考文档references/charts-accessibility.md6.1 KB
- 参考文档references/charts.md16.8 KB
- 参考文档references/focus-patterns.md8.7 KB
- 参考文档references/image-optimization.md7.2 KB
- 参考文档references/latest-apis.md17.7 KB
- 参考文档references/layout-best-practices.md6.8 KB
- 参考文档references/liquid-glass.md11.6 KB
- 参考文档references/list-patterns.md15.4 KB
- 参考文档references/localization.md9.7 KB
- 参考文档references/macos-scenes.md9.1 KB
- 参考文档references/macos-views.md10.6 KB
- 参考文档references/macos-window-styling.md8.6 KB
- 参考文档references/performance-patterns.md12.9 KB
- 参考文档references/previews.md8.1 KB
- 参考文档references/scroll-patterns.md10.6 KB
- 参考文档references/sheet-navigation-patterns.md10.6 KB
- 参考文档references/soft-deprecation.md2.9 KB
- 参考文档references/state-management.md20.7 KB
- 参考文档references/text-patterns.md1.4 KB
- 参考文档references/trace-analysis.md14.1 KB
- 参考文档references/trace-recording.md5.8 KB
- 参考文档references/view-structure.md28.8 KB
- 脚本scripts/analyze_trace.py9.9 KB
- 脚本scripts/instruments_parser/__init__.py69 B
- 脚本scripts/instruments_parser/causes.py5.9 KB
- 脚本scripts/instruments_parser/correlate.py6.2 KB
- 脚本scripts/instruments_parser/events.py10.6 KB
- 脚本scripts/instruments_parser/hangs.py3.4 KB
- 脚本scripts/instruments_parser/hitches.py4.5 KB
- 脚本scripts/instruments_parser/summary.py9.1 KB
- 脚本scripts/instruments_parser/swiftui.py6.6 KB
- 脚本scripts/instruments_parser/time_profiler.py4.3 KB
- 脚本scripts/instruments_parser/xctrace.py3.5 KB
- 脚本scripts/instruments_parser/xml_utils.py7.4 KB
- 脚本scripts/record_trace.py10.6 KB
03 SKILL.md 正文
Plan a phase of work: decompose the phase scope into a reviewed, dependency-ordered issue set, propose a wave structure, and — only after explicit user approval — create the issues.
Config-driven: board settings, labels, and the tech-debt intake percentage come from
.claude/framework.config.json (fail-open to the documented defaults). Never hard-code a
project choice here.
Instructions
0. Resolve config
REPO_ROOT="$(git rev-parse --show-toplevel 2>/dev/null || pwd)"
CFG="$REPO_ROOT/.claude/framework.config.json"
get() { jq -r "$1 // empty" "$CFG" 2>/dev/null; } # fail-open dotted read
TEAM_DIR="$REPO_ROOT/$(get '.paths.team')"; [ -d "$TEAM_DIR" ] || TEAM_DIR="$REPO_ROOT/.claude/team"
TD_LABEL="$(get '.labels.tech_debt')"; TD_LABEL="${TD_LABEL:-tech-debt}"
BOARD_ENABLED="$(get '.board.enabled')"
BOARD_NUM="$(get '.board.project_number')"
OWNER="$(get '.scm.owner')"
# Tech-debt intake percentage — CONFIG KEY `policy.tech_debt_intake_pct` (default 20).
TD_INTAKE_PCT="$(get '.policy.tech_debt_intake_pct')"; TD_INTAKE_PCT="${TD_INTAKE_PCT:-20}"
1. Gather phase scope
Use the full backlog as the candidate pool. Never plan from a narrower view (a single label query, or a meta-issue body alone) — that systematically excludes work that never got a label.
If a planning board is configured (board.enabled true + board.project_number set), the
board is the authoritative backlog — audit for drift first:
if [ "$BOARD_ENABLED" = "true" ] && [ -n "$BOARD_NUM" ]; then
# Every open issue should be on the board; any output below = drift — add the
# missing issues to the board before continuing.
gh issue list --state open --limit 500 --json url --jq '.[].url' | sort -u > /tmp/open_issues.txt
gh project item-list "$BOARD_NUM" --owner "$OWNER" --format json --limit 1000 \
--jq '.items[] | select(.content.url) | .content.url' | sort -u > /tmp/board_urls.txt
comm -23 /tmp/open_issues.txt /tmp/board_urls.txt
else
gh issue list --state open --limit 500 --json number,title,labels,body
fi
For a meta-and-children project, repeat the open-issue sweep per repo in project.repos
and aggregate.
Additional context sources:
- Project memory / docs for stated goals
- The previous phase's retro entries in
$TEAM_DIR/feedback_log.mdfor carry-over items - The previous phase doc under
$TEAM_DIR/phases/(if present) for unmet exit criteria
2. Draft the issue set (do NOT create anything yet)
For each work item, draft (in the plan, not on the issue tracker):
- Title: verb-first, specific (e.g., "Add branch-pattern matching to stale-issue audit")
- Body: Summary, acceptance criteria (checkbox list), origin/rationale
- Labels: phase label (
phase-{N}), category (feature,bug,tech-debt,security,infra), and repo label for meta-and-children projects - Proposed assignee: best fit from the roster (
identity.roster_source) by expertise match, current load, and repo familiarity
Issue creation happens in Step 7, after the Step-6 approval gate.
