AGENT SKILL

OT/ICS 系统补丁管理

implementing-patch-management-for-ot-systems

为 OT/ICS 环境实施结构化补丁管理程序——在这类环境中,采用 IT 式打补丁可能导致流程中断或安全隐患——涵盖供应商兼容性测试、基于风险的优先级排序、分阶段测试部署、维护窗口协调、回滚程序和补偿性控制。在规划或审计 SCADA、PLC 或其他工业控制系统的补丁工作时使用。

License 许可
Apache-2.0
最近更新
2026-08-31
Stars
★ 3.6w
Forks
4.4k

01 前言 Front Matter

name
implementing-patch-management-for-ot-systems
tags
[ "ot-security", "ics", "scada", "industrial-control", "iec62443", "patch-management", "vulnerability-management" ]
author
mahipal
domain
cybersecurity
license
Apache-2.0
version
1.0.0
nist_csf
[ "PR.IR-01", "DE.CM-01", "ID.AM-05", "GV.OC-02" ]
subdomain
ot-ics-security
description
Implements a structured patch management program for OT/ICS environments where IT-style patching can cause process disruption or safety hazards, covering vendor compatibility testing, risk-based prioritization, staged test deployment, maintenance window coordination, rollback procedures, and compensating controls. Use when planning or auditing patching for SCADA, PLCs, or other industrial control systems.
mitre_attack
[ "T1078", "T1190", "T1059", "T0816", "T0836" ]

02 资源文件 3

03 SKILL.md 正文

Implementing Patch Management for OT Systems

When to Use

  • When establishing a formal OT patch management program for the first time
  • When responding to critical ICS-CERT advisories affecting deployed OT systems
  • When preparing for NERC CIP-007-6 or IEC 62443 patch management compliance audits
  • When planning patch deployment during limited maintenance windows in continuous operations
  • When evaluating compensating controls for systems that cannot be patched

Do not use for IT-only patch management without OT considerations, for emergency patching during active cyber incidents (see performing-ot-incident-response), or for firmware upgrades that change PLC functionality (requires separate change management).

Prerequisites

  • OT asset inventory with firmware/OS versions for all patchable systems
  • Vendor patch notification subscriptions (Siemens ProductCERT, Rockwell, Schneider, etc.)
  • Test/staging environment mirroring production OT systems for patch validation
  • Maintenance window schedule aligned with process shutdowns and turnarounds
  • Change management board approval process including operations and safety representatives

Workflow

Step 1: Establish OT Patch Management Program

Define the patch management lifecycle adapted for OT environments where availability and safety take priority over immediate vulnerability remediation.

#!/usr/bin/env python3
"""OT Patch Management Program Manager.

Tracks patches for OT systems, manages risk-based prioritization,
coordinates testing and deployment, and documents compensating
controls for unpatchable systems.
"""

import json
import sys
from collections import defaultdict
from dataclasses import dataclass, field, asdict
from datetime import datetime, timedelta
from enum import Enum


class PatchStatus(str, Enum):
    IDENTIFIED = "identified"
    EVALUATING = "evaluating"
    TESTING = "testing"
    APPROVED = "approved"
    SCHEDULED = "scheduled"
    DEPLOYED = "deployed"
    DEFERRED = "deferred"
    NOT_APPLICABLE = "not_applicable"


@dataclass
class OTPatch:
    patch_id: str
    vendor: str
    product: str
    affected_versions: str
    cve_ids: list
    cvss_score: float
    ics_cert_advisory: str
    description: str
    status: str = PatchStatus.IDENTIFIED
    identified_date: str = ""
    evaluation_deadline: str = ""  # 35 days per CIP-007
    test_date: str = ""
    deployment_date: str = ""
    affected_assets: list = field(default_factory=list)
    test_results: str = ""
    compensating_controls: str = ""
    risk_rating: str = ""
    maintenance_window: str = ""
    rollback_procedure: str = ""


class OTPatchManager:
    """Manages the OT patch lifecycle."""

