phase-review
Phase-level health check before scoping the next wave — phase-doc tracking state, tech-debt ratio vs the configured exit threshold, owner revision checkpoint
- License 许可
- Apache-2.0
- 最近更新
- 2026-09-21
- Stars
- ★ 0
- Forks
- 0
01 前言 Front Matter
- args
- Phase number
- name
- phase-review
- description
- Phase-level health check before scoping the next wave — phase-doc tracking state, tech-debt ratio vs the configured exit threshold, owner revision checkpoint
03 SKILL.md 正文
Phase-level track check, run before scoping the next wave. Surfaces accomplishments, blockers, and remaining end-state criteria so the owner chooses the next wave's theme deliberately, not reactively.
Config-driven: the tech-debt exit threshold and labels come from
.claude/framework.config.json (fail-open to the documented defaults).
What this skill is NOT
- Not a wave reconciliation step — that is the wave-lifecycle scoping step
(
lifecycle.py wave scope). - Not a retrospective — that is
/wave-retro(per wave). - Not a phase-creation step —
/plan-phasecreates phases. - It does NOT pick the next wave's theme — that is the owner's call after seeing the picture.
- It does NOT modify the phase doc without owner confirmation.
Instructions
0. Resolve config
REPO_ROOT="$(git rev-parse --show-toplevel 2>/dev/null || pwd)"
CFG="$REPO_ROOT/.claude/framework.config.json"
get() { jq -r "$1 // empty" "$CFG" 2>/dev/null; } # fail-open dotted read
TEAM_DIR="$REPO_ROOT/$(get '.paths.team')"; [ -d "$TEAM_DIR" ] || TEAM_DIR="$REPO_ROOT/.claude/team"
TD_LABEL="$(get '.labels.tech_debt')"; TD_LABEL="${TD_LABEL:-tech-debt}"
# Tech-debt exit threshold — CONFIG KEY `policy.tech_debt_exit_ratio_pct` (default 10).
TD_EXIT_PCT="$(get '.policy.tech_debt_exit_ratio_pct')"; TD_EXIT_PCT="${TD_EXIT_PCT:-10}"
1. Load the phase doc
PHASE_DOC="$TEAM_DIR/phases/phase-{P}.md"
if [ ! -f "$PHASE_DOC" ]; then
echo "ERROR: phase doc missing at $PHASE_DOC"
echo "Run /plan-phase first — it records the phase doc this review checks against."
exit 1
fi
cat "$PHASE_DOC"
If the phase doc is missing, STOP and direct the owner to /plan-phase (its Step 8
records the doc). Without it, this review has nothing to check against.
2. Pull live state for each tracking issue
Extract the tracking issue numbers from the phase doc and pull their current state.
(Note: while read, not for x in $VAR — zsh does not word-split an unquoted scalar, so
a multi-line list would collapse into one bogus iteration.)
TRACKING_ISSUES=$(grep -oE '#[0-9]+' "$PHASE_DOC" | tr -d '#' | sort -un)
while IFS= read -r num; do
[ -n "$num" ] || continue
gh issue view "$num" --json number,title,state,labels,closedAt \
--jq '"\(.state)\t#\(.number)\t[\(.labels|map(.name)|join(","))]\t\(.title)"'
done <<< "$TRACKING_ISSUES"
Categorize each phase criterion:
- Done — tracking issue closed
- In flight — open, with linked open PRs
- Open / not started — open, no linked PRs
- Blocked — open, with a
blockedlabel or a commented blocker
For a meta-and-children project, tracking refs may be repo#N — query the named repo
with --repo in that case.
3. Tech-debt ratio vs the configured exit threshold
PHASE_START=$(grep '^created:' "$PHASE_DOC" | head -1 | awk '{print $2}')
# New issues filed during the phase, all states
TOTAL_NEW=$(gh issue list --search "created:>=$PHASE_START" --state all --limit 500 --json number | jq length)
TOTAL_NEW_TD=$(gh issue list --search "created:>=$PHASE_START label:$TD_LABEL" --state all --limit 500 --json number | jq length)
# Cumulative open
CUM_OPEN=$(gh issue list --state open --limit 500 --json number | jq length)
CUM_OPEN_TD=$(gh issue list --state open --label "$TD_LABEL" --limit 500 --json number | jq length)
[ "$TOTAL_NEW" -gt 0 ] && new_pct=$((TOTAL_NEW_TD * 100 / TOTAL_NEW)) || new_pct=0
[ "$CUM_OPEN" -gt 0 ] && cum_pct=$((CUM_OPEN_TD * 100 / CUM_OPEN)) || cum_pct=0
echo "New filed this phase: $TOTAL_NEW_TD / $TOTAL_NEW = ${new_pct}% tech-debt (gate: <${TD_EXIT_PCT}%)"
echo "Cumulative open: $CUM_OPEN_TD / $CUM_OPEN = ${cum_pct}% tech-debt (gate: <${TD_EXIT_PCT}%)"
If either ratio ≥ TD_EXIT_PCT, flag it: the phase exit gate is not met, regardless
of criterion-by-criterion checkboxes. (/plan-phase's last-wave tech-debt floor exists
to bring these ratios under the gate before exit.)
For a meta-and-children project, run the same queries per repo in project.repos and
aggregate the counts.
4. Surface to the owner
Present a single status block:
**Phase {P} Review — {date}**
| # | Criterion | Tracker | State | Notes |
|---|-----------|---------|-------|-------|
| 1 | ... | #NNN | Open | No PRs |
| 2 | ... | #NNN | In flight | PR #XXX |
**Tech-debt ratio (exit gate: <{TD_EXIT_PCT}%):**
- New filed (phase-to-date): {new_pct}%
- Cumulative open: {cum_pct}%
**Phase exit gate:** {MET / NOT MET — reason}
5. Owner revision checkpoint
Ask the owner:
- Has the track drifted? (criteria thought done but actually open; new urgent items)
- Should the phase doc be revised before the next wave is scoped?
If yes, edit $PHASE_DOC with the owner's input and commit (per the project's commit
identity rules). Never revise the doc without the owner's explicit confirmation.
6. Hand off to next-wave scoping
Print:
Phase review complete. Ready to scope the next wave.
The next wave proceeds through the wave-lifecycle steps (/wave-start, or
lifecycle.py wave allocate/start/scope) once the owner picks the theme.
What remains manual
- The owner decides the next wave's theme and any phase-doc revisions.
- Blocked criteria need human triage — this skill only surfaces them.
04 同仓库更多 Skills
wave-wrapup
Finalize a wave — PR review, merge sequencing, issue cleanup, worktree cleanup, and handoff to retro
wave-start
Initialize a new wave — worktree cleanup, branch creation, label setup, status file update
wave-scope
Reconcile declared-vs-labeled wave scope between /wave-retro and /wave-kickoff — collect dispositions, fold in retro carry-forwards and memory must-includes, and refresh the meta-issue
wave-retro
Automated wave retrospective — PR analysis, assessments, trust matrix updates, feedback log, charter change proposals
wave-kickoff
Automated wave planning — branch creation, label management, issue labeling, kickoff comments, and execution plan
wave-audit
Audit open issues against merged PRs — find and close orphaned issues with proper comments