3. Six-perspective structured review
Review every drafted issue from all six perspectives:
| Perspective | Focus |
|---|---|
| Architecture | System design, API contracts, data-model impact |
| DevOps | Deployment impact, infrastructure needs, CI changes |
| Data | Data migration, pipeline impact, schema changes |
| Tech Lead | Scope accuracy, effort estimate, risk |
| QA | Testability, edge cases, acceptance-criteria completeness |
| Security | Auth impact, input validation, data exposure |
For each concern raised, either fold the resolution into the draft body now, or record a review note to post as an issue comment after creation:
gh issue comment {NUMBER} --body "$(cat <<'EOF'
**{Perspective} Review**
{findings — concerns, suggestions, or "No concerns"}
EOF
)"
4. Dependency analysis
Build a dependency graph across the drafted issues:
- Which issues must complete before others can start?
- Which issues touch the same files/systems (serialize to avoid conflicts)?
- For meta-and-children projects: which cross-repo dependencies exist?
5. Propose wave structure — with the configured tech-debt intake
Group issues into waves by:
- Priority: live bugs > security > tech debt > features > polish
- Dependencies: blockers in earlier waves, dependents later
- Parallelism: maximize concurrent work by grouping independent issues
- Repo grouping (meta-and-children): minimize context-switching per agent
Tech-debt intake per wave (policy.tech_debt_intake_pct, default 20). For each wave,
after the feature/bug/security content is set, allocate tech-debt-only issues equal to
TD_INTAKE_PCT% of that content, rounded up — add all available if fewer qualify (a
shortfall is healthy; never backfill with invented work). Steady intake replaces
ratio-chasing: a cumulative tech-debt-ratio gate whipsaws as the backlog shrinks, so the
per-wave intake is the standing policy.
Last-wave-of-phase relaxation. The intake percentage is a per-wave cap on every wave
except the last wave of the phase, where it becomes a floor: deliberately pull in a
large chunk of tech-debt (well beyond the configured percentage) to clean up before phase
exit — clearing debt is the goal there. /phase-review's exit threshold
(policy.tech_debt_exit_ratio_pct) is the gate this relaxation exists to satisfy.
Present the proposed structure:
**Phase {N} Plan**
### Wave 1: {theme}
| Issue | Title | Assignee | Priority | Dependencies |
|-------|-------|----------|----------|--------------|
| draft | ... | Name | bug | None |
### Wave 2: {theme}
| Issue | Title | Assignee | Priority | Dependencies |
|-------|-------|----------|----------|--------------|
| draft | ... | Name | feature | Wave 1: ... |
**Total issues:** {count} · **Estimated waves:** {count}
**Tech-debt intake:** {TD_INTAKE_PCT}% per wave ({allocated} of {content} items; final wave: floor)
**Cross-repo dependencies:** {list or "None"}
6. APPROVAL GATE — present the plan, then STOP
Display the full plan. Do NOT create issues or start implementation without explicit user approval. The user may:
- Approve the plan as-is
- Request changes to scope, assignments, or wave grouping
- Defer specific items to a later phase
Only the approved plan moves to Step 7.
7. Create the approved issues
For each approved draft:
gh issue create --title "{title}" --body "$(cat <<'EOF'
## Summary
{description}
## Acceptance Criteria
- [ ] {criterion 1}
- [ ] {criterion 2}
## Origin
{why this work exists — user request, retro finding, dependency, phase goal}
EOF
)" --label "phase-{N}" --label "{category}"
Then assign (assignee-label convention) and board-add if a board is configured:
gh issue edit {NUMBER} --add-label "{FIRSTNAME_LASTNAME}"
[ "$BOARD_ENABLED" = "true" ] && gh project item-add "$BOARD_NUM" --owner "$OWNER" --url "{ISSUE_URL}" || true
8. Record the phase doc
Write $TEAM_DIR/phases/phase-{N}.md capturing the approved plan: a created: {date}
line, the phase goals / exit criteria, and the tracking table of created issue numbers per
wave. /phase-review reads this doc as its source of truth — a phase without it cannot be
health-checked.
What remains manual
- The Step-6 approval gate: the user approves the plan before any issue is created.
- Cross-team dependency resolution requires coordination outside this repo.
- Effort estimates are rough — actual complexity may shift items between waves.
04 同仓库更多 Skills
wave-wrapup
Finalize a wave — PR review, merge sequencing, issue cleanup, worktree cleanup, and handoff to retro
wave-start
Initialize a new wave — worktree cleanup, branch creation, label setup, status file update
wave-scope
Reconcile declared-vs-labeled wave scope between /wave-retro and /wave-kickoff — collect dispositions, fold in retro carry-forwards and memory must-includes, and refresh the meta-issue
wave-retro
Automated wave retrospective — PR analysis, assessments, trust matrix updates, feedback log, charter change proposals
wave-kickoff
Automated wave planning — branch creation, label management, issue labeling, kickoff comments, and execution plan
wave-audit
Audit open issues against merged PRs — find and close orphaned issues with proper comments