    def __init__(self):
        self.patches = []
        self.assets = {}
        self.vendor_feeds = {}

    def add_patch(self, patch: OTPatch):
        """Register a new patch for tracking."""
        # Set evaluation deadline (35 calendar days per NERC CIP-007)
        if not patch.evaluation_deadline:
            identified = datetime.fromisoformat(patch.identified_date)
            patch.evaluation_deadline = (identified + timedelta(days=35)).isoformat()

        self.patches.append(patch)

    def prioritize_patches(self):
        """Risk-based prioritization for OT patches."""
        for patch in self.patches:
            if patch.status in (PatchStatus.DEPLOYED, PatchStatus.NOT_APPLICABLE):
                continue

            # OT-specific risk scoring
            score = patch.cvss_score

            # Increase priority for actively exploited vulnerabilities
            if "CISA KEV" in patch.ics_cert_advisory:
                score += 2.0

            # Increase priority for network-exposed OT systems
            for asset_id in patch.affected_assets:
                asset = self.assets.get(asset_id, {})
                if asset.get("network_exposed"):
                    score += 1.0
                if asset.get("purdue_level") in ("Level 0-1", "Level 2"):
                    score += 1.5

            score = min(score, 10.0)

            if score >= 9.0:
                patch.risk_rating = "critical"
            elif score >= 7.0:
                patch.risk_rating = "high"
            elif score >= 4.0:
                patch.risk_rating = "medium"
            else:
                patch.risk_rating = "low"

    def get_patches_needing_evaluation(self):
        """Get patches approaching evaluation deadline."""
        now = datetime.now()
        approaching = []
        for patch in self.patches:
            if patch.status == PatchStatus.IDENTIFIED:
                deadline = datetime.fromisoformat(patch.evaluation_deadline)
                days_remaining = (deadline - now).days
                if days_remaining <= 7:
                    approaching.append((patch, days_remaining))
        return sorted(approaching, key=lambda x: x[1])

    def defer_patch(self, patch_id, reason, compensating_controls):
        """Defer a patch with documented compensating controls."""
        for patch in self.patches:
            if patch.patch_id == patch_id:
                patch.status = PatchStatus.DEFERRED
                patch.compensating_controls = compensating_controls
                patch.test_results = f"Deferred: {reason}"
                break

    def generate_report(self):
        """Generate patch management status report."""
        self.prioritize_patches()

        report = []
        report.append("=" * 70)
        report.append("OT PATCH MANAGEMENT STATUS REPORT")
        report.append(f"Date: {datetime.now().isoformat()}")
        report.append("=" * 70)

        # Status summary
        status_counts = defaultdict(int)
        for p in self.patches:
            status_counts[p.status] += 1

        report.append("\nPATCH STATUS SUMMARY:")
        for status, count in status_counts.items():
            report.append(f"  {status}: {count}")

        # Approaching deadlines
        approaching = self.get_patches_needing_evaluation()
        if approaching:
            report.append("\nAPPROACHING EVALUATION DEADLINES:")
            for patch, days in approaching:
                report.append(f"  [{patch.patch_id}] {patch.description} - {days} days remaining")

        # Critical/High priority patches
        urgent = [p for p in self.patches
                  if p.risk_rating in ("critical", "high")
                  and p.status not in (PatchStatus.DEPLOYED, PatchStatus.NOT_APPLICABLE)]
        if urgent:
            report.append(f"\nURGENT PATCHES ({len(urgent)}):")
            for p in urgent:
                report.append(f"  [{p.patch_id}] [{p.risk_rating.upper()}] {p.description}")
                report.append(f"    CVEs: {', '.join(p.cve_ids)}")
                report.append(f"    Status: {p.status}")
                report.append(f"    Affected Assets: {len(p.affected_assets)}")

        # Deferred patches with compensating controls
        deferred = [p for p in self.patches if p.status == PatchStatus.DEFERRED]
        if deferred:
            report.append(f"\nDEFERRED PATCHES ({len(deferred)}):")
            for p in deferred:
                report.append(f"  [{p.patch_id}] {p.description}")
                report.append(f"    Reason: {p.test_results}")
                report.append(f"    Compensating Controls: {p.compensating_controls}")

        return "\n".join(report)


if __name__ == "__main__":
    manager = OTPatchManager()

