Scores utilities for datacenter siting responsiveness using 8 dimensions (large-load tariffs, interconnection speed, IRP alignment, etc.). Use when the user asks about utility responsiveness for datacenter siting, scoring or comparing utilities, or evaluating which utilities are most responsive to large-load customers.

License 许可
MIT
最近更新
2026-03-16
Stars
★ 0
Forks
0

01 前言 Front Matter

name
urs
description
Scores utilities for datacenter siting responsiveness using 8 dimensions (large-load tariffs, interconnection speed, IRP alignment, etc.). Use when the user asks about utility responsiveness for datacenter siting, scoring or comparing utilities, or evaluating which utilities are most responsive to large-load customers.

02 资源文件 10

03 SKILL.md 正文

URS — Utility Responsiveness Scoring

Use this skill when the user asks about utility responsiveness for datacenter siting, scoring utilities, comparing utilities, or evaluating which utilities are most responsive to large-load customers.

What URS Does

URS systematizes tribal knowledge about utility behavior into a numeric score (0–100) and structured rationale. The blocking constraint for datacenter siting is not grid capacity (hyperscalers have that) but which utilities negotiate creatively on tariffs, complete interconnection studies quickly, and have internal champions for large load.

The 8 Scoring Dimensions

ID Label What It Measures
large_load_tariff Large-Load Tariff Flexibility Economic development riders, custom rate schedules, special contracts vs. standard C&I rates
interconnection_speed Interconnection Study Speed Historical pace of system impact and facilities studies (load-side, not FERC queue)
irp_alignment IRP Alignment with Large Load Growth Whether IRP acknowledges/plans for datacenter/industrial load vs. treats it as a threat
regulatory_environment Regulatory and Political Environment State-level structure: datacenter incentives, commission attitudes, legislative actions
leadership_posture Utility Leadership Posture CEO/board signals: welcoming datacenter development vs. viewing as system-stress liability
grid_headroom Grid Capacity and Headroom Posture Posture toward constraints: proactive upgrades, phased delivery vs. hard no
track_record Track Record with Prior Large-Load Customers History serving 50+ MW customers; organizational muscle memory
clean_energy_posture Sustainability and Clean Energy Accommodation Green tariffs, sleeved PPAs, behind-the-meter; 24/7 CFE accommodation

Each dimension scores 0–100 with confidence 0–1. The composite is a weighted average. Tiers: 80–100 = Highly responsive, 60–79 = Moderately responsive, 40–59 = Mixed signals, 20–39 = Likely slow, 0–19 = Structurally unresponsive.

When to Use Each Tool

  • urs_import_eia — When the user needs more utilities than the seed provides, or wants to populate the DB. Import from EIA-861 CSV via file_path (local) or url. Covers ~3,300 US utilities. Download from eia.gov/electricity/data/eia861/.
  • urs_lookup — First step when the user mentions a utility by name, state, or ID. Resolves to EIA Utility ID. If ambiguous, present candidates and ask the user to choose.
  • urs_score — When the user wants to score, evaluate, or compare utilities. Call with utility_id from lookup. Include mw_requirement, target_isd, use_case if the user stated them.
  • urs_ingest — When the user provides a document (IRP, tariff filing, earnings transcript) to add to the knowledge base. Requires file path, source type, utility ID.
  • urs_fetch_edgar — When the user wants to pull 10-K/10-Q filings from SEC EDGAR for an investor-owned utility. Fetches from SEC's free API, optionally ingests for scoring. Only works for utilities with a CIK mapping (see data/edgar-cik-map.ts). APS (803), Duke (6452), Dominion (13998) are mapped.
  • urs_fetch_pudl — When the user wants FERC Form 1 data for track_record. Uses PUDL (Catalyst Cooperative). Requires ferc_id on utility. Downloads ferc1_dbf.sqlite from Zenodo on first run (~271MB). Pass pudl_sqlite_path for local file.
  • urs_fetch_eia — When the user wants EIA retail sales/customers data for track_record. Requires EIA_API_KEY (free at eia.gov/opendata).
  • urs_fetch_legiscan — When the user wants state energy/datacenter legislation for regulatory_environment. Requires LEGISCAN_API_KEY (free, 30k/month). Pass state or utility_id.
  • urs_fetch_hifld — When the user wants to enrich utilities with HIFLD territory metadata (names, addresses, types). No API key. Filter by state or utility_name.
  • urs_history — When the user asks for score history or trends over time.
  • urs_sources — When the user asks what data backs a score, or which sources are stale.
  • urs_fetch_legiscan — When the user wants to search state legislature bills related to energy/datacenters. Searches LegiScan API (free tier: 30k queries/month). Requires LEGISCAN_API_KEY from legiscan.com. Feeds regulatory_environment dimension. Use state to filter by state, query for custom search, or leave blank for default datacenter/energy keywords. Set utility_id + ingest: true to extract and store signals.
  • urs_fetch_puc_dockets — When the user wants to pull state PUC/PSC docket filings. Supports automated scrapers for AZ (ACC eDocket), NC (NCUC), TX (PUCT Interchange). For other states, use url param to manually fetch + ingest a docket document, or download the file and use urs_ingest directly. Use list_systems: true to see all known PUC systems. Affects all scoring dimensions.
  • urs_arcgis_sync — When the user wants to push scores to a map/ArcGIS.
  • urs_arcgis_pull — When the user wants to pull utility data or scores from ArcGIS. Use persist: true to save pulled utilities into the local DB for lookups and scoring.

