AGENT SKILL

Apache Asyncband 发布流程

release

运行或恢复 Apache Asyncband (Incubating) 的发布流程,从其跟踪工单和冻结源码开始,涵盖 RC 构建、ATR 投票、发布及后续跟进;也可验证现有候选版本。

适用职业发布经理
License 许可
Apache-2.0
所属仓库
apache/asyncband
最近更新
2026-11-14
Stars
★ 294
Forks
57

01 前言 Front Matter

name
release
description
Run or resume an Apache Asyncband (Incubating) release, from its tracking issue and frozen source through RC composition, ATR voting, publication, and follow-up; also verify an existing candidate.

02 资源文件 4

03 SKILL.md 正文

<!-- Licensed to the Apache Software Foundation (ASF) under one or more contributor license agreements. See the NOTICE file distributed with this work for additional information regarding copyright ownership. The ASF licenses this file to you under the Apache License, Version 2.0 (the "License"); you may not use this file except in compliance with the License. You may obtain a copy of the License at

http://www.apache.org/licenses/LICENSE-2.0

Unless required by applicable law or agreed to in writing, software distributed under the License is distributed on an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. See the License for the specific language governing permissions and limitations under the License. -->

Release Apache Asyncband (Incubating)

Use the release tracking issue to coordinate the release. The normal path assumes that signing, GitHub environments, ATR, and crates.io Trusted Publishing are already configured: GitHub builds and stages the candidate; ATR runs the votes and publishes the approved source; the final Git tag publishes the convenience crate.

Follow the steps below for a new release, or resume from the tracking issue and current GitHub/ATR state. For an independent candidate check, use verification.

1. Choose the version and open the tracking issue

Choose the stable VERSION (X.Y.Z) from the changes since the previous published release; the semver check below validates compatibility. Record a source cutoff commit and any work deferred to a later release.

Find an existing Tracking Issue to Release ${VERSION} before creating one. Otherwise, create it immediately from the tracking issue template. Use it as the release record: link the release PR, checked revisions, workflow runs, candidate, votes, and publication results; update completed items with evidence and keep the next action current.

2. Audit first, prepare the version, and freeze the source

Audit the selected checkout with the license-audit skill.

Prepare a release PR from the chosen scope: update asyncband/Cargo.toml, refresh Cargo.lock with Cargo, and move the final user-visible changelog entries from Unreleased into an undated v${VERSION} section, leaving Unreleased empty. Include necessary audit corrections; defer unrelated source changes. Respect required CI and merge authorization.

Review the merged PR's tree, including any changes added since the source cutoff, and update affected audit results. Record its merge commit as RELEASE_COMMIT in the issue. Use a detached checkout of this frozen snapshot for all remaining checks and tags:

RELEASE_DIR="$(mktemp -d "${TMPDIR:-/tmp}/asyncband-release.XXXXXX")"
git fetch https://github.com/apache/asyncband.git main
git worktree add --detach "${RELEASE_DIR}/checkout" "${RELEASE_COMMIT}"
cd "${RELEASE_DIR}/checkout"
test -z "$(git status --porcelain)"

Keep scratch artifacts outside the repository. If a check requires a correction, prepare a new reviewed commit and replace the recorded snapshot explicitly; recheck the affected results. After an RC tag exists, changed release contents require a new RC number. Never silently move an existing tag or change the files under a vote.

3. Check the frozen checkout

Read cargo x --help and each relevant subcommand's help, then run:

cargo x lint
cargo x check
cargo x test --no-capture
RUSTUP_TOOLCHAIN=1.86.0 cargo x test --no-capture
cargo x semver --release-version "${VERSION}"
cargo publish --package asyncband --locked --dry-run

Record results against RELEASE_COMMIT, including its required CI result. Pass the generated target/package/asyncband-${VERSION}.crate to the license review.

For a semver-major release, including a pre-1.0 minor bump, document and review expected API breaks before rerunning cargo x semver --release-version "${VERSION}" --acknowledge-breaking-changes. An incompatible patch release needs a corrected version or source before the snapshot can pass.