    # Example patches
    manager.add_patch(OTPatch(
        patch_id="OT-PATCH-001",
        vendor="Siemens",
        product="SIMATIC S7-1500",
        affected_versions="< V3.0.1",
        cve_ids=["CVE-2023-44374"],
        cvss_score=8.8,
        ics_cert_advisory="ICSA-23-348-01",
        description="S7-1500 memory corruption via crafted packets",
        identified_date="2026-01-15",
        affected_assets=["PLC-01", "PLC-02", "PLC-03"],
    ))

    manager.add_patch(OTPatch(
        patch_id="OT-PATCH-002",
        vendor="Rockwell Automation",
        product="FactoryTalk View SE",
        affected_versions="< V13.0",
        cve_ids=["CVE-2024-21914"],
        cvss_score=7.5,
        ics_cert_advisory="ICSA-24-046-02",
        description="FactoryTalk View remote code execution",
        identified_date="2026-02-01",
        affected_assets=["HMI-01", "HMI-02"],
    ))

    print(manager.generate_report())

Step 2: Test Patches in Staging Environment

Never deploy patches directly to production OT systems. Use a test environment that mirrors production to validate patch compatibility.

# OT Patch Testing Procedure
patch_testing:
  environment:
    description: "Staging lab mirroring production OT architecture"
    components:
      - "Virtual PLC simulators matching production firmware"
      - "Test HMI stations with identical software versions"
      - "Test historian with representative data"
      - "Network configuration matching production VLANs/firewalls"

  test_cases:
    functional:
      - "PLC programs execute correctly after OS patch"
      - "HMI displays update with correct process values"
      - "Historian data collection continues uninterrupted"
      - "Alarm and event handling functions properly"
      - "Communication between PLCs maintains cycle time"
      - "Safety system trip tests pass (if SIS affected)"

    performance:
      - "PLC scan time remains within acceptable limits (<50ms increase)"
      - "HMI screen refresh rate unchanged"
      - "Historian collection interval maintained"
      - "Network latency between zones unchanged"

    compatibility:
      - "Third-party applications function correctly"
      - "OPC UA/DA connections establish successfully"
      - "Custom scripts and batch processes execute"
      - "Backup and restore procedures work"

    rollback:
      - "System can be reverted to pre-patch state"
      - "Rollback procedure documented and tested"
      - "Estimated rollback time: [N] minutes"

  documentation:
    required:
      - "Test plan with pass/fail criteria"
      - "Test execution results with screenshots"
      - "Performance measurements before and after"
      - "Sign-off by operations, engineering, and security"

Key Concepts

Term Definition
Compensating Control Alternative security measure applied when a patch cannot be deployed, such as firewall rules, IPS signatures, or network isolation
Vendor Compatibility Confirmation from the OT vendor that a patch (especially OS patches) is compatible with their control system software
Maintenance Window Scheduled period for system modifications, aligned with process shutdowns or reduced-risk operational periods
Virtual Patching Deploying IDS/IPS rules to detect and block exploitation attempts for known vulnerabilities without modifying the target system
Evaluation Deadline NERC CIP-007-6 requires patch evaluation within 35 calendar days of availability
Turnaround Major scheduled shutdown of a process unit for maintenance, providing opportunity for extensive OT patching

Tools & Systems

  • WSUS/SCCM: Microsoft patch management for Windows-based OT systems (HMIs, historians, engineering workstations)
  • Siemens ProductCERT: Siemens security advisory service for industrial products
  • Claroty xDome: OT vulnerability management with patch availability tracking and risk scoring
  • Tripwire Enterprise: Configuration monitoring detecting unauthorized changes and tracking patch status

Output Format

OT Patch Management Report
============================
Reporting Period: YYYY-MM to YYYY-MM

PATCH STATUS:
  Identified: [N]
  Evaluating: [N]
  Testing: [N]
  Deployed: [N]
  Deferred: [N]