Workflow Examples

"I need Arizona utilities" / "Populate the DB" / "Pull utilities into the database"

  1. urs_import_eia with url (if a known EIA-861 CSV URL exists) or file_path to a downloaded CSV
  2. Or urs_arcgis_pull with state: "AZ" and persist: true if ArcGIS already has the data
  3. Then urs_lookup and urs_score as needed

"Get SEC filings for APS" / "Ingest 10-K for Arizona Public Service"

  1. urs_lookup("Arizona Public Service") → utility_id 803
  2. urs_fetch_edgar(utility_id="803") — fetches 10-K and 10-Q, ingests for scoring
  3. urs_score(utility_id="803") to see improved score with new data

"Get FERC Form 1 data for Duke" / "Improve track record for Dominion"

  1. urs_lookup to get utility_id (must have ferc_id in DB)
  2. urs_fetch_pudl(utility_id="6452") — fetches PUDL FERC Form 1, writes track_record signals
  3. urs_score to see improved track_record dimension

"Get EIA retail data for APS"

  1. urs_fetch_eia(utility_id="803") — requires EIA_API_KEY
  2. urs_score(utility_id="803")

"What energy legislation exists in Arizona?"

  1. urs_fetch_legiscan(state="AZ") or urs_fetch_legiscan(utility_id="803")
  2. Bills cached; optionally ingested for regulatory_environment

"Enrich utilities with HIFLD territory data"

  1. urs_fetch_hifld(state="AZ") — fetches and upserts utility metadata

"How responsive is Duke Energy Carolinas?"

  1. urs_lookup("Duke Energy Carolinas") → get utility_id 6452
  2. urs_score(utility_id="6452")
  3. Present score and rationale conversationally

"Compare Duke and Dominion in Virginia"

  1. urs_lookup("Duke Energy") and urs_lookup("Dominion Energy Virginia") — resolve to specific utilities
  2. urs_score for each
  3. Present side-by-side comparison, highlight differences

"I need 200MW online by mid-2027 in North Carolina"

  1. urs_lookup to find NC utilities (Duke Energy Carolinas, Duke Energy Progress, etc.)
  2. Offer to score the relevant ones
  3. When scoring, pass mw_requirement=200, target_isd="2027-06-01"
  4. If user cares about interconnection speed, suggest weight_overrides: { interconnection_speed: 1.5 }

"What energy bills are being proposed in Arizona?" / "Search for datacenter legislation"

  1. urs_fetch_legiscan(state="AZ") — searches with default datacenter/energy keywords
  2. Or urs_fetch_legiscan(state="AZ", query="datacenter AND rate") for specific terms
  3. Review bills, optionally ingest relevant ones with utility_id for scoring

"Get Arizona PUC dockets about datacenters" / "Pull rate case filings from NC"

  1. urs_fetch_puc_dockets(state="AZ", search_query="datacenter") — uses ACC eDocket scraper
  2. Or urs_fetch_puc_dockets(state="AZ", docket_number="E-00000A-25-0069") for specific docket
  3. For unsupported states: urs_fetch_puc_dockets(state="VA", url="https://...", utility_id="13998")
  4. Or download file + urs_ingest(file_path="...", source_type="rate_case", utility_id="13998")
  5. Use urs_fetch_puc_dockets(state="AZ", list_systems=true) to see all known PUC systems

"What dimensions do you score on?" Answer from this skill — no tool call needed.

Presenting Results

  • Lead with composite score and tier label
  • Summarize the rationale in 1–2 sentences
  • Call out dimensions that drove the score (high or low)
  • If confidence is low or dimensions are stale, mention the caveat
  • For comparisons, highlight the dimensions where utilities differ most

Weight Suggestions

  • User needs to be online in 18 months → suggest boosting interconnection_speed
  • User has no clean energy mandate → suggest zero-weighting clean_energy_posture
  • User is hyperscale campus → default weights are fine; use_case affects rationale tone

Limitations to Mention When Relevant

  • Private negotiations — Score reflects visible filings; special contracts filed under seal are invisible
  • State vs. utility — Low regulatory_environment may reflect state constraints, not utility willingness
  • Municipal/coop — Limited public data; expect low confidence
  • Geographic variability — Score is utility-level, not substation-level; Charlotte vs. rural NC may differ