4. Push the RC and verify the ATR candidate

Use the release manager's personal OpenPGP code-signing key. It must be valid for signing, have a user ID containing their <asf-id>@apache.org address, and have its public key published in the KEYS file. A new release manager appends their exported public key to that file in https://dist.apache.org/repos/dist/release/incubator/asyncband, keeping every existing key; ATR imports the committee's keys from there. List the matching local keys and set SIGNING_KEY_FINGERPRINT to the selected key's primary fingerprint:

gpg --list-secret-keys --with-fingerprint '<asf-id>@apache.org'
SIGNING_KEY_FINGERPRINT='<primary key fingerprint>'

Set RC to the next unused positive candidate number. The package and ATR version remain ${VERSION}; only the Git tag carries the RC suffix:

RC_TAG="v${VERSION}-rc.${RC}"
test "$(git rev-parse HEAD)" = "${RELEASE_COMMIT}"
test -z "$(git status --porcelain)"
git tag --sign --local-user "${SIGNING_KEY_FINGERPRINT}" "${RC_TAG}" --message "Apache Asyncband (Incubating) ${VERSION} release candidate ${RC}" "${RELEASE_COMMIT}"
git verify-tag "${RC_TAG}"
git push https://github.com/apache/asyncband.git "${RC_TAG}"

Follow both workflows for this tag:

  • Release checks the ${VERSION} Cargo package.
  • Compose source release builds apache-asyncband-${VERSION}-incubating-src.tar.gz and its checksum. After a release environment reviewer listed in .asf.yaml approves its job, which the release manager can do when listed there, it signs with the automated project key and uploads the archive, .asc, and .sha512 to ATR project asyncband, version ${VERSION}.

Open the candidate in ATR, inspect its checks, and record its URL, ATR revision, workflow run, and SHA-512 in the issue. Download that revision and complete verification and license-audit on the actual distributions before voting. The release_verifier and license_auditor agents can perform these checks independently; reuse completed checks for the same candidate.

5. Vote and publish through ATR

Follow the ATR operations guide. In the configured email-vote mode, the normal sequence is:

  1. Review the candidate and vote email, then start the PPMC vote in ATR.
  2. After at least 72 hours and sufficient PPMC votes, review the tally and resolve it as Passed. ATR sends the result and starts the IPMC vote automatically; check that thread and supply the PPMC result/tally link and any carried IPMC votes if missing.
  3. After at least another 72 hours and sufficient binding IPMC votes, review and resolve that vote as Passed. ATR sends the result and moves the release to Finish.
  4. In Finish, publish the exact approved revision to ASF distribution, or verify the completed automatic publication if it was enabled. Keep the candidate bytes unchanged.

Record both rounds' [VOTE] threads and [RESULT] messages in the tracking issue using their lists.apache.org permalinks.

6. Publish the crate and close the issue

Once both votes have passed and the source publication is confirmed, create the signed final tag at the approved commit:

git verify-tag "${RC_TAG}"
test "$(git rev-parse "${RC_TAG}^{commit}")" = "${RELEASE_COMMIT}"
git tag --sign --local-user "${SIGNING_KEY_FINGERPRINT}" "v${VERSION}" --message "Apache Asyncband (Incubating) ${VERSION}" "${RELEASE_COMMIT}"
git push https://github.com/apache/asyncband.git "v${VERSION}"

Have a release environment reviewer approve the final tag's deployment in release.yml, then verify crates.io, docs.rs, and the ASF downloads. Update the Downloads page in apache/asyncband-site to the new release and publish it before announcing; the announcement points readers there, and archiving the prior release removes the files that page lists. Use ATR's Announce action after both distributions are available; review the message and recipients and record the announcement. Submit the changelog publication-date PR, confirm any superseded-release archival, and close the tracking issue after its required items are complete. Remove the detached worktree and scratch directory when no longer needed.

Resume or recover

Use the issue's frozen commit and candidate revision rather than the latest main. Reuse an existing tag after checking its signature and target. For uncertain uploads, votes, or publications, inspect ATR and the destination before repeating an action; signing/upload retries can create a new signature and revision. See ATR recovery. For a failed crates.io run, check whether that version already exists before retrying; a published package is immutable.

Consult infrastructure for setup or access failures. Resolve repository paths from the caller's supplied repository root.

04 同仓库更多 Skills