COMPLIANCE:
  Evaluated within 35 days: [N]/[N] (CIP-007-6 R2)
  Deployed or mitigated: [N]/[N]
  Deferred with compensating controls: [N]

04 同仓库更多 Skills

mukul975
mukul975/Anthropic-Cybersecurity-Skills

SLSA 构建来源验证

verifying-build-provenance-with-slsa-sigstore

使用 Sigstore 的 cosign(verify、verify-attestation、verify-blob-attestation)和 slsa-verifier(verify-artifact)验证工件签名和 SLSA 来源(provenance),强制校验 keyless OIDC 构建者身份和源仓库是否符合 SLSA Build 级别。适用于 CI/CD 中部署工件前、消费第三方证明时、建立 SLSA Build L3 管道,或在事件响应或准入控制期间确认来源的场景。

安全工程师软件供应链安全
★ 3.6w
mukul975
mukul975/Anthropic-Cybersecurity-Skills

TPM 测量启动验证

validating-tpm-measured-boot-attestation

使用 tpm2-tools 验证 TPM 2.0 测量启动(measured boot)的完整性和远程证明:读取 PCR(tpm2_pcrread)、重放启动事件日志、生成并检查签名报价(tpm2_quote/tpm2_checkquote),以及将机密封印(seal)到 PCR 策略。适用于确认系统已启动可信固件/内核以实现零信任(Zero Trust)设备状态、通过 PCR 漂移检测启动链篡改,或构建黄金值基线用于机群(fleet)证明。

安全工程师终端安全加固
★ 3.6w
mukul975
mukul975/Anthropic-Cybersecurity-Skills

备份完整性验证

validating-backup-integrity-for-recovery

通过加密哈希验证、自动化恢复测试、损坏检测和可恢复性检查来验证备份完整性,确认备份对于灾难恢复和勒索软件响应是可靠的。适用于在依赖备份进行恢复之前、构建备份后验证管道、审计备份基础设施以满足合规要求,或检查不可变/air-gapped(气隙)备份是否存在静默损坏或篡改的场景。

SRE 工程师备份与灾难恢复
★ 3.6w
mukul975
mukul975/Anthropic-Cybersecurity-Skills

KAPE Windows 取证收集

triaging-windows-with-kape

运行 KAPE(Kroll Artifact Parser and Extractor),通过 Targets 收集目标取证工件(注册表配置单元、$MFT、事件日志、prefetch、浏览器数据),并使用封装 Eric Zimmerman 的 EZ Tools(PECmd、MFTECmd、RECmd)的 Modules 进行解析。适用于事件遏制/分诊早期阶段——此时完整磁盘镜像不切实际,但需要快速获得可采信、可解析的 Windows 工件集,包括大规模远程收集。

安全工程师数字取证与电子证据分析
★ 3.6w
mukul975
mukul975/Anthropic-Cybersecurity-Skills

SSVC 漏洞优先级分诊

triaging-vulnerabilities-with-ssvc-framework

使用 CISA 的 Stakeholder-Specific Vulnerability Categorization(SSVC,利益相关方特定漏洞分类)决策树对漏洞进行分诊和优先级排序,权衡利用状态(通过 CISA KEV 目录和 FIRST EPSS API)、技术影响、自动化程度和任务普遍性,输出 Track/Track*/Attend/Act 决策。适用于对漏洞扫描结果(OpenVAS、Nessus、Qualys)进行优先级排序以制定修复计划,而不局限于原始 CVSS 分数的场景。

安全工程师安全公告与漏洞管理
★ 3.6w
mukul975
mukul975/Anthropic-Cybersecurity-Skills

安全事件初步分诊

triaging-security-incident

使用 NIST SP 800-61r3 和 SANS PICERL 框架对安全事件进行初步分诊,分类事件类型、按业务影响分配优先级,并路由到相应的响应团队。适用于 SIEM/EDR 告警需要人工分类、并发告警必须确定优先级,或用户报告或威胁情报 IOC 匹配需要初步事件分类的场景。

安全工程师安全事件响应与威胁狩猎
★ 3.6w